Specification 35 20 23 - 1.10.1 Geotechnical Information
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Figure 1-1. Dredging Area and Sampling Locations for the Langley-DLA Fuel Pier Replacement Project.
Northing Easting
Reference Sites
WBREF 3529595.85 12144144.65 24 Surface Grab -- -- 10/22/2013 1200 -- --
Control Site
CBCON 3624577.47 12183065.81 54 Surface Grab -- -- 10/22/2013 930 -- --
Norfolk Ocean Disposal Site
NODS 3529682.11 12314946.80 70 Water Sample -- -- 10/21/2013 1347 -- --
Langley-DLA Fuel Pier Locations
1 10/19/2013 1050 10 10
2 10/19/2013 1059 9.8 9.8
3 10/19/2013 1107 8.5 8.5
4 10/19/2013 1112 7.4 7.4
5 10/19/2013 1118 8.6 8.6
6 10/19/2013 1125 9.4 9.4
7 10/19/2013 1135 8.3 8.3
1 10/19/2013 900 7.1 Did not keep; opened onboard for observation
2 10/19/2013 924 10.1 9.1
3 10/19/2013 934 10.1 9.1
4 10/19/2013 949 9.6 8.6
5 10/19/2013 954 8.1 7.1
6 10/19/2013 1000 7.5 6.5
7 10/19/2013 1005 8.8 7.8
8 10/19/2013 1015 7.0 6
1 10/19/2013 1412 8.0 6
2 10/19/2013 1421 7.0 6
3 10/19/2013 1428 6.2 6
4 10/19/2013 1433 7.7 6
5 10/19/2013 1439 6.0 6
6 10/19/2013 1445 7.1 6
7 10/19/2013 1454 7.1 6
1 10/19/2013 1252 8.1 6.1
2 10/19/2013 1258 7.0 5
3 10/19/2013 1306 5.3 Did not keep; poor recovery
4 10/19/2013 1310 7.8 6
5 10/19/2013 1318 7.4 6
6 10/19/2013 1325 8.7 6
7 10/19/2013 1330 8.8 6
8 10/19/2013 1337 8.1 6
9 10/19/2013 1345 7.0 6
7 5.5
LANG-04 3562070.71 12113989.88 8.8 8 6
LANG-03 3562304.93 12113641.61 9.3
Date
LANG-02
3561866.02 12113385.67 4.6
3561973.19 12113409.75 5.1
TABLE 2-1. SAMPLING LOCATION COORDINATES AND SEDIMENT RECOVERY INFORMATION FOR VIBRACORING AND REFERENCE SAMPLING
LOCATIONS
Sediment Core Recovery Length (ft)
7 10
LANGLEY-DLA FUEL PIER REPLACEMENT PROJECT, BACK RIVER, VIRGINIA
LANG-01 7 10.5
Time Sediment Sample
Recovery Length (ft)Virginia South State Plane, NAD83 feet Location ID
Actual Water Depth (ft)
Number of Cores Collected
Target Core Length (ft)
Core Number
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
% CLAY % SILT % SAND % GRAVEL
Figure 4-1. Grain size distribution in sediment samples from the Langley-DLA Fuel Pier Replacement and the Willoughby Bank Reference Site.
TABLE 4-6. PHYSICAL CHARACTERISTICS OF SEDIMENT
LANGLEY-DLA FUEL PIER REPLACEMENT PROJECT, BACK RIVER, VIRGINIA
Analyte Unit Average
RL
Willoughby Bank
Reference Site
LANG-01
LANG-01
Field Duplicate
LANG-02 LANG-01/02 LANG-03 LANG-04 LANG-03/04
GRAVEL % -- 2.3 4.8 0 0 0 0 0 4.7
SAND % -- 74.3 5.9 4.3 12.4 11.2 3.1 7.1 7.9
Coarse Sand % -- 0.8 0.5 0 0 0 0 0 0.3
Medium Sand % -- 3 0.3 0.5 1.8 0.1 0.3 0.3 0.2
Fine Sand % -- 70.5 5.1 3.8 10.6 11.1 2.8 6.8 7.4
SILT % -- 18.9 55.7 55.1 49.3 52.5 68 51 52
CLAY % -- 4.5 33.6 40.6 38.3 36.3 28.9 41.9 35.4
SILT+CLAY % -- 23.4 89.3 95.7 87.6 88.8 96.9 92.9 87.4
SPECIFIC GRAVITY -- -- 2.68 2.74 2.73 2.74 2.71 2.68 2.71 2.71
PERCENT MOISTURE % 0.1 30.3 43.8 42.5 37.6 42.4 54.6 48.8 51.6
NOTES: Bold values represent detected concentrations.