About this file

Plans

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LEGEND:

CENTERLINE

SHORE LINE

STATION NORTH EAST

STATION NORTH EAST

315908.702

283765.932

279099.264

270863.819

263760.720

2521190.574

2501326.004

2494379.525

2491065.914

2488659.986

CHANNEL CONTROL DATA

24.0’ DEPTH CONTOUR

CLTP-A

CLTP-B

CLTP-C

CLTP-D

CLTP-E

TOLERANCE DIMENSION LINE

CHANNEL LINE

REQUIRED DREDGING AREA

TO 24.0’ BELOW L.W.D.

315777.289

316040.122

284853.153

283588.531

283346.865

279544.430

279363.135

278167.210

276840.101

270811.725

270915.913

263712.601

263808.838

261194.727

261259.663

259578.122

259633.346

258436.495

258460.960

2521403.211

2520977.925

2501704.050

2501510.220

2500253.926

2495490.450

2494324.021

2494351.426

2493632.205

2491206.629

2490925.199

2488802.048

2488517.924

2487949.204

2487654.480

2487775.232

2487479.463

2487469.122

2487165.103

CHPT-1

CHPT-2

CHPT-4

CHPT-5

CHPT-6

CHPT-7

CHPT-8

CHPT-9

CHPT-11

CHPT-13

CHPT-14

CHPT-15

CHPT-16

CHPT-17

CHPT-18

CHPT-19

CHPT-20

CHPT-21

CHPT-22

CHANNEL CONTROL DATA

MICHIGAN

WISCONSIN

MICHIGAN

N

SCALE = 1"=50 MILES

FRANKFORT

CEDAR

RIVER

WASHINGTON

ISLAND

GLADSTONE

MENOMINEE

MARINETTE

TRAVERSE CITY

STURGEON BAY

ALGOMA

KEWAUNEE

TWO RIVERS

GREEN BAY

OCONTO

PENSAUKEE

L A

K E

M I

C H I

G A

N

LAKE

WINNEBAGO

G R E E

N

B A

Y

BIG

SUAMICO

SHEBOYGAN LOCATION MAP

GREEN BAY HARBOR, WISCONSIN

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

SHEET

IDENTIFICATION

D A

T E

A P

P R

SHEET OF

fi

US Army Corps of Engineers

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

L O

C A

T

IO

N M

A P

G E

N E

R A

L P

L A

N

C H

A N

N E

L C

O O

R D

IN

A T

E S

IN

D E

X O

F D

R A

W

IN

G S

G E

N E

R A

L N

O T

E S L

E G

E N

D

G R

E E

N B

A Y H

A R

B O

R

W I.

D-01 1 5

K J

W P J

O W

X K -1

-R -0

A N

S I

D

K J

W

D E

T R

O

IT

D

IS

T R

IC

T

D E

T R

O

IT

M I.

FY11 MATOC

F Y M

A T

O C

GENERAL NOTES:

1. THE REQUIRED MAINTENANCE DREDGING AREA WILL BE BASED UPON

THE 24.0 FT DEPTH CONTOUR RESULTING FROM SURVEYS TAKEN

WITHIN THE UPSTREAM AND DOWNSTREAM LIMITS SHOWN.

2. SOUNDINGS AND DEPTHS ARE REFERENCED TO LOW WATER DATUM, 577.5 FEET ABOVE

MEAN WATER LEVEL AT RIMOUSKI, QUEBEC INTERNATIONAL GREAT LAKES DATUM 1985.

SOUNDINGS ARE SHOWN AS THUS: -20.8

3. GRID SYSTEM BASED ON LAMBERT PROJECTION, WISCONSIN STATE

PLANE COORDINATE SYSTEM, CENTRAL ZONE (4802), 1983 NORTH

AMERICAN DATUM.US SURVEY FOOT

4. DREDGING WORK UNDER THIS CONTRACT FOR THE CONDITIONS SHOWN IS

MARKED REQUIRED.

5. DETAILED DESCRIPTION OF BENCH MARKS AND HORIZONTAL CONTROL

WILL BE PROVIDED BY THE LAKE MICHIGAN AREA OFFICE- KEWAUNEE SUB OFFICE.

6. SEE SHEET 5 OF 5 FOR THE PLACEMENT AREA AT THE BAYPORT DISPOSAL FACILITY.

7. THE CONTRACTOR SHALL VERIFY THE LOCATION OF AUTHORIZED

CROSSINGS IN ACCORDANCE WITH THE SOLICITATION DOCUMENTS.

8. HYDRAULIC DREDGING IS PROHIBITED.

9. PROJECT DEPTHS IN THE DREDGE AREAS ARE 24.0’ BELOW L.W.D.

W D

M g b m a .d g n

F O

R R

E F

E R

E N

C E O

N L

Y

L

M

N

O

P

250691.113 2484240.278

250102.717 2484053.632

247397.991 2484213.542

246845.760 2484003.239

244704.624 2482217.469

Q

COORDINATE TABLE

STA. DESCRIPTION

COORDINATES

NORTHING EASTING

CENTERLINE PT.

DO.

DO.

DO.

261227.180 2487801.839

259605.734 2487627.347

F

G

242164.962 2479044.708

DO.

DO.

DO.

DO.

DO.

DO.

DO.

DO.

DO.

REQUIRED DREDGE AREA

Index of Drawings

Title Drawing No.

Green Bay Harbor, WI 1 of 5

FY11 Maintenance Dredging

Location Map, General Plan

Channel Coordinates, Index of Drawings

General Notes, & Legend

Green Bay Harbor, WI 2 of 5

FY11 Maintenance Dredging

Required Dredge Plan Area 2

CS 0+00 to CS 28+50B

& Typical Section

Green Bay Harbor, WI 3 of 5

Required Dredge Plan Area 2

CS 28+50B to CS 57+50B

Green Bay Harbor, WI 4 of 5

Required Dredge Plan Area 2

CS 57+50B to CS 75+00B

Green Bay Harbor, WI. 5 of 5

Bayport Disposal Facility

Government Furnished Transfer Site

TYP. TYPICAL

DREDGE LIMIT LINE

LWD LOW WATER DATUM

EASTING

CS CHANNEL STATION

REQ’D. REQUIRED

270811.725 2491206.629 CH. PT. 13

270915.913 2490925.199 CH. PT. 14

263712.601 2488802.048 CH. PT. 15

263808.838 2488517.924 CH. PT. 16

261194.727 2487949.204 CH. PT. 17

261259.663 2487654.480 CH. PT. 18

600040002000

SCALE OF FEET

U.S. ARMY ENGINEER DISTRICT, DETROIT

0 2000

MI

LTARY

AVE

W E

S T

O

W

R

D

I

V E

V E

L P

V

E

S H

A W

A

E

M A

S

U

S T

A T

E

WEBSTER ST

H U

R L

B U

E

US 41

D O

U S

M

MI.

MI.

MI. 6

MI. 7

MI. 11

MI. 2

MI. 0

MI. 3

MI. 4

MI. 5

MI. 6

MI. 7

MI. 8

MI. 9

MI. 10

DREDGED

MATERIAL

DISPOSAL

AREA

A

S T

M

BROADWAY

PROJECT DEPTH 26 FT.

PROJECT DEPTH 24

FT. PROJECT DEPTH 26 FT.

MI.2

MI

N

MI. 4

MI. 5

GREEN

BAY

GREEN BAY

P O

R L I

E R

M A

S O

N

MONROE

W A

L N

U T

RIVERSIDE DR

FOX RIVER

BAYPORT

DISPOSAL

FACILITY

0+00

I

GOV’T FURNISHED

TRANSFER SITE

NORTHING

GENERAL PLAN

H

I

J

K

256763.307 2486865.182

256118.659 2486103.117

253908.864 2484944.631

252544.318 2484605.198

COORDINATE TABLE

2, 9, E 2, 9, N

N

N

N

N

N

25+00B

0 100 100 200FT

SCALE: 1’’= 100’

DREDGE PLAN

-10

-20

-30

-40

-10

-20

-30

-40

MATERIAL REQ’D TO BE DREDGED

REQ’D PAY PRISM LINE

1.0’ ALLOWABLE PAY

OVERDEPTH PRISM

SIDESLOPE PAYMENT

LIMIT LINE (TYP.)

EXISTING BOTTOM

25’ TD 25’ TD

000 100 200 300 400 500 600

LWD 577.5

C H

A N

N

I

N E C

H A

N N

N E

SECTION NOTES

1. THIS SECTION IS A PICTORIAL REPRESENTATION OF A TYPICAL

AREA WITHIN THE REQUIRED DREDGING AREA.

2. THE ALLOWABLE PAY OVERDEPTH QUANTITY IS COMPUTED

IMMEDIATELY BELOW THE REQUIRED MATERIAL TO BE DREDGED.

OVEREDEPTH DREDGING IS ALLOWED BUT NOT REQUIRED.

3. FOR SIDE SLOPE DREDGING, PAYMENT WILL BE MADE FOR

MATERIALS REMOVED WHICH EXIST ABOVE THE SIDE SLOPE PAYMENT LIMIT

LINE. SIDESLOPE DREDGING IS ALLOWED BUT NOT REQUIRED.

CLT

P-

E

CHTP

-1

O R

L

W

D

R E

Q U I

R

P T

H

SEE SHEET 1 FOR NOTES & LEGEND

TYPICAL SECTION

0+00 5+00B 10+00B 15+00B 20+00B

REQUIRED DEPTH 24.0’ BELOW LWD

CHANNEL LINE

CHANNEL LINE

scale as shown

UPSTREAM LIMIT OF REQUIRED DREDGING

M A

T

H

E

CHPT-

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

SHEET

IDENTIFICATION

D A

T E

A P

P R

SHEET OF

fi

US Army Corps of Engineers

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

R E

Q U

IR

E D D

R E

D G

E P

L A

N A

R E

A

C S

T

O C

S

B

T

Y P

IC

A L S

E C

T

IO

N

G R

E E

N B

A Y H

A R

B O

R

W I.

F Y M

A T

O C

D-02 2 5

K J

W P J

O W

X K -1

-R -0

A N

S I

D

K J

W

D E

T R

O

IT

D

IS

T R

IC

T

D E

T R

O

IT

M I.

W D

M g b m a .d g n

2, 0, N

N

N

N

N

0 N

30+00B 35+00B 40+00B 45+00B 50+00B 55+00B

0 100 100 200FT

SCALE: 1’’= 100’

DREDGE PLAN

N

CHANNEL LINE

CHANNEL LINE

M A

T

E

2 M

T

E

SEE SHEET 1 FOR NOTES & LEGEND

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

SHEET

IDENTIFICATION

D A

T E

A P

P R

SHEET OF

fi

US Army Corps of Engineers

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

R E

Q U

IR

E D D

R E

D G

E P

L A

N A

R E

A

C S

B T

O C

S

B

G R

E E

N B

A Y H

A R

B O

R

W I.

F Y M

A T

O C

D-03 3 5

K J

W P J

O W

X K -1

-R -0

A N

S I

D

K J

W

D E

T R

O

IT

D

IS

T R

IC

T

D E

T R

O

IT

M I.

g b m a .d g n

W

M

CHPT-13

PROJECT DEPTH 26.0 FEET

E 2, 1, N

N

N

80+00B 85+00B

75+00B60+00B 65+00B 70+00B

REQUIRED DEPTH 24.0’ BELOW LWD

CHPT-14

SEE SHEET 1 FOR NOTES & LEGEND

DOWNSTREAM LIMIT OF REQUIRED DREDGING

0 100 100 200FT

SCALE: 1’’= 100’

DREDGE PLAN

E 2, 1, E 2, 2, N

N

N

CHANNEL LINE

CHANNEL LINE

CLTP-D

M A

T

E

O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

SHEET

IDENTIFICATION

D A

T E

A P

P R

SHEET OF

fi

US Army Corps of Engineers

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

R E

Q U

IR

E D D

R E

D G

E P

L A

N A

R E

A

C S

B T

O C

S

B

G R

E E

N B

A Y H

A R

B O

R

W I.

D-04 4 5

K J

W P J

O W

X K -1

-R -0

A N

S I

D

K J

W

D E

T R

O

IT

D

IS

T R

IC

T

D E

T R

O

IT

M I.

F Y M

A T

O C

W D

M g b m a .d

GOVERNMENT FURNISHED

TRANSFER SITE

PT-3

N 263,000

W A L L

W A

L L

W A

L L

WALL

WALL

WALL

WALL

A

PILE

PILE

PILE

PILE

PILE

T A

N K S

TANKS

PIPES

D A

M

R I

V E

R

W A

T E

R E

D G

E

W A T E R

E D

G E

P

P

P

P

P b w a l l

OFFICE BLDG

I - 43

B Y

L S

Y

E

HURLBUT ST

BULK STORAGE

RAILGROUND

W A T E R

E D

G E

TANKS

TANKS

TANKS

FOX RIVER DOCK CO.

TO BAY PORT

DISPOSAL

FACILITY

BOAT SLIP

N 261,000

N 262,000

OFF LOADING AREA

160’

180’

MATC

H

LIN

SE

INSE

T M

AP

NO SCALE

LEGEND:

OFFLOADING, ACCESS, AND

WORK AND STORAGE AREA

1 20+00 TOP OF PROPERTY PIPE 583.83

2 9+95 PK IN POPPEL TREE 586.07

3 12+20 RR SPIKE IN POWER POLE 589.11

4 5+50 586.28

5 7+20 S. BOLT, TOP OF HYD. NW COR. 599.52

BENCH MARKS - DISPOSAL SITE

NO. STATION DESCRIPTION ELEV.

M.H. IN FRONTAGE RD. R/W

NOTES:

REQUIRED PLACEMENT AREA FOR DREDGED MATERIAL

1. ALL ITEMS SHOWN ARE EXISTING UNLESS INDICATED AS REQUIRED (REQD).

2. ELEVATIONS ARE REFERRED TO MEAN WATER LEVEL AT FATHER

POINT, QUEBEC, CANADA INTERNATIONAL GREAT LAKES DATUM (I.G.L.D.) 1955.

3. SURVEY CONTROL AND BENCH MARK DATA IS AVAILABLE FROM THE DETROIT

DISTRICT, KEWAUNEE SUB OFFICE.

4. GRID SYSTEM IS ON LAMBERT PROJECTION, WISCONSIN STATE PLANE

COORDINATE SYSTEM, CENTRAL ZONE, NORTH AMERICAN DATUM 1983 (NAD 83).

US SURVEY FOOT

5. THE DOCK OPERATORS, FOR THE DURATION OF THE CONTRACT PERIOD,

SHALL PROVIDE DOCKING SPACE AT NO CHARGE TO THE U.S. ARMY CORPS OF ENGINEERS

ORTHEIR CONTRACTORS FOR THE PURPOSE OF DREDGING AND DISPOSING

OF DREDGED MATERIALS.

6. VEHICULAR EQUIPMENT SHALL BE MAINTAINED TO PREVENT LOSS OF WATER

AND DREDGED MATERIAL WHILE TRAVELING FROM THE TRANSFER AREA TO THE

CONFINEMENT AREA. DREDGED MATERIALS THAT ARE SPILLED

SHALL BE IMMEDIATELY REMOVED AND PLACED IN THE DISPOSAL AREA.

7. ALL EQUIPMENT SHALL BE OPERATED AT SPEEDS THAT PREVENT

DEGRADATION OF RAMPS AND ROADWAYS.

8. HYDRAULIC DISPOSAL IS PROHIBITED.

9. THE CONTRACTOR SHALL ACCESS BAYPORT DISPOSAL FACILITY

FROM MILITARY AVE.

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

P L

O T S

C A

L E

P L

O T D

A T

E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

SHEET

IDENTIFICATION

D A

T E

A P

P R

SHEET OF

fi

US Army Corps of Engineers

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

B A

Y P

O R

T D

IS

P O

S A

L F

A C

IL

IT

Y

G O

V E

R N

M E

N T F

U R

N

IS

H E

D T

R A

N S

F E

R S

IT

E

G R

E E

N B

A Y H

A R

B O

R

W I.

F Y M

A T

O C

D-5 5 5

K J

W P J

O W

X K -1

-R -0

A N

S I

D

K J

W

D E

T R

O

IT

D

IS

T R

IC

T

D E

T R

O

IT

M I.

W D

M

S U

B M

IT

T E

D B

Y g b m a .d g n

C

PT-4

BAYPORT DISPOSAL FACILITY1

230’

P R

O P

O S

C E S S

R

O A

D

C O

N S T R

U C T I

O N

S

T

G

A

C

S

I

N V

N

I

N V

A

C

O U T F

A L L

S

I

N V

N

I

N V

P R

O P

O S

C E S S

R

O A

D

C O

N S T R

U C T I

O N

S

T

A

C

M P

A

C

M P

P R

O P

O S

C E S S

R

O A

D

C O

N S T R

U C T I

O N

S

T

A

C

M P

A

C

M P

A

C

M P

A

C

M P

F U T U R E

A

C

M P

A

C

M P

X

X

D R

A I

N A

G E

C

O N T R

O L

S T R

U C T

U

A S S

O C I

A T E

D

P I P I

N G

S E E

P L

E C T I

G

X

2 5

O U T F

A L L

E

X I S T I

N G

POND NO. 4

POND NO. 5

POND NO. 3

POND NO. 2

O U T F

A L L

X

A

C

W

I

N V

E

I

N V

P R

O P E R T

Y

B

O U

N D

A R

Y

I N T E R I

O R

B E R

M S

T

O P

O F

B E R

M

E L

I N T E R I

O R

B E R

M S

T

O P

O F

B E R

M

E L

E X I S T I

A I

N A

G E

C

O N T R

O L

S T R

U C T

U R E

A

C

M P

O U T F

A L L

A

C

W

I

N V

E

I

N V

P R

O P E R T

Y

B

O U

N D

A R

Y

S U R F

A

T

A I

N A

G E

D I T C

H I

N G

T E

M P

O R

A R

Y

S

A N

D

F I L T E R

A

C

M P

A

C

M P

A

C

M P

C E

LL

22’ EASEMENT

250’ EASEMENT

M.H.

M.H.

TELE.

BM #1

BM #3

BM #2

BM #5

BM #4

B

F

E E

N

B

A Y

BERMBERM

275’ EASEMENT

275’ EASEMENT

315’ EASEMENT

ELEV. 590.50

N 268,000

N 269,000

N 270,000

GUY WIRE

M.H.

P R

O P E R T

Y

L

IN

E

PROPERTY

LI

NE

P R

O P E R T

Y

L

IN

E

M.H.

TELE.

CLAY BERM BUILT

1" I.P.

2"I.P.

P R

O P E R T

Y

L

IN

E

PROPERTY LINE

H

H

H

WOODS

I.P.

I.P.

IRON PIN

I.P.

I.P.

I.P.

IRON PIN

IRON PIN

IRON PIN

BASELINE

BASELINE

X

POND NO. 2

0 5

O U T F

A L L

I N

D I C

A T E S

F I

N A L

T

O P S

O I

A D E S

C O

N T

O U R S

S

H O

T

H

T C

H

S E C T I

G

A S S

O C I

A T E

D

P I P I

N G

S E E

P L

R

A I

N A

G E

C

O N T R

O L

S T R

U C T

U

O F

B E R

M

E L

P E R I

M E T E R

B E R

M S

T

O P

POND NO. 1

O U T F

A L L

E

X I S T I

N G

C E L L

C E L L

X

X 584.50

X 586.00

X

X

X

584.00 X

0 300 300 600FT

SCALE: 1’’= 300’

NORTH FRONTAGE ROAD

(HURLBUT STREET)

LC

L I T

A

E

A N

S F

T E

CELL 5

ACCESS ROAD

CELL 2

CELL 4

120’

40’

582.00 X

X

P E R I

M E T E R

B E R

M S

T

O P

O F

B E R

M

E L

P E R I

M E T E R

B E R

M S

T

O P

O F

B E R

M

E L

P E R I

M E T E R

B E R

M S

T

O P

O F

B E R

M

E L

P E R I

M E T E R

B E R

M S

T

O P

O F

B E R

M

E L

P E R I

M E T E R

B E R

M S

T

O P

O F

B E R

M

E L

I N T E R I

O R

B E R

M S

T

O P

O F

B E R

M

E L

P E R I

M E T E R

B E R

M S

T

O P

O F

B E R

M

E L

O F

B E R

M

E L

I N T E R I

O R

B E R

M S

T

O P

I N T E R I

O R

B E R

M S

T

O P

I N T E R I

O R

B E R

M S

T

O P

O F

B E R

M

E L

N

E

E

E

E

F E

R E

N

3. BENCH MARK AND HORIZONTAL CONTROL DATA WILL BE

CROSSINGS IN ACCORDANCE WITH THE SOLICITATION DOCUMENTS.

THE SPECIFICATIONS FOR INFORMATION REGARDING REQUIREMENTS

FOR PLACEMENT OF DREDGED MATERIALS WITHIN THE

PROJECTION, MICHIGAN SYSTEM OF STATE PLANE COORDINATES,

7. THE CONTRACTORS ATTENTION IS DIRECTED TO SECTION 35 20 23 OF

1. THE REQUIRED MAINTENANCE DREDGING AREAS WILL BE BASED UPON THE

2. ALL DEPTHS, CONTOURS AND ELEVATIONS ARE REFERRED TO LOW

ABOVE MEAN WATER LEVEL I.G.L.D. 1985. SOUNDINGS ARE SHOWN AS THUS: -20.7.

4. THE GRID COORDINATE SYSTEM SHOWN IS BASED ON THE LAMBERT

6. THE CONTRACTOR SHALL VERIFY THE LOCATION OF AUTHORIZED

GOVERNMENT-FURNISHED DISPOSAL AREA.

UPSTREAM AND DOWNSTREAM LIMITS SHOWN.

23.0 FT. DEPTH CONTOURS RESULTING FROM SURVEYS TAKEN WITHIN THE

5. THE AUTHORIZED DEPTHS FOR GRAND HAVEN HARBOR IN THE AREAS TO

WATER DATUM (L.W.D.) FOR LAKE MICHIGAN ELEVATION 577.5 FT.

BE DREDGED ARE 23.0 FT. BELOW L.W.D.

SOUTH ZONE, 1983 NORTH AMERICAN DATUM, U.S. SURVEY FOOT.

NOTES

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

SHEET

IDENTIFICATION

D A

T E

A P

P R

SHEET OF

fi

US Army Corps of Engineers

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

G E

N E

R A

L P

L A

N L

O C

A T

IO

N M

A P ,N

O T

E G

E N

D

G R

A N

D H

A V

E N H

A R

B O

R M M

I

O U

T E

R P

O R

T

IO

N

D-01 1 2

F Y

M

A T

O C

A N

S I

D

/1 /2

D E

T R

O

IT

D

IS

T R

IC

T

D E

T R

O

IT

M

IC

H

IG

A N

P J

O

P J

O K J

W

W D

M

W

X K -1

-R -0 g h m a .d g n

’PROVIDED BY THE LAKE MICHIGAN AREA OFFICE.

GRAND HAVEN HARBOR,

MICHIGAN

LEGEND

REQUIRED MAINTENANCE DREDGING AREA

TO 23.0 FT. BELOW L.W.D.

23.0 FT. DEPTH CONTOUR

CHANNEL LINE

CENTER LINE

SHORELINE

ORDINARY HIGH WATER MARK OHWM

LOW WATER DATUM L.W.D.

CHANNEL LINE TURNING POINT 2

CENTER LINE TURNING POINT CL 1

HORIZONTAL CONTROL POINT 29

BENCH MARK B.M. X

T.D. LINE

TYPICAL (TYP)

CROSS SECTION C.S.

REQUIRED REQ,D

PROJECT SITE

MICHIGAN

ILLINOIS

INDIANA OHIO

LAKE SUPERIOR

GEORGIAN

BAY

LA

KE

ERI

CANADA

0 5025 75 100

LAKE HURON

MICHIGAN

LAKE

N

LOCATION MAP SCALE OF MILES

INTERNATIONAL

BOUNDARY

I N T E

RNATI

ONAL

MINNESOTA

SOO

WISCONSIN

SAGINAW

DETROIT NDARY

B O

DULUTH

U

US ARMY CORPS

OF ENGINEERS

DETROIT DISTRICT

MICHIGAN

GREEN BAY

CHICAGO

IOWA

DAVENPORT

CLEVELANDFORT WAYNE

GRAND

HAVEN

F T . A

L O

O R

E L

IN

E

O

N G

0 25 50 75 100 125 150 175 200 225 250 275 300 325 350 375 400 425 450 475 500 525 550 575 600 625 650-25-50-75-100-125-150-175-200-225-250-275-300-325-350-375-400-425-450-475-500-525-550-575-600-625-650-675-700-725-750-775

-5

-10

-15

-20

-25

-30

-35

-5

-10

-15

-20

-25

-30

-35

S H

O R

E L I

N E

EXSITING SHORELINE (VARIES)-

LANDWARD LIMIT FOR PLACEMENT OF

DREDGED MATERIALS

MOST LANDWARD 12.0 FT. DEPTH CONTOUR -

LAKEWARD LIMIT OF PLACEMENT

NO SCALE

NEARSHORE PLACEMENT AREA

REQUIRED DREDGING AREA

DRAWING INDEX

SHEET TITLESHEET NO.

2 OF 2 DREDGE PLAN

1 OF 2 GENERAL PLAN, LOCATION MAP, NOTES & LEGEND

NOTES:

1. THE ALLOWABLE OVERDEPTH QUANTITY

IS COMPUTED IMMEDIATELY BELOW THE

REQUIRED MATERIALS TO BE DREDGED.

2. FOR SIDE SLOPE DREDGING, PAYMENT

WILL BE MADE FOR MATERIALS REMOVED

WHICH EXIST ABOVE THE SIDE SLOPE

PAYMENT LIMIT LINE SHOWN.

3. THIS SECTION IS A PICTORIAL

REPRESENTATION OF A TYPICAL

AREA WITHIN THE REQUIRED

DREDGING AREA.

R E

Q U

IR

P T

H

.0

F T

B E L

.W .D

L.W.D. =0.0 FT. =577.5 FT.

C CENTERLINE

50 FT.

L

C H

A N

N

IN

E

C H

A N

N

E

50 FT.

REQUIRED PAY

PRISM LINE

MATERIAL REQUIRED TO

BE DREDGED

SIDE SLOPE DREDGING -

ALLOWED BUT NOT REQUIRED (TYP)

SIDE SLOPE PAYMENT

LIMIT LINE

EXISTING BOTTOM

SCALE AS SHOWN

1.0 FT. ALLOWABLE PAY

OVERDEPTH PRISM (TYP)

TYPICAL SECTION A-A

D R

N O

R

A C

H

FY 11 MATOC

SITE PLAN

SCALE:1’’= 400’

200400 400 800FT

GRAND

HAVEN

HARBOR

LAKE MICHIGAN

R

IP

R A

P

L I

G H

T

A

D D

T.P. EAST NORTH

X Y

A

B

CC

DD

12,618,412.21

12,620,508.92

12,620,579.45

CHANNEL LINE T.P.

T.P. EAST NORTH

X Y

12,618,358.07

12,619,845.64

12,620,544.18

CENTER LINE T.P.

573,278.68

573,446.33

573,525.06

573,435.73

573,672.04

573,378.09

573,129.62

N

N

N

E 12,618,000

E 12,618,000

C

C/L B-1

C/L O

C/L 1

Z1

X1

12,618,374.87

12,617,877.92

12,617,251.90

574,160.24

574,089.70

Y1 12,617,458.20

572,303.7012,618,014.6812,618,014.68W1

572,241.00

Y

C

S

C /L

B

X

C/L B-2 12,617,355.02 573,165.64

C H

A N

N E L

L

IN

E

C H

A N

N

N E

C H

A N

N E L

L

IN

E

A

D

D

1A 12,618,437.56 573,438.69

573,140.5112,618,471.241DD

A N

N E L

A N

N E L

L

U P S T R

E

IM

IT

R

E Q

U

IR

E D

G

.0

F T

B

E L

.D

0 100 100 200FT

SCALE: 1’’= 100’

N

50’ T.D.

LINE

50’ T.D.

LINE

EAST NORTH

X Y

HORIZONTAL CONTROL

STATION

COORDINATES

12,618,532.29

12,619,172.56

12,619,594.61

12,619,821.08

12,618,499.29

12,620,250.04

12,620,827.97

31 573,531.93

32 12,618,947.46 573,147.64

33 573,597312

34 573,217.64

35 573,668.12

LIGHT 573,063.72

JAJ 573,295.24

SAR-REB 573,426.67

12,618,428.76

12,620,155.54

573,069.39

573,280.00

C .S . 2

Z

W

DREDGE PLAN

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

SHEET

IDENTIFICATION

D A

T E

A P

P R

SHEET OF

fi

US Army Corps of Engineers

A N

S I

D

/1 /2

D O

W N

S T R

E

IM

IT

R

E Q

U

IR

E D

G

.0

F T . B

E L

.D

D-02 2 2

G R

A N

D H

A V

E N H

A R

B O

R M M

I

O U

T E

R P

O R

T

IO

N

F Y

M

A T

O C

D R

E D

G E P

L A

N

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

D E

T R

O

IT

D

IS

T R

IC

T

D E

T R

O

IT

M

IC

H

IG

A N

P J

O

K J

W P J

O

W D

M

W

X K -1

-R -0 g h m a .d

gbm01a11
gbm02a11
gbm03a11
gbm04a11
gbm05a11
ghm01a11
ghm02a11

File details come from the government source that posted it. Updated .