SPECS_VOL 2.pdf

PDF 19 MB Posted

Attached to
Design-Build 3rd Floor Surgery Addition, Grand Junction, CO
Solicitation number
W91238-09-R-0054
Issued by

About this file

Specifications W91238-09-R-0054

View the file

Other files

File Type Posted
SF30 Amend 0004.pdf PDF
Amend 0003 Specs and Drawings.pdf PDF
SF30 Amend 0003.pdf PDF
Amend 0002 SF30 MOD.pdf PDF
Amend 0002 Wage Determination.pdf PDF
Amend 0002 Div 01 Specifications.pdf PDF
GJ FIO_Part3of3.pdf PDF
GJ FIO_Part2of3.pdf PDF
GJ FIO_Part1of3.pdf PDF
SF30 Amend 1 09-R-0054.pdf PDF
Amend 0001 Div 01.pdf PDF
Pre-Proposal Conf Minutes 9 Sep 09.pdf PDF
Sign In Sheet 9 Sept 09.pdf PDF
RFP 09-R-0054.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR PROPOSALS (RFP) VOLUME 2 of 2__

VA - Grand Junction 3rd Floor Add. to Surgery Center

GRAND JUNCTION, COLORADO

VOLUME 1 - BID DOCUMENTS (DIVISION 00)

VOLUME 2 - ATTACHMENTS thru TECHNICAL SPECIFICATIONS

RFP NO. W91238-09-R-0054

SPECIFICATION NO. 1678

DRAWING FILE NO. 515-25-004

US ARMY CORPS OF ENGINEERS

Sacramento District _______________________

VA - Grand Junction 1678 3rd Floor Add. to Surgery Center

VOLUME 2 of 2

Table of Contents (Volume 2 of 2)

ATTACHMENTS

1 Not Used 2 Not Used 3 Not Used 4 Contractor Prepared As-Builts 5 MILCON Project Closeout (Red Zone Meeting) 6 Not Used 7 Drawing Format

TECHNICAL SPECIFICATIONS

DIVISION 01

01 00 00 General Requirements 01 10 00 Statement of Work 01 10 10 Specific Technical Engineering & Design Criteria (and Appendices)

Appendix A Drawing List Appendix B Code Summary Appendix C Electrical Service Test Results Appendix D Current Electrical 1-Line Diagram Appendix E Fire Flow Test Results Appendix F Geotechnical Report Appendix G Hazardous Materials Report Appendix H LEED Credits Checklist Appendix I Potential Plan Changes Appendix J Medical Equipment List Appendix K Room List – Surgery Addition Appendix L Site Utilities Plan Appendix M Utility Service Providers and Mar 09 Bills Appendix N Drawings Appendix O Base Bid and Additive Options Plan Appendix P Domestic Water Quality Data Appendix Q OR HVAC Criteria Appendix R Boiler and Chiller Plant Utility Usage Chart Appendix S Applicable Codes and Design Criteria

01 10 11 Functional Design Criteria (Room by Room Sheets) 01 10 12 Design After Award 01 32 01.00 10 Project Schedule

01 33 00 Submittal Procedures 01 35 26 Governmental Safety Requirements 01 42 00 Sources for Reference Publications 01 45 02.00 10 Quality Control System (QCS) 01 45 04.00 10 Contractor Quality Control 01 50 02.00 10 Temporary Construction Facilities 01 57 20.00 10 Environmental Protection 01 62 35 Recycled / Recovered Materials 01 78 02.00 10 Closeout Submittals

ATTACHMENTS

ATTACHMENT NO. 1

NOT USED

ATTACHMENT NO. 2

ATTACHMENT NO. 3

ATTACHMENT NO. 4

CONTRACTOR PREPARED AS-BUILTS

Preparing As-Built Drawings INSP05L0.DOC Effective 09/13/04 Rev 1

Preparing As-Built Drawings

Scope

This instruction covers preparing high-quality As-Built drawings to show changes made to the project during construction. As-Built drawings are an official record of the project at the time of construction completion. The original "as-designed" contract drawings and specifications are modified to show all additions, deletions and other changes made during construction. Accurate as-built drawings are very important for project operation and maintenance, and future modifications, particularly for plumbing and electrical systems, which are hidden from view.

References − CADD/GIS Technology Center Architectural, Engineering, and Construction

(A/E/C) CADD Standards[http://tsc.wes.army.mil/products/standards/aec/intro.asp]

Definitions.

See the Glossary of Engineering Quality System Terms and Acronyms [REFQ10L0], for definitions.

Contractor Markups - Drawings that are marked and annotated to show the project As-Built and constructed by the contractor. They are part of the working as-built set.

As-Built Drawings - The amended "As-designed" drawings revised to show the project as the contractor built and constructed it. The revisions from Contractor Markups and field inspection notes are transferred to the Final as-built set of drawings. The final as-built drawings include modifications during construction, field requested changes, shop drawing modifications, and contractor designs.

As-Constructed Drawings - These are As-Built Drawings for Civil Works Projects. The term As-Built used in these instructions is synonymous.

Working As-Built

The Contractor shall maintain 2 sets of paper drawings and specifications (marked-up prints) to track changes, additions or deletions from the original design during construction. Working as-built drawings shall be kept current on a weekly basis and at least one paper set of as-built drawings shall be available on the jobsite at all times.

Areas of Concern

There are some general items that need some special checking to ensure that the marked-up prints are complete and accurate. The working as-built shall show, but shall not be limited to, the following:

Copyright © Oracle Corporation, 2002. All rights reserved. Content written by USACE, Sacramento District, Engineering Division

Rev 1

(1) The actual location, kinds and sizes of all of existing and new utility lines, especially underground lines within the construction area. Measurements will be shown for all change of direction points and all surface or underground components such as valves, manholes, drop inlets, clean outs, meters, etc. The descriptions of exterior utilities shall include the actual quantity, size, and material of the utility lines. In order that the location of these lines and appurtenances may be determined in the event the surface openings or indicators become covered over or obscured, the as-built drawings shall show, by offset dimensions to two permanently fixed surface features, the end of each run including each change in direction. Valves, splice boxes and similar appurtenances shall be located by dimensioning along the utility run from a reference point. The average depth below the surface of each run shall also be recorded.

(2) The location and dimensions of any changes within the building structure.

(3) Layout and schematic drawings of electrical circuits and piping.

(4) Correct dimensions and details transferred from shop drawings.

(5) Correct grade, elevations, cross section, or alignment of roads, earthwork, structures or utilities if any changes were made from contract plans.

(6) Actual location of anchors, construction and control joints, etc., in concrete.

(7) Changes in location of equipment and architectural features.

(8) Where contract drawings or specifications present options, only the option selected for construction shall be shown on the final as-built prints. Cross out such words and phrases as "optimal requirement," "or equal," etc., and list specifically the items of material provided.

(9) Unusual or uncharted obstructions that are encountered in the contract work area during construction.

(10) Location, extent, thickness, and size of stone protection particularly where it will be normally submerged by water.

(11) Changes in details of design or additional information obtained from working drawings specified to be prepared and/or furnished by the Contractor; including but not limited to fabrication, erection, installation plans and placing details, pipe sizes, insulation material, dimensions of equipment foundations, etc.

(12) The topography, invert elevations and grades of drainage installed or affected as part of the project construction.

(13) If borrow material for this project is from sources on Government property, or if Government property is used as a spoil area, the Contractor shall furnish a contour map of the final borrow pit/spoil area elevations.

Copyright © Oracle Corporation, 2002. All rights reserved. Content written by USACE, Sacramento District, Engineering Division

Rev 1

(14) Systems designed or enhanced by the Contractor, such as HVAC controls, fire alarm, fire sprinkler, and irrigation systems

(15) Changes or modifications that result from the final inspection.

Mark-up Guidelines

The following information is provided to improve the quality of the marked-up prints and thereby facilitate preparation of final as-built drawings. The most important guideline is that the marked-up changes on the prints shall be complete and understandable. Visits to the site by the draftsperson, or visits to the draftsperson by the construction superintendent, can be minimized by providing complete and understandable marked-up prints.

(1) Frequently use written explanations on As-Built drawings to describe changes - do not rely totally on graphic means to convey the revision.

(2) Legibility of lettering and digit values shall be precise and clear when marking prints, and clarify ambiguities concerning the nature and application of change involved.

(3) Wherever a revision is made, make changes to affect related section views, details, legend, profiles, plans and elevation views, schedules, notes and call-out designations, and mark accordingly to avoid conflicting data on all other sheets.

(4) When changes are made, cross out all features, data and captions that relate to that revision.

(5) When changes are required on small-scale drawings and in restricted areas, suggest large-scale inserts be drawn or sketched, with leaders to the location where applicable.

(6) Provide a legend if colors other than the "base" colors of red, green, and blue are used.

Be sure descriptive markings conform to legend symbols shown.

(7) Be sure to add and denote in legend, any additional equipment or material facilities, service lines, etc., incorporated under As-Built Revision if not already shown in legend.

(8) When attached prints (or sketches) are provided with marked-up print, indicate whether:

a. Entire drawing shall be added to contract drawings or

b. Whether the contract drawings shall be changed to agree, or

c. For reference only to further details not required for initial design.

(9) Make the comments on the drawing complete without reference to letters, memo's, or materials that are not also a part of the As-Built. Annotating the drawing, “Per Change Order #42,” means nothing when the actual change order states, “added an additional 12 duplex” outlets or similar statements. The same is true when the drawing is marked, Copyright © Oracle Corporation, 2002. All rights reserved. Content written by USACE, Sacramento District, Engineering Division

Rev 1

“changed per COE instructions.” This office and ultimately the using organizations must know what was changed, how it was changed, where the items(s) were relocated to and how the affected connections were altered. Change Orders usually do not provide information as to how the facility was changed, only what was changed.

(10) The markups shall be accomplished on blue or black line prints of the most current originals.

(11) Shop drawings are to be incorporated into the As-Built drawings. They will be provided in electronic CADD file format and conform to the Sacramento District CADD Standards and the A/E/C CADD Standards. Hand drawn or plotted paper shop drawings will not be accepted as submittals.

The hand drawn or plotted paper shop drawings are not usable as original drawings for several reasons.

a. Deleted

b. The drawings are not of an adequate scale or are drawn to no scale and are not transferable to the CORPS drawings due to lack of information.

c. The limited numbers of reproducible shop drawings that have been received have not been on the Corps of Engineers standard sheets sizes making it difficult to convert these drawings to standard COE drawings.

Any drawing provided by non-COE sources will be drawn in CADD. Sheets shall be drawn at the same scale as similar drawings in the set (example: Fire alarm systems shall be drawn to the same scale as the plumbing or electrical drawings). The drawing shall meet the same standards required for the rest of the drawings set. Sheet number, detail number, etc shall tie details and sketches to existing drawings.

FINAL AS-BUILT DRAWINGS

The contractor will transfer the changes from the working as-built marked prints to the original electronic CADD files. Final as-built drawings shall be prepared after the completion of each definable feature of work as listed in the Contractor Quality Control Plan (Foundations, Utilities, Structural Steel, etc., as appropriate for the project). The Resident Engineer and the Contractor will jointly review the working as-built marked prints, printouts from working as-built CADD file drawings, and final as-built drawings for accuracy and completeness, prior to submission of each monthly pay estimate. Monthly review of working as-built CADD printouts shall at minimum cover all sheets revised since the previous review.

DRAFTING STANDARDS

The Corps requires that standard professional engineering drafting practices be utilized in correcting the original electronic CADD drawings to show as-built conditions. In general, the letter styles, line thickness, and scale will be the same as the original drawings. When shop drawings or other sheets are added, they will be drawn in electronic CADD.

Copyright © Oracle Corporation, 2002. All rights reserved. Content written by USACE, Sacramento District, Engineering Division

Rev 1

CADD Standards: File Naming Convention will be maintained on all existing CADD files and followed for any new files added. The Contractor shall revise CADD files as-built drawing layers, to show the as-built conditions during the prosecution of the project. All as-built “triangle” changes shall be on a separate single layer, using a single color, with an associated medium pen width.

• Name the layer AS-BUILT for AutoCAD files (DWG).

• MicroStation files (DGN) use:

− Level #63 − Level/Layer Name contains: ANNO-REVS − Level/Layer Description: Revisions

The following specific requirements apply to the preparation of as-built drawings:

The Title Sheet (first sheet): The first sheet will be labeled with the word AS-BUILT. The words CONTRACT NUMBER and the actual contract number will be entered as shown on attachment

1. The contract number contains the Fiscal Year, the letter C (for construction), and the sequence number (example: 96-C-0000). No other work need be done on this sheet unless sheets are being added or deleted from the List of Drawings or other actual changes are made on this sheet. (See Attachment 1.)

The second and subsequent sheets: All the sheets following the title sheet will be labeled with the AS-BUILT stamp. (See Attachment 2.)

Signature representation (CADD files only): All signatures that appear on the approved original design drawings need to be represented on all the electronic as-built files. The format for these are /s/Name (i.e. /s/Raymond Dennis). The only name that does not require the /s/ is the District Commander’s name that appears only on the cover sheet (the title sheet). (See Attachments 1 & 2.)

Revisions Block entries: Those sheets, which have no changes, will only be labeled AS-BUILT as described above. Those sheets which have changes shown on them will have REVISED AS-BUILT entered in the first available space. This will be revision one and a number 1 will be entered in the triangle at the beginning of that line. In the event the sheet has already been revised and a number and revision appear in the revision lines the next sequential number will be used. Normally the first entry is made in the first line. The completed originals CADD file drawings will be reviewed for accuracy and initialed by the Contractor. (See Attachments 2 & 3.)

Marking Revisions: Place an equilateral triangle (3/8" per side) near the area revised for all changes. One triangle may be placed near the table or detail title where several items in a table or detail are changed or completely redrawn. This same method may be used for general revisions to floor plans and system plans (plumbing, electrical, a/c, heating); when a major portion of the drawing is changed, the triangle may be placed near the diagram, detail, section or plans title. A triangle will be placed near each item when only a few items are revised, added or

Copyright © Oracle Corporation, 2002. All rights reserved. Content written by USACE, Sacramento District, Engineering Division

Rev 1 deleted. The triangles will contain the same number as the As-Built revision on that sheet. (See Attachment 4.)

Revision Annotations:

Deletion - to show an item was not installed, cross the item out on the drawing along with any associated devices, connecting lines, ducts, pipes etc., including notes and dimensions.

To show a detail is not being used, box the detail and letter NOT USED across the detail. A box will be drawn on the sheet with an X as shown in Attachment 5. The words NOT USED will be in heavy block lettering a minimum of 5/8" high. Place a triangle and revision number inside the box where notes are indicated as not being used.

Notes - draw a line thru the note or line item in a table in lieu of erasing the line item or note. A triangle and number will be placed near the deleted item.

Additions - show a new or additional item or items and associated connections made if the print indicates such connections. A triangle and number will be placed near the new item.

All lettering will conform to the existing lettering on each sheet.

Relocations - draw the item in the new location and erase it from the old location. All connections will be transferred if applicable, such as wiring, piping, and ducts. Revision triangles with appropriate number will be shown at the new and old location.

Drawing continuity: The applicable drawings shall be marked-up when a change was made, although this will not always be the case. Final responsibility for drawing continuity is with the person doing the As-Built. When one floor plan indicates a wall, room, doors etc., has been changed, the same change shall be made on all other applicable drawings. When the change is applicable to only one discipline such as electrical and does not directly affect other discipline sheets, a note may be added to other discipline sheets such as "See sheet _____ for As-Built Conditions.”

Shop drawings: When shop drawings are added to the original contract drawing set they need to be appropriately labeled with the Sacramento District file number, and discipline and sequence sheet number. The Index of Drawings will also need to be revised to show the additional sheet

(s) with the appropriate sheet title. In the case where the shop drawing are smaller than the Corps standard sheet size (i.e. 8.5"x11" or 11"x17" etc.) the sheets will be cut into a standard Corps sheet size border sheet and appropriately labeled. (For additional information refer to Mark-up Guidelines, Shop drawings above.)

Distribution

Archives Unit

Contractor*

Resident Engineer*

Specification Engineer

Copyright © Oracle Corporation, 2002. All rights reserved. Content written by USACE, Sacramento District, Engineering Division

Rev 1

Ownership

The Archives Unit [Raymond.E.Dennis@usace.army.mil?Subject=INSP05L0-Preparing As- Built Drawings] is responsible for ensuring that this document is necessary and that it reflects actual practice.

Activity Preface

These tasks are performed whenever changes, additions or deletions from the original "as-designed" contract drawings and specifications are made during construction.

Prior Activity

Creation, Packaging, and Delivery of Project Documents [PROP09L0]

Contractor

1. Print two sets of paper drawings and specifications for working as-built.

The Contractor shall maintain 2 sets of paper drawings and specifications (marked-up prints) to track changes, additions or deletions from the original design during construction.

2. Mark working as-built set to show changes, additions or deletions.

Place an equilateral triangle (3/8" per side) near the area revised for all changes. One triangle may be placed near the table or detail title where several items in a table or detail are changed or completely redrawn. This same method may be used for general revisions to floor plans and system plans (plumbing, electrical, a/c, heating); when a major portion of the drawing is changed, the triangle may be placed near the diagram, detail, section or plans title. A triangle will be placed near each item when only a few items are revised, added or deleted. The triangles will contain the same number as the As-Built revision on that sheet.

(See Attachment 4.)

Changes, additions or deletions will immediately be noted on each of the working as-built set by redline process. No other marks, doodles, notes, or annotations shall be put on these sets of working as-built prints. All changes from the contract plans, which are made in the work, or additional information which might be uncovered in the course of construction will be accurately and neatly recorded as they occur by means of details and notes.

All changes and/or required additions to the paper prints will be clearly identified in color contrasting to black, as follows:

Colors shall be the "base" colors of red, green, and blue. Color code for changes shall be as follows:

(1) Deletions (red) - Deleted graphic items (lines) shall be colored red with red lettering in notes and leaders.

Copyright © Oracle Corporation, 2002. All rights reserved. Content written by USACE, Sacramento District, Engineering Division

Rev 1

(2) Additions (Green) - Added items shall be drawn in green with green lettering in notes and leaders.

(3) Special (Blue) - Items requiring special information, coordination, or special detailing or detailing notes shall be in blue.

The working as-built sets will be annotated in as much detail as necessary to clarify exactly what construction changes were performed.

3. Transfer the changes from the working as-built marked prints to the "as-designed" electronic CADD files.

The contractor will transfer the changes from the working as-built marked prints to the original electronic CADD files on a monthly basis. Final as-built drawings shall be prepared after the completion of each definable feature of work as listed in the Contractor Quality Control Plan (Foundations, Utilities, Structural Steel, etc., as appropriate for the project).

If Project feature complete, goto task #4. Otherwise, goto task #2.

4. Submit As-Built drawings for review.

The contractor shall submit the Final As-built conditions on a new CD to the Resident Engineer in the customer specified electronic format as a Government, District Office Approval (G, DO) required submittal.

Resident Engineer

5. Review As-Built drawings.

The Resident Engineer and the Contractor will jointly review the working as-built marked prints, printouts from working as-built CADD file drawings, and final as-built drawings for accuracy and completeness, prior to submission of each monthly pay estimate. Monthly review of working as-built CADD printouts shall at minimum cover all sheets revised since the previous review.

If As-built OK, goto task #7. Otherwise, goto task #6.

6. Note required corrections on submittal and return to Contractor.

Goto task #3.

7. Notify Contractor of submittal acceptance.

If Final Submittal, End of activity; Goto Managing As-Built & As-Constructed Drawings [PROQ08L0]. Otherwise, goto task #2.

Copyright © Oracle Corporation, 2002. All rights reserved. Content written by USACE, Sacramento District, Engineering Division

Rev 1

Flow Chart Preparing As-Built Drawings

PROP09L0

Start

Contractor Print two sets of paper drawings & Specs for working as-built. (1)

Contractor Mark working as-built set to show changes, additions or deletions. (2)

Contractor Transfer changes from working as-built marked prints to "as-designed" electronic CADD files. (3)

Proj feature complete?

Contractor Submit As-Built drawings for review.

(4)

Resident Engr Review As-Built drawings. (5)

As-built OK?

Resident Engr Note required corrections on submittal & return to Contractor. (6)

Resident Engr Notify Contractor of submittal acceptance. (7)

Final Submittal?

End

PROQ08L0

A

B

B

A

Y

N

Y

N

Y

N

Copyright © Oracle Corporation, 2002. All rights reserved. Content written by USACE, Sacramento District, Engineering Division

ATTACHMENT NO. 5

MILCON PROJECT CLOSEOUT

(RED ZONE MEETING)

SAMPLE

Red Zone Meeting Checklist

Date:_____________

Contract No.

Description / Location

Contractor Contracting Officer

Action Completion Milestone √

Inspections Fire

Safety Pre-final

Mechanical Test & Balance Commissioning Landscaping Complete Beneficial Occupancy Date (BOD) Furniture Installation Comm Installation As-Built Contract Drawings Provide all O&M manuals, tools, shop drawings, spare parts, etc. provided to customer

Provide Warranty documents to Customer

Contract completion Final Inspection User move-in DD Form 1354, Transfer of Real Property completed & signed

Ribbon cutting DD Form 2626 - Construction Contractor Performance Evaluation

DD Form 2631 – A-E Performance Rated after Construction

Final Payment Completed Release of Claims Return of Unobligated Funds Move Project from CIP to General Ledger

Financial completion

ATTACHMENT NO. 6

ATTACHMENT NO. 7

DRAWING FORMAT

ATTACHMENT NO. 7

DRAWING FORMAT

1.0 Policy: Drawings shall be prepared in accordance with the applicable provisions of the “A/E/C CADD Standard, Release 2.0” except as noted herein for title block/borders, drawing size, and file naming conventions. The A/E/C CADD Standard, Release 3.0 is available for download at:

https://cadbim.usace.army.mil/default.aspx?p=s&t=13&i=4

2.0 Title and Border Sheets: Current, standard CADD title blocks and border files used by Sacramento District for contract documents can be downloaded from:

http://www.spk.usace.army.mil/organizations/cespk-ed/SPKCADD/AutoCAD/autocad.html

See the drawings at the end of this attachment to clarify who and what titles should be shown in the title blocks, including “Drawn By”, “Designed By”, “Reviewed By” and “Submitted By”. Border sheets have an instruction layer enumerates the various layers and settings required for the Proposer to set.

3.0 Drawing Size: The paper size for drawings shall be 22 inches x 34 inches and Sacramento District border sheets reflect this size. The border size provided conveniently reduces to half size 11 inches x 17 inches and will successfully plot from a standard laser printer that supports 11” x 17” paper.

4.0 File Naming Convention and Directory Structure: File names for this project shall be as indicated at the end of this paragraph, and conform to the A/E/C CADD Standard. See the CADD Directory Structure listing at the end of this paragraph for an example of the recommended organization of electronic files delivered to the Sacramento District. This is Sacramento District’s interpretation of the current A/E/C CADD Standard.

4.1 Production Drawings: Production drawings shall be stored under files names consisting of the number sequence B35 followed by a letter and hyphen (-) to indicate design discipline that produced the sheet as follows (page 13 of the A/E/C CADD Standard (Release 3.0)); Drawing organization shall conform to this order:

G General V Surveys B Geotechnical C Civil L Landscape S Structural A Architectural I Interior Design Q Equipment F Fire Protection P Plumbing M Mechanical E Electrical T Telecommunications

Sheet type shall be indicated by the following Sheet Type Designators (page 22 of the A/E/C CADD Standard (Release 3.0)):

0 General (Symbols, Legends, Notes, etc.)

1 Plans (horizontal views) 2 Elevations (vertical views) https://cadbim.usace.army.mil/default.aspx?p=s&t=13&i=4 http://www.spk.usace.army.mil/organizations/cespk-ed/SPKCADD/AutoCAD/autocad.html

3 Sections (sectional views) 4 Large Scale Views (enlarged plans, elevations, or sections that are not details) 5 Details 6 Schedules and Diagrams 7 User Defined 8 User Defined 9 3D Representations (isometrics, perspectives, photographs)

The complete drawing sheet file name will thus conform to the following:

B35 Project Code A- Discipline Designation 1 Sheet Type Designator 01 Sheet Sequence Number XXX User Definable .DWG CADD File Extension

Example: B35C-101XXX.dwg Civil Site Plan B35A-101XXX.dwg Architectural Key Plan B35A-203XXX.dwg Intermediate Architectural Elevations B35A-515XXX.dwg 15th Architectural Detail Sheet (all drawing sets must start with the number 1, i.e. 101, 201, 301, etc. Use of 00 as in 000, 100, 200, 300 is prohibited.)

B35A-602XXX.dwg Possible Door Schedule Sheet

4.2 Reference File Drawings: Reference file drawings of floor plans, elevations, sections, etc., used to generate production drawings shall be stored under file names consisting of the number sequence B35 followed by a letter to indicate design discipline that produced the sheet as indicated in Table 2-1 (page 13 of the A/E/C CADD Standard). The naming convention includes a hyphen ( - ) and a Model File Type designator (Table 2-2, page 13 of the A/E/C CADD Standard):

Model Type Designators include the following (additional designators may be found on pages 14 through 16 of the A/E/C CADD Standard.):

FP Floor Plan EL Elevation SH Schedule SC Section PR Profile LG Legend DG Diagram DT Detail 3D Isometric/3D

The complete reference file (model file) drawing name will thus conform to the following:

B35 Project Code A- or -A- Discipline Designation (note: some CADD software programs automatically place a hyphen before the discipline designator as in -A-; this is acceptable, as long as all reference files are named consistently.)

FP Sheet Type Designator XXXX User Definable

.DWG CADD File Extension

Example: B35-A-FPXXXX.dwg Architectural Reference Plan B35-A-ELXXXX.dwg Architectural Reference Elevations B35-A-SCXXXX.dwg Architectural Reference Building Sections

B35-A-SHDXXX.dwg Architectural Reference Door Schedule

Sheet B35-A-FPXXXX.dwg would be used to create the production drawing of the floor plan, Area ‘A’ named: B35A-101XXX.dwg.

5.0 Layer/Level Convention, Line Symbologies, Font Libraries and Color/Pen Tables: The Architect-Engineer shall use the AIA version of the CADD layer/level convention, line symbologies (including layer color, line weight, and line type), font libraries (restrict font usage on drawings to AutoCAD font Romans (Roman Simplex), with a 0.8 width factor and Arial Bold for title sheet fonts), and color tables as indicated in the current adopted version of the A/E/C CADD Standards manual.

6.0 Hard Copy Data to be Included: Existing hard copy data to be included in construction drawings shall be scanned to raster format (however, vectorized is preferred), and incorporated into the electronic files or may be included as references following the reference file paragraph above.

7.0 Plot Configuration Documentation: The plot configuration file for each drawing shall be provided. This ASCII text format documentation shall include the plotter configuration (e.g., name and model of plotter, pen settings, colors, widths, drawing orientation, drawing size, and other special instructions). Acceptable plot configuration or plot documentation files end in the following file extensions:

*.pcp, *.pc2, or *.pc3.

TECHNICAL SPECIFICATIONS

VA - Grand Junction 3rd Floor Add. to Surgery Center 1678

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 00 00

GENERAL REQUIREMENTS

PART 1 GENERAL

1.1 SCRAP MATERIAL

1.2 WRITTEN GUARANTEES AND GUARANTOR'S LOCAL REPRESENTATIVE

1.3 PRICING OF CONTRACTOR FURNISHED PROPERTY

1.4 TEMPORARY ELECTRIC WIRING

1.4.1 Temporary Power and Lighting

1.4.2 Construction Equipment

1.4.3 Circuit Protection

1.5 UTILITIES NOT SHOWN

1.6 GENERAL SAFETY REQUIREMENTS

1.6.1 General

1.6.2 The Prime Contractor's Superintendent

1.6.3 Job Hazard Analysis

1.6.4 Violations

1.6.5 Elevated Work Areas

1.6.6 Fire Prevention

1.6.7 Record Keeping/Reporting Requirements

1.6.8 Accident Reporting

1.6.9 Monthly Safety Inspections

1.7 PLANNED UTILITY OUTAGES AND STREET CLOSURES

1.8 EXCAVATION PERMITS

1.9 TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER

1.10 EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE

1.11 EQUIPMENT DATA FORM

1.12 SPECIAL CONSTRUCTION REQUIREMENTS

1.12.1 Contractor Badges

1.12.2 Construction Security Requirements

1.12.3 Construction Restraints

1.12.4 Operations and Storage Areas

1.12.5 Alterations

1.12.6 Infection Prevention Measures

1.12.7 Disposal, Retention and Recycling

1.12.8 Protection of Existing Vegetation, Structures, Equipemnt, Utilities and Improvements

1.12.9 Restoration

1.12.10 Physical Data

1.12.11 Temporary Use of Mechanical and Electrical Equipment

1.12.12 Temporary Use of Existing Elevators

1.12.13 Occupied and Existing Buildings

1.12.14 Night Work

1.12.15 Safety Plan

1.13 LABOR RATES

1.14 WEEKLY COORDINATION MEETING

1.15 RED ZONE MEETING

1.16 MAJOR PHASE AND FINAL PROJECT COMPLETION

1.17 AFTER AWARD DOCUMENTS

1.18 MONTHLY SAFETY INSPECTION

PART 2 PRODUCTS (NOT USED)

SECTION TABLE OF CONTENTS 01 00 00 Page 1

VA - Grand Junction 3rd Floor Add. to Surgery Center 1678

PART 3 EXECUTION (NOT USED)

-- End of Section Table of Contents --

SECTION TABLE OF CONTENTS 01 00 00 Page 2

3rd Floor Addition for Surgery Center, PACU, SPD & ICU 01 10 00 -1 VA Medical Center; Grand Junction, CO

SECTION 01 10 00

SUMMARY OF WORK

FOR

3rd Floor Addition for Surgery Center, PACU, SPD, & ICU, Grand Junction, CO

RTA DOCUMENTS SUBMITTAL

3rd Floor Addition for Surgery Center, PACU, SPD & ICU 01 10 00 -2

SECTION ORGANIZATION:

This Division 01 is organized under four main sections that include the following information:

• Section 01 10 00 – Summary of Work. Includes a brief project description and the distinction between Base Bid and Additive Options in the bid documents.

• Section 01 10 10 – Specific Technical Engineering & Design Criteria. This section describes the technical requirements of the project. It also includes other supporting information that the Contractor must refer to when developing its bid and design documents.

• Section 01 10 11 – Functional Design Criteria. This section summarizes the technical requirements of the project including a room by room summary of the specific elements included in the contract.

• Section 01 10 12 – Design After Award. This section describes the tasks and deliverables that the Contractor is responsible for during the design phase.

SUMMARY OF WORK:

The contractor shall provide all labor, materials, tools and equipment and Design-Build services necessary for construction of this project titled 3rd Floor Addition for Surgery Center, PACU, SPD & ICU, Grand Junction, CO”. The new addition will be constructed on top of the existing 2-story surgery wing which is located between Building 1 and North Avenue. The approximately 41,100 SF 3rd floor addition and renovations will accommodate a Surgery Center, a Post Anesthesia Care Unit (PACU), a Supply Processing and Distribution unit (SPD), and an Intensive Care Unit (ICU). The project also includes floor plan development to upgrade the elevator lobby and nurse’s station and other improvements on the existing Building 1 “T” section of the 3rd Floor including a connection corridor between the new addition and Building 1.

BASE BID PRICING SCHEDULE:

Construct Area I and II Enclosure – Operating Rooms and SPD Rooms and supporting spaces:

Contractor shall construct the entire area described by the plan in Section 01 10 10, Appendix O.

Construction shall also include the enclosure (structural framing, perimeter walls, roof deck, floor slab fire protection and alarm) comprising the building surrounding Areas III and IV. Plan continuation into future Lobby 3004 of Building 1, Nurse Break 3046 and Ward Nurse Station 3022, doorway to corridor 3006 and elevator lobby upgrades are also included in base bid. Also, a late change not shown on the drawings is continuation of one (1) passenger elevator from the second to the new third floor addition. This addition will require the Contractor to work with the VA during the Charrette meetings to redesign cooridor 3006 and the east side of the I.C.U. area.

ADDITIVE OPTIONS PRICING SCHEDULE:

• Option #1: Construct Area III – ICU Rooms and adjoining spaces. Contractor shall construct the entire area described by the plan in Section 01 10 10, Appendix O. Construction shall include the interior build-out not included in the Base Bid.

• Option #2: Construct Area IV – PACU Rooms and adjoining spaces. Contractor shall construct the entire area described by the plan in Section 01 10 10, Appendix O. Construction shall include the interior build-out not included in the Base Bid.

--End of Section--

3rd Floor Addition for Surgery Center, PACU, SPD & ICU 01 10 10 -1

SECTION 01 10 10

SPECIFIC TECHNICAL ENGINEERING

AND DESIGN CRITERIA

3rd Floor Addition for Surgery Center, PACU, SPD & ICU 01 10 10 -2

1. SCOPE:

1.1 Design and construct the 3rd Floor Addition for Surgery Center, PACU, SPD & ICU, Grand Junction, CO. The new addition will be constructed on top of the existing 2-story surgery wing which is located between Building 1 and North Avenue in accordance with the criteria contained herein and using industry standard materials and efficient practices. The objective of this contract is to design and construct the required facility as described in this document and Section 01 10 11, Functional Design Criteria, and to meet the operational requirements of the VA. The Contractor shall provide all labor, equipment and material to perform the design and construct the complete, operational facility. The Contractor is encouraged to attend the proposal conference.

1.2 The Contractor shall be responsible for the professional quality, technical accuracy and coordination of all designs, drawings, specifications and other documents or publications upon which construction is based. The design of architectural, interior design, structural, mechanical, electrical, civil and other engineering features of the work shall be accomplished, reviewed and approved by engineers, architects and interior designers who are licensed professionals with a minimum of six years experience to practice in their respective professional field in a state or possession of the United States. The structural interior design shall be designed/supervised by a registered or certified (as Appropriate for the state) interior designer who is NCIDQ certified.

1.3 The design and construction of this facility shall conform to the VA Design Standards and the requirements issued in this solicitation. The Contractor is responsible and liable for the complete design and shall not assume that the provided design criteria and drawings in this solicitation will alleviate him from performing any additional design as required to produce a complete set of construction documents.

1.4 The attached drawings indicate the siting location of the addition and its approximate maximum size, areas of the existing facility to be remodeled and renovated, and other system parameters that have been developed to date and approved by the VA and USACE. These shall be used to develop a full set of construction documents.

1.5 As built drawings of the existing medical clinic can be made available to the Contractor after project award.

2. SUMMARY DESCRIPTIONS:

2.1 This project shall construct a new addition on top of the existing 2-story surgery wing which is located between Building 1 and North Avenue. The approximately 41,100 SF 3rd floor addition will accommodate a Surgery Center, a Post Anesthesia Care Unit (PACU), a Supply Processing and Distribution unit (SPD), and an Intensive Care Unit (ICU). The project also includes floor plan development to provide in-patient beds and nurse’s station and other improvements on the existing Building 1 “T” section of the 3rd Floor including a connection corridor between the new addition and Building 1. The project shall be designed within the criteria prescribed by http://cbbs.spk.usace.army.mil/ae.html and http://www.va.gov/facmgt/, and the Uniform Accessibility Standards/ Americans with Disabilities Accessibility guidelines. See Appendix S for a complete list of applicable codes and criteria.

2.2 Contractor Staging Summary. The addition is located above and adjacent to existing medical facilities and functions that will remain in operation during construction. The contractor must construct the addition/renovation in such a manner that impacts and disruptions to medical functions are kept to a minimum. The available locations on the site for the contractor to set-up trailers, employee parking, storage and staging is shown on Drawing G-001.

3rd Floor Addition for Surgery Center, PACU, SPD & ICU 01 10 10 -3

2.2.1 The project site is located at 2121 North Avenue, Grand Junction, Colorado.

2.3 Building Construction Summary. The addition will be new construction. Renovation work to the existing building will be as identified on the drawings and in Division 01 Specifications. Construction phasing of the project shall be as indicated on the drawings.

2.4 Appendices. Additional relevant information is contained in the following appendices which are located at the bottom of this Section 010 10 10:

APPENDIX CONTENT

A Drawing List B Code Summary C Electrical Service Test Results D Electrical 1-Line Diagram E Fire Flow Test Results F Geotechnical Report G Hazardous Materials Report H LEED Credits Checklist I Potential Plan Changes J Medical Equipment Plan & List K Room List - Surgery Addition L Site Utilities Plan M Utility Service Providers and Rates N Drawings (fold out version; full size bound separately) O Base Bid and Additive Options Plan P Domestic Water Quality Data Q OR HVAC Criteria R Boiler and Chiller Plant Utility Usage Chart S Applicable Codes and Design Criteria

3rd Floor Addition for Surgery Center, PACU, SPD & ICU 01 10 10 -4

3. DESCRIPTION OF OPERATIONS:

The VA Medical Center personnel provide a full range of medical care and treatment to retired military and civilian employees and their dependents. The 3rd story addition is to be constructed over the existing 2-story structure that was built in the 1980s and opened for use in 1986. Building 1, constructed in 1948, is a 7-story 171,220 square foot reinforced concrete structure. The 3rd Floor of Building 1, which is included in this project, is currently vacant but the status at construction start must be verified by the contractor.

4. DESIGN SUBMITTAL REQUIREMENTS:

The design requirements within this section and the following Section 01 10 11 represent the minimum quality and quantity acceptable for the proposals and project submittals. The standards, documents, and criteria referenced within this RFP, although not all attached within this RFP document, are modified to the extent indicated within this section. Each Offeror shall be responsible for obtaining any documents not attached as part of this RFP but referenced as criteria for the project. Requirements of this section may delete, revise, add to, or substitute for criteria contained in the referenced documents and this section shall be deemed the controlling authority of any changes to the other referenced documents and criteria.

4.1 Design Standards. Equipment, hardware, and materials shall be standard manufactured domestic items unless otherwise specified. Replacement parts shall be standard and readily available through commercial means. Discontinued products will not be accepted unless approved by the Contracting Officer.

4.2 Codes. The design, materials, equipment, and installation shall be in accordance with the requirements of the listed codes and design manuals, with the requirements of this section, and with the listed specifications. The building shall be of a noncombustible construction classification. Wood structural elements will not be acceptable.

4.3 English Design. This project shall be designed in English inch-pound (I-P) units due to requirements to remodel and renovate within the English-unit-designed existing building.

4.4 Drawings. Attached drawings provide information on the site and general building layout for phasing and shall be considered in the design of the facility. The RFP drawings represent a design solution that has been accepted by USACE and VA Medical Center leadership. However, the RFP drawings and approved solution are subject to change based on VA Medical Center functions at the time of contract award and Design-Build design and consequently, they may not be the actual design solution that will be provided by the Contractor. Refer to Section 01 10 12 for additional specifications related to this subject.

4.4.1 Field Information. The utility and as-built information provided in the drawings is the best information available. It is provided to assist the offerors in preparing their proposal and then during the design of this project. The Contractor is responsible for field verifying all information given. The Contractor is also responsible for obtaining all information necessary to properly design and install all work. Gathering information during design shall be coordinated through the Contracting Officer. Any survey required to provide utility locations, manhole inverts, verification of existing features, etc. shall be the responsibility of the Contractor and shall tie into the project datum.

4.4.2 Design Details and Standards. The Contractor shall create design details as required, but shall conform to the requirements of the RFP, and are subject to approval by the Government.

3rd Floor Addition for Surgery Center, PACU, SPD & ICU 01 10 10 -5

4.5 Specifications. This RFP has provided a specification outline that shall serve as a guide for the offers to use to develop the final design specification documents. Guide specifications are available for review and reference at http://www.va.gov/facmgt/. The contractor shall provide all relevant specifications fully edited to meet the final design and construction. Unless noted otherwise, material specifications, equipment efficiencies, equipment listing (i.e., UL, ANSI, NEMA, etc,), testing requirements, execution, etc., shall not be changed unless dictated by more stringent requirements in this RFP, including technical criteria such as codes and government and industry publications that are referenced in this RFP.

4.6 Sustainable Design. The Contractor is encouraged to design the project to meet US Green Building Council (USGBC) certification at the “Silver” rating level of Leadership in Energy and Environmental Design-New Construction (LEED®-NC). LEED®-NC is a commercial Green Building Rating Tool developed by USGBC, http://www.usgbc.org /, and is widely used throughout the country.

Sustainable design goals should be considered as they relate to building design and engineering.

Contractor shall comply with LEED-NC Indoor Environmental Quality Credits requirements 4.1 through

4.4 for low emitting materials. Formal LEED certification is not required; however, if any documentation is provided during design, it should follow USGBC requirements.

4.7 Force Protection. Not Applicable.

4.8 Barrier Free Design. This facility shall be fully accessible to all handicapped individuals in accordance with the requirements of the Americans with Disabilities Act and the Uniform Federal Accessibility Standards. Exposed plumbing pipes under toilet lavatories shall be fully screened both physically and visually. Transition between the new addition and the existing Building 1 shall comply with ADA and UFAS standards.

5. CIVIL DESIGN:

5.1 General. The project consists of design and construction for an addition above an existing structure and no civil improvements or upgrades are involved with the exception being repair and replacement of any damaged landscaping, irrigation, paving or walkways that may have occurred during construction. The contractor is responsible for making any such repairs to the satisfaction of the VA and USACE contracting Officer.

5.1.1 Waste Disposal. Project demolition and construction waste shall be disposed of off-site at a location approved by the Contracting Officer.

5.1.2 Haul Route. VA roadways sustaining damage shall be maintained and kept clean at the Contractor’s expense. The NW gate and driveway accessing off North Avenue will be the entry and exit point for haul vehicles. The gate operation hours are 0700 - 1800 from Monday thru Friday.

5.2 Permits.

NPDES Storm Water General Permit. Construction will not likely result in disturbance of more than one

(1) acre of total land area therefore this is Not Applicable.

5.2.1 Dust Permit. N/A

5.2.2 Digging Permit. N/A

5.3 Grading. N/A

5.3.1 Finished Floor. Match 3rd Floor level of Building 1.

3rd Floor Addition for Surgery Center, PACU, SPD & ICU 01 10 10 -6

5.3.2 Site Drainage Concept. N/A

5.3.2.1 Building Site. N/A

5.3.2.2 Parking Area. N/A

5.4 Earthwork. N/A

5.5 Site Improvements.

5.5.1 Contractor Storage Yard. The Contractor storage yard and trailer location shall be located within the Staging Area as shown on Drawing G-001.

5.6 Storm Runoff and Drainage. Applies only to repair of areas around the building needing to be brought back to pre-construction status.

5.13.1 Storm Runoff. N/A

5.13.2 Existing/New Storm Drainage System. N/A

5.13.3 Roof Drainage. The Contractor shall connect roof drains on top of the addition to internal drains running through the 2nd and 1st floors.

5.13.4 Storm Drain Line Materials. N/A

5.13.5 Drainage Swales. N/A

5.7 Utilities.

5.7.1 Utility Connections. All utility connections shall occur inside the building.

5.7.2 Existing Utilities. Existing utilities are shown in Appendix L.

5.7.3 Water. Interruption of potable water service to facilities, during construction, shall be minimized and restricted to the hours determined by the Contracting Officer. Final domestic water hook-up to the potable system (site and all buildings) shall be disinfected. All piping, joints, fittings, valves, valve boxes, fire hydrants, backflow prevention devices, and thrust restraint shall comply with the National Fire Code.

5.7.3.1.1 Domestic Water Service. Refer to Design Narrative, paragraph 4.0.

5.7.3.2 Fire Protection Water Service. Refer to Design Narrative, paragraph 6.0.

5.7.3.2.1 Fire Hydrants. No new fire hydrants are included in this RFP.

5.7.3.2.2 Fire Flows. Recent water and fire flow reports have been included in Appendix E of this section. Contact the Grand Junction VAMC Engineering Department for updates if applicable.

5.7.3.3 Valves and Valve Boxes. Refer to Design Narrative, paragraph 6.0.

5.7.3.4 Burial Depth. N/A

5.7.3.5 Existing Water System Pressures. Refer to Design Narrative, paragraph 4.0.

3rd Floor Addition for Surgery Center, PACU, SPD & ICU 01 10 10 -7

5.7.3.6 Post Indicator Valves. Refer to Design Narrative, paragraph 6.0

5.7.3.7 Backflow Preventer. Refer to Design Narrative, paragraph 6.0.

5.7.3.8 Water Line Materials. Refer to VA Technical Specifications.

5.7.4 Sanitary Sewer. Sanitary sewer shall be connected to the existing system. Refer to Refer to Design Narrative, paragraph 6.0 for additional information.

5.7.4.1 Burial Depth. N/A

5.7.4.2 Cleanouts. Refer to VA Technical Specifications.

5.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .