W911SD-19-R-0088_PRS_Lightning_Suppersor_DPW.pdf

PDF 97 KB Posted

Attached to
Lighting Protection System U. S. Army West Point
Solicitation number
W911SD-19-R-0088
Issued by

About this file

PRS Lightning Protection System

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE REQUIREMENTS SUMMARY

ASP LIGHTNING PROTECTION SYSTEM

COR:

1. Performance Requirements Summary (PRS). The rights of the Government and remedies described in this PRS are in addition to other rights and remedies set forth in the contract. The PRS table lists the Required Services (RS), the standard of performance by which the Government will measure contractor performance, the allowable degree of deviation from perfect performance. The primary surveillance methods the Government will use to evaluate the Contractor’s performance in meeting the contract requirements, and the method which will be used to determine the amount of deduction from the maximum payment.

2. Surveillance Methods. The primary method of surveillance the Government will use to evaluate the Contractor’s performance is provided in the PRS table. The Government is not restricted to using only the methods shown; rather, the Government may supplement and/or modify the primary surveillance methods and frequency of inspections as it deemed necessary.

The methods of surveillance used will include, but are not limited to the following:

a. 100% Inspection. An evaluation method that requires complete inspection of every parking area/lot and/or location.

b. Spot Check Inspection. An evaluation method where less than 100% is inspected, the COR may drive around spot checking areas/lots parked, asking questions to parking attendant and/or supervisors on their duties/responsibilities, and verify the number/percentage of vehicles reported to be parked against actual number or percentage of vehicles in a particular area/lot.

c. Customer Comments. Customer comments constitute a surveillance method based on customer awareness and satisfaction, and is mainly used to supplement other surveillance methods. Customers familiar with contract requirements notify the Government when there is a case of observed poor performance or non-performance. Upon notification, the Government investigates the report and, if valid, documents the performance problem, notifies the Contractor and the COR.

3. Contractor Self-Reporting. The Contractor will provide the COR with a weekly, or as often as necessary, update via email or phone contact to the COR on coordination, plans and overall progress being made to meet the documented objectives as outlined in this PWS.

PRS TABLE

Specific Task Acceptable Level of Performance

(ALP)

Surveillance

Method Deduct

Demolition of existing Lightning protection system.

Contractor provides all labor, material, equipment and supervision in accordance to the standards defined in PWS to perform demolition of the existing lightning protection system.

QASP Q/A

100% and/or Spot Check/ or Customer Comments

Inspection/Acceptance

Installation of Lightning protection system (grounding, earth electrode system, bonding, etc.)

Contractor provides all labor, material, equipment and supervision in accordance to the standards defined in PWS to install the lightning protection system.

QASP Q/A

100% and/or Spot Check/ or Customer Comments

Inspection/Acceptance

Initial and Final Testing; As-built drawings; Manuals.

Contractor provides initial and final submittals of testing, drawings and manuals of the LSP to the COR.

100% inspection supplemented by customer comments/input and self-reporting

Inspection/Acceptance

Communications Contractor provides and maintains immediate and consistent communications between COR and Project Manager; and maintains communication with the COR via cell phone at any time during operations.

100% and/or Spot Check

Inspection/Acceptance

Communications Contractor provides COR a written AAR NLT 5 days after completion of their tasks noted in PWS.

100% Inspection/Acceptance

Security Requirements

Contractor employees comply with installation access and local security policies/procedures as directed by the

COR

100% and/or Spot Check

Inspection/Acceptance

File details come from the government source that posted it.