AMENDMENT_0001_-_Back_River_Dredging.pdf
PDF 93 KB Posted
- Attached to
- Langley Air Force Base/Back River Maintenance Dredging Federal contract opportunity
- Solicitation number
- W91236-18-B-0028
About this file
Amendment 0001 - W91236-18-B-0028
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Back_River_-_Abstract-KOSigned_17Sep18.pdf | ||
| Amendment_0003_-_Back_Fiver_Dredging.pdf | ||
| Amendment_0002_-_Back_River_Dredging.pdf | ||
| NAO-2017-01821_IP_Army_Permit___8-28-18.pdf | ||
| Attachment_6_-_Back_River_-_XYZ_and_Metafile.zip | ZIP file | |
| Attachment_4_-_Back_River_-_Spec_35_20_23_-_1.10.1_Geotechnical_Information__8-28-18.pdf | ||
| Attachment_5_-_Back_River_-_REVISED_Drawing_4_Height_Limits__8-28-18.pdf | ||
| Langley-Back_River_Maintenance_Dredging_-_SIGNED_Bid_Drawings_dtd_08-14-18.pdf | ||
| Solicitation_W91236-18-B-0028_-_Langley_Back_River_Dredge.pdf | ||
| Wage_Determination_VA180001.pdf | ||
| Langley-Back_River_Maintenance_Dredging_-_BID_set_of_SPECIFICATIONS__dtd_08-08-18.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
1. Respond to bidder inquires. See continuation page for more details.
2. Amend specif ications and revise draw ings as described in the attached summary of changes.
All Other Terms and Conditions Remain Unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9123618B0028
X 9B. DATED (SEE ITEM 11)
15-Aug-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
28-Aug-2018
CODE
USA ENGINEER DISTRICT, NORFOLK
803 FRONT STREET
NORFOLK VA 23510-1096
W91236 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9123618B0028
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 01 10 - TABLE OF CONTENTS
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 4 Revised Specifications 4 28-AUG-2018 Attachment 5 Revised Drawings 1 28-AUG-2018 Attachment 6 XYZ and Metafile
A. ProjNet Bidder Inquiries for Solicitation:
1. Bidder Inquiry ID: 7621954 – Specification 35 20 23: Dredging QUESTION: Section 35 20 23, page 18, paragraph 3.7.3 states "In computing the limiting amount of side-slope dredging an overdepth of one foot measured vertically will be used." However, the cross-section depicted on drawing sheet 5 shows two feet of allowable overdepth on the side slopes. Please clarify the side-slope overdepth discrepancy.
GOVERNMENT RESPONSE: The two feet of overdepth shown in the drawings is correct. The specifications shall be revised by amendment to this solicitation to read "an overdepth as shown in the drawings" instead of "an overdepth of one foot" (Spec 35 20 23 – 3.7.3)
2. Bidder Inquiry ID: 7623968 – Contracting: Solicitation
QUESTION: After reviewing the plans and specs for the upcoming Langley River Dredge Project I am curious to know if there will be a site visit taking place before the bid. I would also like to request the XYZ file from the bathymetric survey, so that we might better understand the over dredge situation.
GOVERNMENT RESPONSE: 1. As noted in the solicitation, no formal site visit is scheduled in support of this solicitation. Potential bidders are welcome to visit the Langley/Back River area at your convenience. To visit the Langley Fuel Pier area at the west end of the channel, you will need to coordinate your visit with Langley AFB.
Please contact Paul Burgener at paul.burgener@us.af.mil or by telephone (757) 225-9565; and 2. The XYZ channel survey data file and associated Metafile will be included by amendment to this solicitation. (Spec 35 20 23 – 1.13)
3. Bidder Inquiry ID: 7631089 - Specification 35 20 23: Dredging QUESTION: In 35 20 23 1.15, it states Contractor to expect periodic delays and interruptions of operations from channel traffic. With what frequency and duration are impacts from channel traffic to be anticipated?
GOVERNMENT RESPONSE: Expected channel traffic includes fuel barges traveling to and from the Langley AFB Fuel Pier at the west end of the channel in addition to standard commercial and private vessels. As fuel barge transit schedules are subject to change, please contact the fuel barge company directly for schedules and frequency.
(Spec 35 20 23 - 1.15)
4. Bidder Inquiry ID: 7631094 - Geotechnical
QUESTION: Please provide geotechnical data/borings or material characterization for the material to be dredged in Option 1.
GOVERNMENT RESPONSE: Geotechnical information or material characterization associated with optional work near the Fuel Pier will be included by amendment to this solicitation. (Spec 35 20 23 – 1.10.1) mailto:paul.burgener@us.af.mil
W9123618B0028
B. AMENDMENTS TO SPECIFICATIONS
1. SPECIFICATION 35 20 23 – DREDGING
Revise specification Paragraph 3.7.3 – Side Slopes, the last sentence: (DELETE) "an overdepth of one foot" and (ADD) "an overdepth as shown in the drawings"
2. SPECIFICATION 35 20 23 – DREDGING
Revise specification Paragraph 1.13 Condition of Dredging Areas, after the last sentence: (ADD) the XYZ channel survey data file and associated Metafile will be included in Amendment 0001 to this solicitation.
3. SPECIFICATION 35 20 23 – DREDGING
Revise specification Paragraph 1.15 – Channel Traffic, after the last sentence: (ADD) Expected channel traffic includes fuel barges traveling to and from the Langley AFB Fuel Pier at the west end of the channel in addition to standard commercial and private vessels. As fuel barge transit schedules are subject to change, please contact the fuel barge company directly for schedules and frequency.
4. SPECIFICATION 35 20 23 – DREDGING
Revise specification Paragraph 1.10.1 – Physical Conditions Information, after the last sentence: (ADD) Geotechnical information or material characterization associated with optional work near the Fuel Pier is included in Amendment #1 to this solicitation.
5. SPECIFICATION 35 20 23 – DREDGING
Revise specification Paragraph 3.2.1 – Joint Base Dredging Requirement, after the last sentence: (ADD) As the ends of the Langley AFB runways are located near the Fuel Pier at the west end of the channel, there is a dredge height limitation during flight hours (07:00 AM to 10:00 PM). If the dredge is equal to or greater than 70 feet in height, all dredging must occur during the non-flight night hours from 10:01 PM to 06:59 AM for work between Station 9+48.2 and Station 44+99.7. There are no height limitations applicable to all other channel areas. If the dredge is less than 70 feet in height, there are no height limitations for the entire channel. If the scows and barges and associated equipment are less than 70 feet tall, there are height limitations for the entire channel – otherwise the same time limits apply.
C. REVISIONS TO THE DRAWINGS
Drawing Sheet #4 – Detail Map of Dredging Areas The drawing has been revised to indicate that the area between Station 9+48.2 and 44+99.7 has a dredge height limitation of 70 feet during flight hours of 07:00 AM to 10:00 PM. If the dredge height is equal to or greater than 70 feet, they are only permitted to work during the night non-flight hours of 10:01 PM and 06:59 AM. This height limitation also applies to scows and barges and associated equipment.
(End of Summary of Changes)