Appendix_A.pdf
PDF 2 MB Posted
- Solicitation number
- W911XK-15-B-0007
About this file
Ceiling Materials Impacted by Interior lighting Replacement
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Appendix A - Ceiling Materials Impacted by Interior lighting Replacement
Picture 1: Map Callout R1 in Rooms 1, 9& 10
• Remove Lights and Install new Recessed lights
Picture 2: Map Callout C1, C2, & C3
• This picture being displayed is map callout C2.
• All C1, C2 & C3 lights are mounted to Plywood and surrounded by plaster except in rooms
103,104,105, & 106. (See picture 3) The contractor shall patch/texture/paint the plywood to match the adjacent ceilings.
Picture 3: Map C1 in Rooms 103, 104, 105, & 106
• Lights are mounted to a sheet of plywood adjacent to a suspended metal grid system. Paint the plywood wood to match the color of the surrounding ceiling.
File details come from the government source that posted it. Updated .