AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
W91236-17-B-0005 Chesapeake Bay Oyster Restoration Project at Piankatank River is hereby Amended as follow s:
Please see continuation page for list of Bidder Inquiries submitted via ProjNet, and corresponding Government responses, w hich are hereby applicable to this Solicitation and subsequent Contract.
Please note that the Bid Opening date has NOT changed. Please acknow ledge all amendments in your proposal.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W91236-17-B-0005
X 9B. DATED (SEE ITEM 11)
12-Jan-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
U0002
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
07-Feb-2017
CODE
USA ENGINEER DISTRICT, NORFOLK
803 FRONT STREET
NORFOLK VA 23510-1096
W91236 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W91236-17-B-0005
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SECTION 00 11 00 - SF 1442 AND CLIN SCHEDULE
SUMMARY OF CHANGES
SECTION 00 21 00 - INSTRUCTIONS, CONDITIONS & NOTICES TO OFFERORS
The following have been added by full text:
BIDDER INQUIRIES
BIDDER INQUIRIES & ANSWERS SUBMITTED VIA ProjNet
Bidder Inquiry 6803329: Paragraph 1.4.6-Work Area Access- Are there any known private reefs or grounds leases/owners adjacent to or in the immediate vicinity of the project
GOVERNMENT RESPONSE
There are private ground leases/owners in the vicinity. The known reef locations have been added to the plan drawings, but the contractor is advised to contact VMRC for the latest info.
Bidder Inquiry 6803338: Measurement and Payment-Stone material will not be delivered by truck but by barge. We assume that standard barge displacement / tonnage calculations on a Bill of Lading from the quarry is satisfactory
GOVERNMENT RESPONSE
Yes, standard barge displacement / tonnage calculations on a Bill of Lading form the quarry is acceptable.
Bidder Inquiry 6803347: Paragraph 3.1.3-Protection - If damage to constructed areas is not the fault of the contractor (storm damage for example) will contractor be compensated for repair?
We do not know the answer to this.
GOVERNMENT RESPONSE
We have revised this language. The Government's intention with this language is that the contractor be responsible for damage to constructed habitat resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work.
Bidder Inquiry 6803354 General Drawing HH-104: Note 6 states that stone thickness is to be greater than 12" but not to exceed 18". The cubic yard calculations in the Table for Stone Quantity is based on 1 foot thickness. Is the constructed stone thickness to be a uniform 1 foot thick subject to the vertical tolerances noted in the specifications?
GOVERNMENT RESPONSE
Yes. Class A1 is 12 to 18 inches in diameter. However stone size may be slightly larger or smaller (in inches). There will be one layer of stone.
Bidder Inquiry 6803359 General Sheets HH-202 & 203: These drawings do not correspond to the noted scale on the sheet
HH-202 will be revised to remove the scale. The scale on HH-203 is correct.
Bidder Inquiry 6803411 General Drawing Sheet HH-204: The Construction Detail indicates vertical walls on the constructed reef segments. There will be some sloping of the material as it is placed making the bottom width wider than the top. Is the reef to be constructed with a maximum width of 30' on the bottom or 30' on the top & a little wider on the bottom.
Class A1 is 12 to 18 inches in diameter. There will be one layer of stone.
Bidder Inquiry 6803437 General N/A: Based on information provided, the TIME OF YEAR restriction for construction is June 15 thru February 15 each year. It is also noted that the annual oyster spat set further restricts construction by stating no construction later than September 30 each year. Does the oyster spat set restriction apply for this project?
GOVERNMENT RESPONSE
There are no longer any biological time of year restrictions on this project for the protection of endangered species. They were removed through coordination with the Virginia Department of Environmental Quality and the Virginia Department of Game and Inland Fisheries after completion of the Biological Assessment. The Biological Assessment in the specs has been updated to remove these references and a memorandum supporting the removal of all time of year restrictions has been added to the specs. However, the terms of this solicitation require that all work be completed by 31 July 2017.
Bidder Inquiry 6803471 Other 5, 6 and 11 Solicitation Page 5 - CLIN 0004 stone quantity placement quantity is noted as 22,500 but should be 20,000 Page 6 CLIN 0006 & 0007 - The items which are excluded from the cost of these CLIN are misstated Page 11, Paragraph 3 - Notes contract duration of 120 days. Will time be added if options are awarded?
GOVERNMENT RESPONSE
CLIN 0004 will be revised to 20,500.
CLIN 0006 will be revised to “exclusive of items 0001 thru 0005 and 0007 thru 0010.”
CLIN 0007 will be revised to “exclusive of items 0001 thru 0006 and 0008 thru 0010.”
The contract duration of 120 days includes the base and any/all options that are awarded.
Bidder Inquiry 6814161 Survey 01 14 00: Spec Section 01 14 00, paragraph 1.5.5 states, "At least one (1) check survey as specified below shall be made for every 100 feet of stone placed.
Approval of stone placement based upon check surveys shall not constitute final acceptance of the work." Question: What will constitute final acceptance of the work and what frequency of interim surveys will be accepted to constitute final acceptance (in that particular area of the interim survey)?
GOVERNMENT RESPONSE
Although we do not anticipate acceptance of the work until the project in its entirety is successfully constructed, this is a question that can be discussed between the awarded contractor and the government.
Bidder Inquiry 6815071 Other HH-104 note Section 35 20 10:
Page 10 of the Project Description states "The material shall be placed using a hydraulic excavator...
Drawing HH-104 Note 7 states "... with an excavator or clam-shell bucket..."
Section 35 20 10 Reef Habitat Construction Section 2.1 Plant Does not specify a hydraulic excavator.
Is placement limited to a hydraulic excavator is clam-shell bucket placement by crane barge an acceptable plant?
Placement by either hydraulic excavator, clam-shell bucket or orange peel is acceptable.
SECTION 00 73 10 - SUPPLEMENTAL CONTRACT REQUIREMENTS
CLIN 0004
The CLIN extended description has changed from All effort associated with the placement of 22,500 tons of stone and construction of Reef 2 to include required signage, surveys, and any other activities incidental to placement of stone as indicated in the specification exclusive of items 0001 thru 0003 and 0005 thru 0010. to All effort associated with the placement of 20,500 tons of stone and construction of Reef 2 to include required signage, surveys, and any other activities incidental to placement of stone as indicated in the specification exclusive of items 0001 thru 0003 and 0005 thru 0010..
CLIN 0006
The CLIN extended description has changed from Load and Transport VDOT Class A1 Stone to Reef 2 (including all plant, methods, and labor), complete as indicated and specified, exclusive of items 0001 thru 0002 and 0004 thru 0010. to Load and Transport VDOT Class A1 Stone to Reef 2 (including all plant, methods, and labor), complete as indicated and specified, exclusive of items 0001 thru 0005 and 0007 thru 0010..
CLIN 0007
The CLIN extended description has changed from All effort associated with the placement of 5,100 tons of stone and construction of Reef 2 to include inrequired signage, surveys, and any other activities incidental to placement of stone as indicated in the specification, exclusive of items 0001 thru 0003 and 0005 thru 0010. to All effort associated with the placement of 5,100 tons of stone and construction of Reef 2 to include inrequired signage, surveys, and any other activities incidental to placement of stone as indicated in the specification, exclusive of items 0001 thru 0006 and 0008 thru 0010..
(End of Summary of Changes)