W911SD-19-R-0149_PRS_Title_V_Air_Permit_DPW_.pdf

PDF 100 KB Posted

Attached to
U. S. Army West Point Clean Air Compliance Testing & Reporting
Solicitation number
W911SD-19-R-0149
Issued by

About this file

Performance Requirements Summary

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE REQUIREMENTS SUMMARY (PRS)

Performance Objective

Performance Standard Acceptable Quality Level

Method of Surveillance Incentive / Disincentive

Perform the necessary calibrations, standardizations, and testing for the PEMS/CEMS, including but limited to the quarterly CGA audits and RATA audit for Boilers# I and #2, following specified test protocols, fuel testing, and meter calibrations

40CFR60 ,

Appendix B, EPA Performance Specification 3, and Appendix F; EPA Performance Specification I ;

EPA Method

Verified Customer comments/ Complaints supplemented by unscheduled inspections

PERIODIC May not invoice for work that is not completed according to EPA specification and industry standard. All nonconforming services will be required to be completed at 100% and at no additional cost to the government.

Submit test protocol and, upon approval, perform the necessary calibrations, standardizations, and testing for the Reasonably Available

Control Technology (RACT) for Boiler 3

40CFR60,

Appendix B, EPA Performance Specification 1

Verified Customer comments/ Complaints supplemented by unscheduled inspections

PERIODIC May not invoice for work that is not completed according to EPA specification and industry standard. All nonconforming services will be required to be completed at 100% and at no additional cost to the government.

Perform quarterly calibration and maintenance service on

CEMS hardware and

Lighthawk 560ES opacity meter at CPP and semi- annual traceable certification of neutral density filters

40CFR60,

Appendix B, EPA Performance Specification 1

Verified Customer comments/ Complaints supplemented by unscheduled inspections

PERIODIC May not invoice for work that is not completed according to EPA specification and industry standard. All nonconforming services will be required to be completed at 100% and at no additional cost to the government.

Provide emergency maintenance services for

Lighthawk 560ES opacity meter and CEMS hardware at

CPP

Paragraphs 1.3.11 and 1.3.19

Verified Customer comments/ Complaints supplemented by unscheduled inspections

PERIODIC May not invoice for work that is not completed according to EPA specification and industry standard. All nonconforming services will be required to be completed at 100% and at no additional cost to the government.

Perform annual visual opacity testing at 13 source stacks located at various locations on

WP property.

EPA method 9 Verified Customer comments/ Complaints supplemented by unscheduled inspections

PERIODIC May not invoice for work that is not completed according to EPA specification and industry standard. All nonconforming services will be required to be completed at 100% and at no additional cost to the government.

File details come from the government source that posted it.