AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

1. Incorporate the RFI questions and answ ers; and

2. Incorporated List of Attachments.

All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 09-Sep-2022

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W911SG22B0007

X 9B. DATED (SEE ITEM 11)

02-Aug-2022

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

09-Sep-2022

CODE

MICC - FORT BLISS

111 PERSHING RD

FT BLISS TX 79916

W911SG 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W911SG22B0007

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 72 00 - GENERAL CONDITIONS

The following have been added by full text:

RFI QUESTIONS AND ANSWERS

RFI QUESTIONS AND ANSWERS

Building 730 Interior Demolition

1. General Note 13 on the drawings states that Fort Bliss requires a minimum of 60% of construction and demolition materials and debris from Landfill. Does this just mean to recycle 60% of the demoed material? Is there an official Army form that needs to be filled out?

ANSWER: Yes, A monthly C&D Waste Management Report of all materials resold, recycled, reused, or landfilled will be reported by the 10th of each month to the Environmental Division, Solid Waste Compliance Program Manager, Lilia.a.lenhart.civ@mail.mil with a copy to the Contract Officer Representative (COR). Please refer to Attachment - Solid Waste_C&D Diversion Guidance 2015.

2. Should we plan on demoing the section of CMU wall on the north side of room 103-A? If was mentioned at the site visit that this wall was constructed after the building was built and not part of the original building. This would also be helpful to take out the equipment and demolition debris.

ANSWER: Do NOT plan on demolishing CMU walls, this is only as a last resort if equipment cannot fit through existing doors and/or if the metal containers to be demolished cannot be cut in pieces and need to be removed whole. Approval from DPW-Historical is required for removal of CMU, and this will require submission of a proposed plan for their review before it can be signed off.

SECTION 01 00 00 - GENERAL REQUIREMENTS

The following have been added by full text:

ATTACHMENTS

ATTACHMENTS:

1. DWG_FINAL_Bldg 730_Interior Demolition

2. Wage Determination W911SG22B0007

3. Attachment - Recycling Policy_2015

4. Attachment - Solid Waste_C&D Diversion Guidance 2015

(End of Summary of Changes)