Appendix_A.pdf

PDF 2 MB Posted

Attached to
Duluth Facility Energy Optimization at Duluth Area Office, Duluth, MN
Solicitation number
W911XK-15-B-0007
Issued by

About this file

Ceiling Materials Impacted by Interior lighting Replacement

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Appendix A - Ceiling Materials Impacted by Interior lighting Replacement

Picture 1: Map Callout R1 in Rooms 1, 9& 10

• Remove Lights and Install new Recessed lights

Picture 2: Map Callout C1, C2, & C3

• This picture being displayed is map callout C2.

• All C1, C2 & C3 lights are mounted to Plywood and surrounded by plaster except in rooms

103,104,105, & 106. (See picture 3) The contractor shall patch/texture/paint the plywood to match the adjacent ceilings.

Picture 3: Map C1 in Rooms 103, 104, 105, & 106

• Lights are mounted to a sheet of plywood adjacent to a suspended metal grid system. Paint the plywood wood to match the color of the surrounding ceiling.

File details come from the government source that posted it. Updated .