W911XK-15-B-0007-0002.pdf
PDF 184 KB Posted
- Solicitation number
- W911XK-15-B-0007
About this file
AMENDMENT 0002
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W56MES43211446
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
FY15 Duluth Facility Energy Optimization
This amendment is issued to amend paragraph 3.1.1 of the Specifications as detailed on the following pages. Delete Wage Determination MN-75 and replace w ith MN-41. Add Appendix A - Ceiling Materials Impacted by Interior lighting Replacement to FBO.gov. .
The required response date/time and all other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 13
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 04-Jun-2015
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911XK-15-B-0007
X 9B. DATED (SEE ITEM 11)
14-May-2015
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
04-Jun-2015
CODE
CONTRACTING BRANCH
USACE DETROIT DISTRICT
477 MICHIGAN AVENUE, 7TH FLOOR
DETROIT MI 48226-4523
W911XK 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W911XK-15-B-0007
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0002
CHANGES TO SOLICITATION
DELETE Paragraph 3.1.1
ADD Paragraph 3.1.1:
Method of Installation: Install in accordance with the window manufacturer's printed instructions and details. Build in windows as the work progresses or install without forcing into prepared window openings. Set windows at proper elevation, location, and reveal; plumb, square, level, and in alignment; and brace, strut, and stay properly to prevent distortion and misalignment. Protect ventilators and operating parts against accumulation of dirt and building materials by keeping ventilators tightly closed and locked to frame. Bed screws or bolts in sill members, joints at mullions, contacts of windows with sills, built-in fins, and subframes in mastic sealant of a type recommended by the window manufacturer. Install and caulk windows in a manner that will prevent entrance of water and wind.
Fasten insect screens securely in place. The contractor shall patch, texture, paint all surfaces affected by the scope of this project, painting all surfaces corner to corner, not just patched areas. For plastered surfaces, alternate methods of patching other than plaster are allowed.
ADD: Appendix A - Ceiling Materials Impacted by Interior lighting Replacement
SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS
The following have been modified:
WAGE DETERMINATION
General Decision Number: MN150041 05/29/2015 MN41
Superseded General Decision Number: MN20140041
State: Minnesota
Construction Type: Building
County: St Louis County in Minnesota.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Note: Executive Order (EO) 13658 establishes an hourly minimum wage of $10.10 for 2015 that applies to all contracts subject to the Davis-Bacon Act for which the solicitation is issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.10 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/02/2015 1 05/22/2015 2 05/29/2015
ASBE0049-007 06/01/2014
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR (Includes the application of all insulating materials, protective coverings, coatings & finishes to all types of mechanical systems)..............$ 26.82 23.80
BOIL0647‐007 01/01/2013
Rates Fringes
BOILERMAKER......................$ 32.40 25.37
BRMN0001‐050 05/01/2014
ST LOUIS (Remaining Northern part)
Rates Fringes
TILE SETTER......................$ 24.57 20.42
BRMN0003‐008 05/01/2014
ST. LOUIS COUNTY (City of Duluth and South of a line between Townships #54 & #55, 2 miles north of Cotton)
BRICKLAYER.......................$ 32.20 20.10
BRMN0003‐011 05/01/2008
ST. LOUIS (City of Duluth and south of Township Line 55)
Rates Fringes
TILE SETTER......................$ 24.13 17.38
BRMN0016‐002 05/01/2014
ST. LOUIS COUNTY (North of a line between Townships #54 & #55, 2 miles north of Cotton)
BRICKLAYER.......................$ 31.75 20.55
CARP0068‐005 07/01/2012
Rates Fringes
SOFT FLOOR LAYER.................$ 30.94 11.75
CARP0361‐012 07/11/2011
DULUTH AREA including Alborn, Arnold, Bartlett, Birch, Brookstone, Canyon, Clinton, Culver, Floodwood, Gowan, Island, Kelsey, Lakewood, Meadowlands, Munger, Palmers, Payne, Prasit, Shaw, Taft)
CARPENTER (Including Acoustical Installation, Drywall Hanging, Form Work & Overhead Door Installation)......$ 27.20 14.75
CARP0606‐001 05/01/2012
EXCLUDING DULUTH AREA
Rates Fringes
CARPENTER (Including Acoustical Installation, Drywall Hanging, Form Work & Overhead Door Installation)......$ 27.97 12.72
ELEC0242‐012 06/01/2014
ST. LOUIS (South part bounded on the north by the north line of Kelsey Township extended east & west)
ELECTRICIAN......................$ 32.54 24.07
ELEC0294‐006 06/01/2014
ST. LOUIS (North part bounded on the south by the south line of Ellsburg Township, extended east & west)
ELECTRICIAN......................$ 33.72 73.34%
ENGI0049‐045 05/01/2015
Rates Fringes
OPERATOR: Power Equipment
GROUP 1.....................$ 37.74 17.15
GROUP 2.....................$ 37.40 17.15
GROUP 3.....................$ 35.99 17.15
GROUP 4.....................$ 35.65 17.15
GROUP 5.....................$ 35.48 17.15
GROUP 6.....................$ 33.97 17.15
GROUP 7.....................$ 32.85 17.15
GROUP 8.....................$ 30.84 17.15
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 1: Truck & Crawler Crane with 200' of Boom & Over, including Jib ($.50 premium with 300' of Boom & over, including jib); & Tower Crane 250' & Over.
GROUP 2: Truck & Crawler Crane with 150' of Boom, up to but not including 200' of Boom, including Jib; & Tower Crane 200' & Over.
GROUP 3: Traveling Tower Crane; Truck & Crawler Crane, up to but not including 150' of Boom, including Jib; Tower Crane (Stationary) up to 200'; All‐Terrain Vehicle Crane, Boom Truck over 100 ft.
GROUP 4: Backhoe/Track/Trackhoe, Hoist (3 drums or more);
Overhead Crane (inside building perimeter), Excavator.
GROUP 5: Asphalt Spreader, Bulldozer, Curb Machine, Drill, Forklift, Compressor 450 CFM or over (2 or more machines);
Boom Truck up to 100 ft, Loader over 1 cu yd, Hoist (1 or 2 drums); Mechanic; Milling Machine, Roller, Scraper, Tractor over D2.
GROUP 6: Bobcat/Skid Loader, Loader up to 1 cu. yd., Tractor D2 or similar size.
GROUP 7: Compressor 600 CFM or over, Crane Oiler.
GROUP 8: Oiler.
IRON0512‐018 05/01/2015
Rates Fringes
IRONWORKER, ORNAMENTAL,
REINFORCING, AND STRUCTURAL......$ 31.04 23.45
LABO1091‐011 01/01/2014
Rates Fringes
LABORER (ASBESTOS ABATEMENT)
Removal from Floors, Walls & Ceilings..................$ 27.89 16.31
LABO1091‐013 05/01/2012
ST. LOUIS (South of T 55 N)
Rates Fringes
Laborers:
GROUP 1.....................$ 21.95 14.93
GROUP 2.....................$ 22.10 14.93
GROUP 3.....................$ 22.35 14.93
GROUP 4.....................$ 22.65 14.93
LABORER CLASSIFICATIONS
GROUP 1: Common or General, Asphalt Shoveler, Carpenter Tender, Form Stripping
GROUP 2: Vibrating Plate
GROUP 3: Pipelayer
GROUP 4: Mason Tender (Brick, Cement/Concrete)
LABO1097‐008 05/01/2012
ST.LOUIS (North of T 55N)
Rates Fringes
LABORER
GROUP 1.....................$ 20.62 16.25
GROUP 2.....................$ 21.02 16.25
LABORERS CLASSIFICATIONS
GROUP 1 ‐ Common or General, Asphalt Shoveler, Carpenter Tender, Form Stripping, Mason Tender (Brick, Cement/Concrete)
GROUP 2 ‐ Pipelayer, Vibrating Plate
PAIN0106‐001 05/01/2013
Rates Fringes
GLAZIER..........................$ 26.28 15.47
FOOTNOTE:
1 to 4 years service ‐ 1 week paid vacation; 5 to 11 years ‐ 2 weeks paid vacation; 11 years or more ‐ 3 weeks paid vacation
PAIN0106‐013 05/01/2014
Rates Fringes
Painters:
New:
Brush, Roller..............$ 28.81 15.27 Spray, Drywall Finisher/Taper.............$ 29.41 15.27 Repaint:
Brush, Roller..............$ 27.31 15.27 Spray, Drywall Finisher/Taper.............$ 27.91 15.27
PLAS0633‐024 05/01/2012
ST. LOUIS (North of White Face River) COUNTIES
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 26.71 14.64
PLAS0633‐059 05/01/2012
CARLTON & ST. LOUIS (South of T 55N) COUNTIES
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 29.69 16.30
PLUM0011‐019 05/12/2014
ST. LOUIS (South of an east‐west line drawn through Cotton)
Rates Fringes
PLUMBER/PIPEFITTER...............$ 37.27 14.03
PLUM0589‐007 05/01/2014
ST. LOUIS (North of an East‐ West line drawn through Cotton)
Rates Fringes
PLUMBER/PIPEFITTER
Contracts $90,000.00 and under.......................$ 39.46 17.01 Contracts over $90,000.00...$ 39.46 17.01
ROOF0096‐024 07/05/2013
ST. LOUIS (South of Hwy 16, excluding City of Forbes)
Rates Fringes
ROOFER...........................$ 31.15 14.08
* ROOF0096‐025 05/01/2015
ST. LOUIS (Remaining Northern two‐thirds)
ROOFER...........................$ 28.89 11.13
SHEE0010‐045 05/01/2009
ST. LOUIS (Southern one‐third)
Rates Fringes
SHEET METAL WORKER (Including HVAC Duct Installation)..........$ 31.61 16.52
SHEE0010‐056 05/01/2008
ST. LOUIS (Northern two‐thirds)
Rates Fringes
SHEET METAL WORKER (Including HVAC Duct Installation)..........$ 29.99 16.08
SUMN2009‐050 07/27/2009
Rates Fringes
LABORER: Landscape..............$ 12.88 4.61
TRUCK DRIVER: Dump Truck........$ 19.15 5.70
WELDERS ‐ Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198‐005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non‐union rates. Example: SULA2012‐007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG‐OH‐0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis‐Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division
U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
(End of Summary of Changes)
File details come from the government source that posted it. Updated .