W911SD-16-T-0258-v2-conformed.docx
DOCX document 641 KB Posted
- Attached to
- Petoleum Tank Maintenance Federal contract opportunity
- Solicitation number
- W911SD-16-T-0258
About this file
Fully conformed Solicitation to include all changes. USE THIS to respond this requirement.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W911SD-16-T-0258-0002_.docx | DOCX document | |
| W911SD-16-T-0258-0001.docx | DOCX document | |
| Site_Visit_Roster_-_Tank_Main_-_24_Jan.pdf | ||
| W911SD-16-T-0258v1.docx | DOCX document | |
| Specific_Relevant_Contracts_Sheet.docx | DOCX document | |
| W911SD-16-T-0258.docx | DOCX document | |
| PAST_PERFORMANCE_QUESTIONNAIRE.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W911SD-16-T-0258
W911SD-16-T-0258
Section SF 1449 - CONTINUATION SHEET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 30 |
| Each |
INSTALL OR REPLACE FLOAT GAUGE
FFP
0001 INSTALLL OR REPLACE FLOAT GAUGE (per attached Performance Work Statement (PWS)) for the Base Year 29 Mar 2017 through 28 Mar 2018. Quantities are Estimates. (Note: for the solicitation offer use the amount $4500.00) FOB: Destination
PURCHASE REQUEST NUMBER: 0010748161
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 30 |
| Each |
INSTALL OR REPLACE INTERSTITIAL GAUGES
0002 INSTALL OR REPLACE INTERSTITIAL FLOAT GAUGES (per attached Performance Work Statement (PWS)) for the Base Year 29 Mar 2017 through 28 Mar 2018. Quantities are Estimates. (Note: for the solicitation offer use the amount $4500.00)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 30 |
| Each |
INSTALL OR REPLACE OVERFILL VALVE
0003 INSTALL OR REPLACE OVERFILL VALVE (per attached Performance Work Statement (PWS)) for the Base Year 29 Mar 2017 through 28 Mar 2018. Quantities are Estimates. (Note: for the solicitation offer use the amount $19,500.00)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 20 |
| Each |
INSTALL OR REPLACE OVERFILL ALARM
0004 INSTALL OR REPLACE OVERFILL ALARM (per attached Performance Work Statement (PWS)) for the Base Year 29 Mar 2017 through 28 Mar 2018. Quantities are Estimates. (Note: for the solicitation offer use the amount $7,500.00)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 40 |
| Each |
INSTALL OR REPLACE SPILL BUCKET
0005 INSTALL OR REPLACE SPILL BUCKET (per attached Performance Work Statement (PWS)) for the Base Year 29 Mar 2017 through 28 Mar 2018. Quantities are Estimates. (Note: for the solicitation offer use the amount $12,000.00)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 2 |
| Each |
INSTALL OR REPLACE LEAK DETECT MONITOR
0006 INSTALL OR REPLACE LEAK DETECT MONITOR (per attached Performance Work Statement (PWS)) for the Base Year 29 Mar 2017 through 28 Mar 2018. Quantities are Estimates. (Note: for the solicitation offer use the amount $3000.00)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 168 |
| Each |
MONTHLY UST INSPECTIONS
0007 MONTHLY UNDERGROUND STORAGE TANK INSPECTIONS (per attached Performance Work Statement (PWS)) for the Base Year 29 Mar 2017 through 28 Mar 2018.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1,680 |
| Each |
MONTHLY AST INSPECTIONS
0008 MONTHLY ABOVEGROUND STORAGE TANK INSPECTIONS (per attached Performance Work Statement (PWS)) for the Base Year 29 Mar 2017 through 28 Mar 2018.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 154 |
| Each |
REPLACE TANK LABELS
0009 REPLACE TANK LABELS (per attached Performance Work Statement (PWS)) for the Base Year 29 Mar 2017 through 28 Mar 2018. Quantities are Estimates. Quantities are Estimates.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 10 |
| Each |
REPAINT TANKS
0010 REPAINT TANKS (per attached Performance Work Statement (PWS)) for the Base Year 29 Mar 2017 through 28 Mar 2018. Quantities are Estimates.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 15 |
| Each |
PERFORM PRESSURE TESTING
0011 PERFORM PRESSURE TESTING (per attached Performance Work Statement (PWS)) for the Base Year 29 Mar 2017 through 28 Mar 2018. Quantities are Estimates.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Each |
UNSCHEDULED UST INSPECTIONS
0012 UNSCHEDULED UNDERGROUND STORAGER TANK INSPECTIONS (per attached Performance Work Statement (PWS)) for the Base Year 29 Mar 2017 through 28 Mar 2018. Quantities are Estimates.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 36 |
| Each |
UNSCHEDULED AST INSPECTIONS
0013 UNSCHEDULED ABOVEGROUND STORAGE TANK INSPECTIONS (per attached Performance Work Statement (PWS)) for the Base Year 29 Mar 2017 through 28 Mar 2018. Quantities are Estimates.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 300 |
| Each |
CLEAN SPILL BUCKET
0014 CLEAN SPILL BUCKET (per attached Performance Work Statement (PWS)) for the Base Year 29 Mar 2017 through 28 Mar 2018. Quantities are Estimates.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 30 |
| Hours |
MINOR REPAIR (SPOT PAINT, PLUMBING)
0015 MINOR REPAIR (SPOT PAINT, PLUMBING) (per attached Performance Work Statement (PWS)) for the Base Year 29 Mar 2017 through 28 Mar 2018. Quantities are Estimates.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 30 |
| Hours |
REPAIR ELECTRONICS
0016 REPAIR ELECTRONICS (per attached Performance Work Statement (PWS)) for the Base Year 29 Mar 2017 through 28 Mar 2018. Quantities are Estimates.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 30 |
| Hours |
REPAIR PLUMBING
0017 REPAIR PLUMBING (per attached Performance Work Statement (PWS)) for the Base Year 29 Mar 2017 through 28 Mar 2018. Quantities are Estimates.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 2 |
| Each |
AFTER HOURS RESPONSE
0018 AFTER HOURS RESPONSE (per attached Performance Work Statement (PWS)) for the Base Year 29 Mar 2017 through 28 Mar 2018. Quantities are Estimates.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Job |
PARTS FOR REPAIRS
0019 PARTS FOR REPAIRS (per attached Performance Work Statement (PWS)) for the Base Year 29 Mar 2017 through 28 Mar 2018. Estimated at $6000.00. (in response to solicitation use the full amount of $6000.00)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 5 |
| Each |
10-Year Inspections
10-Year Tank Inspections (per attached Performance Work Statement (PWS)) for the Base Year 29 Mar 2017 through 28 Mar 2018.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
CMR
Contractor Manpower Reporting per attached CMR instructions for the Base Year 29 Mar 2017 through 28 Mar 2018.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 30 |
| Each |
| OPTION |
| INSTALL OR REPLACE FLOAT GAUGE |
FFP
1001 INSTALL OR REPLACE FLOAT GAUGE (per attached Performance Work Statement (PWS)) for Option Year One (1) 29 Mar 2018 through 28 Mar 2019. Quantities are Estimates. (Note: for the solicitation offer use the amount $4800.00)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 30 |
| Each |
| OPTION |
| INSTALL OR REPLACE INTERSTITIAL GAUGES |
FFP
1002 INSTALL OR REPALCE INTERSTITIAL FLOAT GAGE (per attached Performance Work Statement (PWS)) for Option Year One (1) 29 Mar 2018 through 28 Mar 2019. Quantities are Estimates. (Note: for the solicitation offer use the amount $4750.00)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 30 |
| Each |
| OPTION |
| INSTALL OR REPLACE OVERFILL VALVE |
FFP
1003 INSTALL OR REPLACE OVERFILL VALVE (per attached Performance Work Statement (PWS)) for Option Year One (1) 29 Mar 2018 through 28 Mar 2019. Quantities are Estimates. (Note: for the solicitation offer use the amount $21,000.00)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 20 |
| Each |
| OPTION |
| INSTALL OR REPLACE OVERFILL ALARM |
FFP
1004 INSTALL OR REPLACE OVERFILL ALARM (per attached Performance Work Statement (PWS)) for Option Year One (1) 29 Mar 2018 through 28 Mar 2019. Quantities are Estimates. (Note: for the solicitation offer use the amount $7500.00)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 40 |
| Each |
| OPTION |
| INSTALL OR REPLACE SPILL BUCKET |
FFP
1005 INSTALL OR REPLACE SPILL BUCKET (per attached Performance Work Statement (PWS)) for Option Year One (1) 29 Mar 2018 through 28 Mar 2019. Quantities are Estimates. (Note: for the solicitation offer use the amount $12,750.00)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 2 |
| Each |
| OPTION |
| INSTALL OR REPLACE LEAK DETECT MONITOR |
FFP
1006 INSTALL OR REPLACE LEAK DETECT MONITOR (per attached Performance Work Statement (PWS)) for Option Year One (1) 29 Mar 2018 through 28 Mar 2019. Quantities are Estimates. (Note: for the solicitation offer use the amount $3200.00)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 168 |
| Each |
| OPTION |
| MONTHLY UST INSPECTIONS |
FFP
1007 MONTHLY UNDERGROUND STORAGE TANK INSPECTIONS (per attached Performance Work Statement (PWS)) for Option Year One (1) 29 Mar 2018 through 28 Mar 2019
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1,680 |
| Each |
| OPTION |
| MONTHLY AST INSPECTIONS |
FFP
1008 MONTHLY ABOVEGROUND STORAGE TANK INSPECTIONS (per attached Performance Work Statement (PWS)) for Option Year One (1) 29 Mar 2018 through 28 Mar 2019
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 154 |
| Each |
| OPTION |
| REPLACE TANK LABELS |
FFP
1009 REPLACE TANK LABELS (per attached Performance Work Statement (PWS)) for Option Year One (1) 29 Mar 2018 through 28 Mar 2019. Quantities are Estimates.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 10 |
| Each |
| OPTION |
| REPAINT TANKS |
FFP
1010 REPAINT TANKS (per attached Performance Work Statement (PWS)) for Option Year One (1) 29 Mar 2018 through 28 Mar 2019. Quantities are Estimates.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 15 |
| Each |
| OPTION |
| PERFORM PRESSURE TESTING |
FFP
1011 PERFORM PRESSURE TESTING (per attached Performance Work Statement (PWS)) for Option Year One (1) 29 Mar 2018 through 28 Mar 2019. Quantities are Estimates.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Each |
| OPTION |
| UNSCHEDULED UST INSPECTIONS |
FFP
1012 UNSCHEDULED UNDERGROUND STORAGE TANK INSPECTIONS (per attached Performance Work Statement (PWS)) for Option Year One (1) 29 Mar 2018 through 28 Mar 2019. Quantities are Estimates.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 36 |
| Each |
| OPTION |
| UNSCHEDULED AST INSPECTIONS |
FFP
1013 UNSCHEDULED ABOVEGROUND STORAGE TANK INSPECTIONS (per attached Performance Work Statement (PWS)) for Option Year One (1) 29 Mar 2018 through 28 Mar 2019. Quantities are Estimates.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 300 |
| Each |
| OPTION |
| CLEAN SPILL BUCKET |
FFP
1014 CLEAN SPILL BUCKET (per attached Performance Work Statement (PWS)) for Option Year One (1) 29 Mar 2018 through 28 Mar 2019. Quantities are Estimates.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 30 |
| Hours |
| OPTION |
| MINOR REPAIR (SPOT PAINT, PLUMBING) |
FFP
1015 MINOR REPAIR (SPOT PAINT, PLUMBING) (per attached Performance Work Statement (PWS)) for Option Year One (1) 29 Mar 2018 through 28 Mar 2019. Quantities are Estimates.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 30 |
| Hours |
| OPTION |
| REPAIR ELECTRONICS |
FFP
1016 REPAIR ELECTRONICS (per attached Performance Work Statement (PWS)) for Option Year One (1) 29 Mar 2018 through 28 Mar 2019. Quantities are Estimates.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 30 |
| Hours |
| OPTION |
| REPAIR PLUMBING |
FFP
1017 REPAIR PLUMBING (per attached Performance Work Statement (PWS)) for Option Year One (1) 29 Mar 2018 through 28 Mar 2019. Quantities are Estimates.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 2 |
| Each |
| OPTION |
| AFTER HOURS RESPONSE |
FFP
1018 AFTER HOURS RESPONSE (per attached Performance Work Statement (PWS)) for Option Year One (1) 29 Mar 2018 through 28 Mar 2019. Quantities are Estimates.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Job |
| OPTION |
| PARTS FOR REPAIRS |
FFP
1019 PARTS FOR REPAIRS (per attached Performance Work Statement (PWS)) for Option Year One (1) 29 Mar 2018 through 28 Mar 2019. Estimated at $6400.00. (in response to solicitation use the full amount of $6400.00)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 5 |
| Each |
| OPTION |
| 10-Year Inspections |
FFP
1020 10-Year Inspections. (per attached Performance Work Statement (PWS)) for Option Year One (1) 29 Mar 2018 through 28 Mar 2019.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
| OPTION |
| CMR |
FFP
1021Contractor Manpower Reporting per attached CMR instructions for Option Year One (1) 29 Mar 2018 through 28 Mar 2019
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 30 |
| Each |
| OPTION |
| INSTALL OR REPLACE FLOAT GAUGE |
FFP
2001 INSTALL OR REPLACE FLOAT GAUGE (per attached Performance Work Statement (PWS)) for Option Year Two (2) 29 Mar 2019 through 28 Mar 2020. Quantities are Estimates. (Note: for the solicitation offer use the amount $4,750.00)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 30 |
| Each |
| OPTION |
| INSTALL OR REPLACE INTERSTITIAL GAUGES |
FFP
2002 INSTALL OR REPLACE INTERSTITIAL FLOAT GAGE (per attached Performance Work Statement (PWS)) for Option Year Two (2) 29 Mar 2019 through 28 Mar 2020. Quantities are Estimates. (Note: for the solicitation offer use the amount $5000.00)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 30 |
| Each |
| OPTION |
| INSTALL OR REPLACE OVERFILL VALVE |
FFP
2003 INSTALL OR REPLACE OVERFILL VALVE (per attached Performance Work Statement (PWS)) for Option Year Two (2) 29 Mar 2019 through 28 Mar 2020. Quantities are Estimates. (Note: for the solicitation offer use the amount $21,000.00)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 20 |
| Each |
| OPTION |
| INSTALL OR REPLACE OVERFILL ALARM |
FFP
2004 INSTALL OR REPALCE OVERFILL ALARM (per attached Performance Work Statement (PWS)) for Option Year Two (2) 29 Mar 2019 through 28 Mar 2020. Quantities are Estimates. (Note: for the solicitation offer use the amount $7500.00)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 40 |
| Each |
| OPTION |
| INSTALL OR REPLACE SPILL BUCKET |
FFP
2005 INSTALL OR REPLACE SPILL BUCKET (per attached Performance Work Statement (PWS)) for Option Year Two (2) 29 Mar 2019 through 28 Mar 2020. Quantities are Estimates. (Note: for the solicitation offer use the amount $13,000.00)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 2 |
| Each |
| OPTION |
| INSTALL OR REPLACE LEAK DETECT MONITOR |
FFP
2006 INSTAL OR REPALCE LEAK DETECT MONITOR (per attached Performance Work Statement (PWS)) for Option Year Two (2) 29 Mar 2019 through 28 Mar 2020. Quantities are Estimates. (Note: for the solicitation offer use the amount $3500.00)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 168 |
| Each |
| OPTION |
| MONTHLY UST INSPECTIONS |
FFP
2007 MONTHLY UNDERGROUND STORAGE TANK INSPECTIONS (per attached Performance Work Statement (PWS)) for Option Year Two (2) 29 Mar 2019 through 28 Mar 2020.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1,680 |
| Each |
| OPTION |
| MONTHLY AST INSPECTIONS |
FFP
2008 MONTHLY ABOVEGROUND STORAGE TANK INSPECTIONS (per attached Performance Work Statement (PWS)) for Option Year Two (2) 29 Mar 2019 through 28 Mar 2020.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 154 |
| Each |
| OPTION |
| REPLACE TANK LABELS |
FFP
2009 REPLACE TANK LABELS (per attached Performance Work Statement (PWS)) for Option Year Two (2) 29 Mar 2019 through 28 Mar 2020. Quantities are Estimates.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 10 |
| Each |
| OPTION |
| REPAINT TANKS |
FFP
2010 REPAINT TANKS (per attached Performance Work Statement (PWS)) for Option Year Two (2) 29 Mar 2019 through 28 Mar 2020. Quantities are Estimates.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 15 |
| Each |
| OPTION |
| PERFORM PRESSURE TESTING |
FFP
2011 PERFORM PRESSURE TESTING (per attached Performance Work Statement (PWS)) for Option Year Two (2) 29 Mar 2019 through 28 Mar 2020. Quantities are Estimates.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Each |
| OPTION |
| UNSCHEDULED UST INSPECTIONS |
FFP
2012 UNSCHEDULED UNDERGROUND STORAGE TANK INSPECTIONS (per attached Performance Work Statement (PWS)) for Option Year Two (2) 29 Mar 2019 through 28 Mar 2020. Quantities are Estimates.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 36 |
| Each |
| OPTION |
| UNSCHEDULED AST INSPECTIONS |
FFP
2013 UNSCHEDULED ABOVEGROUND STORAGE TANK INSPECTIONS (per attached Performance Work Statement (PWS)) for Option Year Two (2) 29 Mar 2019 through 28 Mar 2020. Quantities are Estimates.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 300 |
| Each |
| OPTION |
| CLEAN SPILL BUCKET |
FFP
2014 CLEAN SPILL BUCKET (per attached Performance Work Statement (PWS)) for Option Year Two (2) 29 Mar 2019 through 28 Mar 2020. Quantities are Estimates.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 30 |
| Hours |
| OPTION |
| MINOR REPAIR (SPOT PAINT, PLUMBING) |
FFP
2015 MINOR REPAIR (SPOT PAINT, PLUMBING) (per attached Performance Work Statement (PWS)) for Option Year Two (2) 29 Mar 2019 through 28 Mar 2020. Quantities are Estimates.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 30 |
| Hours |
| OPTION |
| REPAIR ELECTRONICS |
FFP
2016 REPAIR ELECTRONICS (per attached Performance Work Statement (PWS)) for Option Year Two (2) 29 Mar 2019 through 28 Mar 2020. Quantities are Estimates.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 30 |
| Hours |
| OPTION |
| REPAIR PLUMBING |
FFP
2017 REPAIR PLUMBING (per attached Performance Work Statement (PWS)) for Option Year Two (2) 29 Mar 2019 through 28 Mar 2020. Quantities are Estimates.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 2 |
| Each |
| OPTION |
| AFTER HOURS RESPONSE |
FFP
2018 AFTER HOURS RESPONSE (per attached Performance Work Statement (PWS)) for Option Year Two (2) 29 Mar 2019 through 28 Mar 2020. Quantities are Estimates.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Job |
| OPTION |
| PARTS FOR REPAIRS |
FFP
2019 PARTS FOR REPAIRS (per attached Performance Work Statement (PWS)) for Option Year Two (2) 29 Mar 2019 through 28 Mar 2020. Estimated at $6500.00. (in response to solicitation use the full amount of $6500.00)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 5 |
| Each |
| OPTION |
| 10-Year Inspections |
FFP
2020 10-Year Inspections. (per attached Performance Work Statement (PWS)) for Option Year Two (2) 29 Mar 2019 through 28 Mar 2020.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
| OPTION |
| CMR |
FFP
2021 Contractor Manpower Reporting per attached CMR instructions for Option Year Two (2) 29 Mar 2019 through 28 Mar 2020.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 30 |
| Each |
| OPTION |
| INSTALL OR REPLACE FLOAT GAUGE |
FFP
3001 INSTALL OR REPLACE FLOAT GAUGE (per attached Performance Work Statement (PWS)) for Option Year Three (3) 29 Mar 2020 through 28 Mar 2021. Quantities are Estimates. (Note: for the solicitation offer use the amount $5000.00)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 30 |
| Each |
| OPTION |
| INSTALL OR REPLACE INTERSTITIAL GAUGES |
FFP
3002 INSTALL OR REPLACE INTERSTITIAL FLOAT GAGE (per attached Performance Work Statement (PWS)) for Option Year Three (3) 29 Mar 2020 through 28 Mar 2021. Quantities are Estimates. (Note: for the solicitation offer use the amount $5000.00)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 30 |
| Each |
| OPTION |
| INSTALL OR REPLACE OVERFILL VALVE |
FFP
3003 INSTALL OR REPLACE OVERFILL VALVE (per attached Performance Work Statement (PWS)) for Option Year Three (3) 29 Mar 2020 through 28 Mar 2021. Quantities are Estimates. (Note: for the solicitation offer use the amount $21,500.00)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 20 |
| Each |
| OPTION |
| INSTALL OR REPLACE OVERFILL ALARM |
FFP
3004 INSTALL OR REPLACE OVERFILL ALARM (per attached Performance Work Statement (PWS)) for Option Year Three (3) 29 Mar 2020 through 28 Mar 2021. Quantities are Estimates. (Note: for the solicitation offer use the amount $8000.00)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 40 |
| Each |
| OPTION |
| INSTALL OR REPLACE SPILL BUCKET |
FFP
3005 INSTALL OR REPLACE SPILL BUCKET (per attached Performance Work Statement (PWS)) for Option Year Three (3) 29 Mar 2020 through 28 Mar 2021. Quantities are Estimates. (Note: for the solicitation offer use the amount $13,500.00)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 2 |
| Each |
| OPTION |
| INSTALL OR REPLACE LEAK DETECT MONITOR |
FFP
3006 INSTALL OR REPLACE LEAK DETECT MONITOR (per attached Performance Work Statement (PWS)) for Option Year Three (3) 29 Mar 2020 through 28 Mar 2021. Quantities are Estimates. (Note: for the solicitation offer use the amount $3500.00)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 168 |
| Each |
| OPTION |
| MONTHLY UST INSPECTIONS |
FFP
3007 MONTHLY UNDERGROUND STORAGE TANK INSPECTIONS (per attached Performance Work Statement (PWS)) for Option Year Three (3) 29 Mar 2020 through 28 Mar 2021.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1,680 |
| Each |
| OPTION |
| MONTHLY AST INSPECTIONS |
FFP
3008 MONTHLY ABOVEGROUND STORAGE TANK INSPECTIONS (per attached Performance Work Statement (PWS)) for Option Year Three (3) 29 Mar 2020 through 28 Mar 2021.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 154 |
| Each |
| OPTION |
| REPLACE TANK LABELS |
FFP
3009 REPLACE TANK LABELS (per attached Performance Work Statement (PWS)) for Option Year Three (3) 29 Mar 2020 through 28 Mar 2021. Quantities are Estimates.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 10 |
| Each |
| OPTION |
| REPAINT TANKS |
FFP
3010 REPAINT TANKS (per attached Performance Work Statement (PWS)) for Option Year Three (3) 29 Mar 2020 through 28 Mar 2021. Quantities are Estimates.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 15 |
| Each |
| OPTION |
| PERFORM PRESSURE TESTING |
FFP
3011 PERFORM PRESSURE TESTING (per attached Performance Work Statement (PWS)) for Option Year Three (3) 29 Mar 2020 through 28 Mar 2021. Quantities are Estimates.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Each |
| OPTION |
| UNSCHEDULED UST INSPECTIONS |
FFP
3012 UNSCHEDULED UNDERGROUND STORAGE TANK INSPECTIONS (per attached Performance Work Statement (PWS)) for Option Year Three (3) 29 Mar 2020 through 28 Mar 2021. Quantities are Estimates.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 36 |
| Each |
| OPTION |
| UNSCHEDULED AST INSPECTIONS |
FFP
3013 UNSCHEDULED ABOVEGROUND STORAGE TANK INSPECTIONS (per attached Performance Work Statement (PWS)) for Option Year Three (3) 29 Mar 2020 through 28 Mar 2021. Quantities are Estimates.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 300 |
| Each |
| OPTION |
| CLEAN SPILL BUCKET |
FFP
3014 CLEAN SPILL BUCKET (per attached Performance Work Statement (PWS)) for Option Year Three (3) 29 Mar 2020 through 28 Mar 2021. Quantities are Estimates.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 30 |
| Hours |
| OPTION |
| MINOR REPAIR (SPOT PAINT, PLUMBING) |
FFP
3015 MINOR REPAIR (SPOT PAINT, PLUMBING) (per attached Performance Work Statement (PWS)) for Option Year Three (3) 29 Mar 2020 through 28 Mar 2021. Quantities are Estimates.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 30 |
| Hours |
| OPTION |
| REPAIR ELECTRONICS |
FFP
3016 REPAIR ELECTRONICS (per attached Performance Work Statement (PWS)) for Option Year Three (3) 29 Mar 2020 through 28 Mar 2021. Quantities are Estimates.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 30 |
| Hours |
| OPTION |
| REPAIR PLUMBING |
FFP
3017 REPAIR PLUMBING (per attached Performance Work Statement (PWS)) for Option Year Three (3) 29 Mar 2020 through 28 Mar 2021. Quantities are Estimates.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 2 |
| Each |
| OPTION |
| AFTER HOURS RESPONSE |
FFP
3018 AFTER HOURS RESPONSE (per attached Performance Work Statement (PWS)) for Option Year Three (3) 29 Mar 2020 through 28 Mar 2021. Quantities are Estimates.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Job |
| OPTION |
| PARTS FOR REPAIRS |
FFP
3019 PARTS FOR REPAIRS (per attached Performance Work Statement (PWS)) for Option Year Three (3) 29 Mar 2020 through 28 Mar 2021. Estimated at $6600.00. (in response to solicitation use the full amount of $6600.00)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 5 |
| Each |
| OPTION |
| 10-Year Inspections |
FFP
3020 10-Year Inspections. (per attached Performance Work Statement (PWS)) for Option Year Three (3) 29 Mar 2020 through 28 Mar 2021.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
| OPTION |
| CMR |
FFP
3021 Contractor Manpower Reporting per attached CMR instructions for Option Year Three (3) 29 Mar 2020 through 28 Mar 2021.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 30 |
| Each |
| OPTION |
| INSTALL OR REPLACE FLOAT GAUGE |
FFP
4001 INSTALL OR REPLACE FLOAT GAUGE (per attached Performance Work Statement (PWS)) for Option Year Four (4) 29 Mar 2021 through 28 Mar 2022. Quantities are Estimates. (Note: for the solicitation offer use the amount $5,000.00)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 30 |
| Each |
| OPTION |
| INSTALL OR REPLACE INTERSTITIAL GAUGES |
FFP
4002 INSTALL OR REPLACE INTERSTITIAL FLOAT GAGE (per attached Performance Work Statement (PWS)) for Option Year Four (4) 29 Mar 2021 through 28 Mar 2022. Quantities are Estimates. (Note: for the solicitation offer use the amount $5,000.00)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 30 |
| Each |
| OPTION |
| INSTALL OR REPLACE OVERFILL VALVE |
FFP
4003 INSTALL OR REPLACE OVERFILL VALVE (per attached Performance Work Statement (PWS)) for Option Year Four (4) 29 Mar 2021 through 28 Mar 2022. Quantities are Estimates. (Note: for the solicitation offer use the amount $22,000.00)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 20 |
| Each |
| OPTION |
| INSTALL OR REPLACE OVERFILL ALARM |
FFP
4004 INSTALL OR REPLACE OVERFILL ALARM (per attached Performance Work Statement (PWS)) for Option Year Four (4) 29 Mar 2021 through 28 Mar 2022. Quantities are Estimates. (Note: for the solicitation offer use the amount $8000.00)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 40 |
| Each |
| OPTION |
| INSTALL OR REPLACE SPILL BUCKET |
FFP
4005 INSTALL OR REPLACE SPILL BUCKET (per attached Performance Work Statement (PWS)) for Option Year Four (4) 29 Mar 2021 through 28 Mar 2022.Quantities are Estimates. (Note: for the solicitation offer use the amount $13,500.00)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 2 |
| Each |
| OPTION |
| INSTALL OR REPLACE LEAK DETECT MONITOR |
FFP
4006 INSTALL OR REPLACE LEAK DETECT MONITOR (per attached Performance Work Statement (PWS)) for Option Year Four (4) 29 Mar 2021 through 28 Mar 2022. Quantities are Estimates. (Note: for the solicitation offer use the amount $4000.00)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 168 |
| Each |
| OPTION |
| MONTHLY UST INSPECTIONS |
FFP
4007 MONTHLY UNDERGROUND STORAGE TANK INSPECTIONS (per attached Performance Work Statement (PWS)) for Option Year Four (4) 29 Mar 2021 through 28 Mar 2022.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1,680 |
| Each |
| OPTION |
| MONTHLY AST INSPECTIONS |
FFP
4008 MONTHLY ABOVEGROUND STORAGE TANK INSPECTIONS (per attached Performance Work Statement (PWS)) for Option Year Four (4) 29 Mar 2021 through 28 Mar 2022.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 154 |
| Each |
| OPTION |
| REPLACE TANK LABELS |
FFP
4009 REPLACE TANK LABELS (per attached Performance Work Statement (PWS)) for Option Year Four (4) 29 Mar 2021 through 28 Mar 2022. Quantities are Estimates.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 10 |
| Each |
| OPTION |
| REPAINT TANKS |
FFP
4010 REPAINT TANKS (per attached Performance Work Statement (PWS)) for Option Year Four (4) 29 Mar 2021 through 28 Mar 2022. Quantities are Estimates.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 15 |
| Each |
| OPTION |
| PERFORM PRESSURE TESTING |
FFP
4011 PERFORM PRESSURE TESTING (per attached Performance Work Statement (PWS)) for Option Year Four (4) 29 Mar 2021 through 28 Mar 2022. Quantities are Estimates.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Each |
| OPTION |
| UNSCHEDULED UST INSPECTIONS |
FFP
4012 UNSCHEDULED UNDERGROUND STORAGE TANK INSPECTIONS (per attached Performance Work Statement (PWS)) for Option Year Four (4) 29 Mar 2021 through 28 Mar 2022. Quantities are Estimates.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 36 |
| Each |
| OPTION |
| UNSCHEDULED AST INSPECTIONS |
FFP
4013 UNSCHEDULED ABOVEGROUND STORAGE TANK INSPECTIONS (per attached Performance Work Statement (PWS)) for Option Year Four (4) 29 Mar 2021 through 28 Mar 2022. Quantities are Estimates.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 300 |
| Each |
| OPTION |
| CLEAN SPILL BUCKET |
FFP
4014 CLEAN SPILL BUCKET (per attached Performance Work Statement (PWS)) for Option Year Four (4) 29 Mar 2021 through 28 Mar 2022. Quantities are Estimates.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 30 |
| Hours |
| OPTION |
| MINOR REPAIR (SPOT PAINT, PLUMBING) |
FFP
4015 MINOR REPAIR (SPOT PAINT, PLUMBING) (per attached Performance Work Statement (PWS)) for Option Year Four (4) 29 Mar 2021 through 28 Mar 2022. Quantities are Estimates.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 30 |
| Hours |
| OPTION |
| REPAIR ELECTRONICS |
FFP
4016 REPAIR ELECTRONICS (per attached Performance Work Statement (PWS)) for Option Year Four (4) 29 Mar 2021 through 28 Mar 2022. Quantities are Estimates.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 30 |
| Hours |
| OPTION |
| REPAIR PLUMBING |
FFP
4017 REPAIR PLUMBING (per attached Performance Work Statement (PWS)) for Option Year Four (4) 29 Mar 2021 through 28 Mar 2022. Quantities are Estimates.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 2 |
| Each |
| OPTION |
| AFTER HOURS RESPONSE |
FFP
4018 AFTER HOURS RESPONSE (per attached Performance Work Statement (PWS)) for Option Year Four (4) 29 Mar 2021 through 28 Mar 2022. Quantities are Estimates.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Job |
| OPTION |
| PARTS FOR REPAIRS |
FFP
4019 PARTS FOR REPAIRS (per attached Performance Work Statement (PWS)) for Option Year Four (4) 29 Mar 2021 through 28 Mar 2022. Estimated at $6700.00. (in response to solicitation use the full amount of $6700.00)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 5 |
| Each |
| OPTION |
| 10-Year Inspections |
FFP
4020 10-Year Inspections. (per attached Performance Work Statement (PWS)) for Option Year Four (4) 29 Mar 2021 through 28 Mar 2022.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
| OPTION |
| CMR |
FFP
4021 Contractor Manpower Reporting per attached CMR instructions for Option Year Four (4) 29 Mar 2021 through 28 Mar 2022
NET AMT
REQUEST FOR INFORMATION II
Request for Information (RFI) II For
W911SD-16-T-0258
01 Feb, 2017 Question 1: Please provide details on sizes of spill buckets to be provided in item # 0005 (i.e. 5 gal, 7gal,15 gal) Is it possible to provide separate line items for spill buckets that are be installed on AST or UST's?.
Answer 1: Spill buckets are to be 5 gallons. Spill buckets are for AST only. All USTs have spill bucket already.
Question 2: Please provide details on type of float gauge to be installed per bid item #0001.Is it possible to provide separate bid line items for AST and UST gauge installation?
Answer 2: Float gauge to be installed need to be solid glass top gauge, similar as Krueger Sentry Gauge Solid Glass Top gauge
Question 3: Please provide details on type of interstitial gauges to be installed per bid item# 0002. Is it possible to provide separate bid line items for AST and UST gauge installation?
Answer 3: Interstitial gauge to be installed need to be solid glass top gauge, similar as Krueger Sentry Gauge Solid Glass Top gauge
Question 4: Please provide details on overfill valves to be installed per bid item #0003.
Answer 4: Overfill valves need to be automatic shutoff valves.
Question 5: Are these valves to be installed in both AST and UST tanks? If so is it possible to provide separate bid line items for valves to be installed on each of the separate tanks?
Answer 5: For the UST shutoff valve, it need to be compatible with gravity fill to the tank. Quantity of shutoff valves for UST is 5, for AST is 25.
Question 6: Please provide details on leak detection monitors listed in bid item#0006 to be replaced (i.e. 1 or 2 tank system) and are monitors to include liquid level monitoring/inventory controls?
Answer 6: Leak detection monitors are for liquid level monitoring. Veeder-Root or OMNTEC are required for leak detection monitors.
Question 7: For installation of new leak detection monitoring system listed in bid item # 0006 is the contractor required to install new conduits? In all new leak detection installation locations does required conduit exist?
Answer 7: No new conduit is required to be installed for new leak detection monitoring system. Yes. For all new leak detection installation location, the required conduit exist.
Question 8: Can you please let me know if we are permitted to have a general contractor that we performed work as a sub for at a federal project submit a past performance questionnaire to you on our behalf. We were not clear as to whether questionnaire could only be submitted by a government representative. If you have any questions or need any additional information please feel free to contact me.
Answer 8: The past performance can be filled out by any prior customer, civilian or government or a prime that you subbed for. You send them the information, they fill it out and send it the email on the form. We should have them here to evaluate along with your offer.
Question 9: In PWS Section 5. Maintenance and Inspection Items. General: Please confirm that "10-year re-certifications" are excluded from this solicitation. There is not enough information available to provide this cost. Pricing can be provided as the need arises through the contract performance.
Answer 9: Believe the 10-year re-certification referred to here is for propane tanks, not related to this contract. (and not to be confused with the 10-year inspections, which are a separate line item).
Question 10: PWS Section 5.1.2 Snow and Debris Cleanup. Please confirm that the snow & debris removal is intended to facilitate the outlined inspections only and there is no intent to have the snow & debris cleared as its own stand-alone activity.
Answer 10: Yes, snow and debris removal is for tank inspection purpose only.
Question 11: PWS Section 6.Indefinite Quantity Services Tasks (Type II). 6.1 Troubleshoot and repair Electronic Monitors and Alarms. Requirements allude to a "trip charge". Should this just be included in the unit cost and eliminated from separate charge?
Answer 11: Yes, this should be included in the total charge of parts, labor and overhead + profit. Trip charge should be eliminated.
Question 12: PWS Section 6.Indefinite Quantity Services Tasks (Type II). Please confirm that the limit of this activity is at the equipment only and does not include electrical diagnosis and/or repairs.
Answer 12: Yes, this activity is for diagnosing and repairing monitoring equipment only.
Question 13: PWS Section 6.Indefinite Quantity Services Tasks (Type II). Please define "contractor's invoice". Are we to not include the cost for parts?
Answer 13: The contractor's invoice should include the charge of parts, labor and overhead + profit.
Question 14: PWS Section 6.2 Replace Electronic Leak Detection Monitors. Please confirm that the limit of this activity is at the equipment only and does not include electrical diagnosis and/or repairs. IPT has this capability if the need arises.
Answer 14: Yes, this activity is for replacing electronic leak detection monitoring equipment only.
Question 15: PWS Section 6.7 Install or Replace Spill Buckets. Please confirm that this scope is for ASTs, USTs or both.
Answer 15: Install or replace spill buckets in this scope is for ASTs only.
Question 16: PWS Section 6.8 Spot Painting. Replace defective parts cannot be returned to COR, please confirm.
Answer 16: Yes, for spot painting, defective parts are not to be returned to COR. However, the removed old paint need to be properly disposed.
Question 17: PWS Section 6.9 Minor Plumbing. Please confirm that this scope will include / exclude various valves.
Answer 17: For minor plumbing, the various valves are included in this scope.
Question 18: PWS Section 6.13 Replace Defective Tank Gauges. Requirements allude to a "trip charge". Should this just be included in the unit cost and eliminated from separate charge?
Answer 18: Yes, this should be included in the total charge of parts, labor and overhead + profit. Trip charge should be eliminated.
Question 19: Please define "contractor's invoice". Are we to not include the cost for parts?
Answer 19: The contractor's invoice should include the charge of parts, labor and overhead + profit.
REQUEST FOR INFORMATION
Request for Information (RFI) For
W911SD-16-T-0258
26 Jan, 2017
Question 1: In reference to "6.1 Troubleshoot and Repair Electronic Monitors and Alarms. Contractor will be paid at the hourly rate plus trip charge. Parts will be reimbursed per contractor's invoice plus reasonable profit. Replaced defective parts will be returned to COR." However CLIN 0016 is just a line item. Do you want a trip charge plus hourly rate? Or Do you want an estimate for what we think MICC - West Point might need for the year, similar for all repair CLINS?
Answer 1: Use trip charge plus hourly rate for these line items.
Question 2: The Solicitation calls for part 613 and 614, but it looks like there is only a part 613 now. Based on this revision, please verify that the Performance Work Statement will be performed under part 613.
Answer 2: Yes, Performance work statement will be performed under part 613.
Question 3: Reference to January 24, 2017 Pre-Bid Walk-Though: Is attendance at site visit mandatory for SDVOSB firms who intend to submit bid for this project?
Answer 3: Attendance to the Site Visit is not mandatory but highly recommended.
Question 4: Reference FAR 52.212-2 Evaluation – Commercial Items: Bidders Qualifications:
Referenced cite notes that, to receive an “acceptable rating”, quoter must show “proof” that they:
· Are authorized” by OMINTEK, as well as VEEDER ROOT, to service their monitoring systems
· Have a current inspection certificate of American Petroleum Institute API 653 or STI SP001 AST systems inspection certificate
· Possess current New York State UST Class A operator’s certificate for all inspectors
· Are certified by the Society of Protective Coating in tank surface preparation, protective coating and painting.
Please confirm that such “proofs” are required to confirm that the “quoter” itself possesses these qualifications, and not a third party and that evidence of same is to be submitted with the bid.
Answer 4: The holder of these qualifications should be whoever is actually performing the work.
Follow-on to #4: If the quoter does not have a current/active certification the proof of previous certification and evidence of recertification scheduled will be sufficient.
Question 5: Reference Bid Sheets ITEM NO 001 Through 006 (and related subsequent year items)- Gages, Valves, Spill Buckets, Alarms and Monitors: Please provide manufacturer & model # of typical device to be used as a standard for bid purposes, with assumption that significantly less or greater costing devices would be subject to negotiation for credit or extra at conclusion of each contract year.
Answer 5: Everything is to be replaced in kind and must meet the tank requirements. A set amount is now identified for line item referenced and this amounts can used for the offer.
Question 6: Reference to Bid Sheets 007 & 008 and Table 1. “Tanks to be inspected”:
a. If available, please provide site tank location plan.
b. Please provide size (gallons) of each AST.
c. Table 1. count appears to show 15 UST’s and 137 AST’s which equates to 180 and 1,644 total yearly inspections at one each per month, whereas Bid Items 007 &008 (and related subsequent year items) list a total of 168 UST and 1,680 AST inspections. Please Clarify
d. Table 1. Lists tank #’s 912A, B & C and 1950A, B & C, which all have a “TMP” location. Please confirm there are a total of six tanks to be inspected.
Answer 6: a. Maps w/locations will be provided with award. b. – d. This information is now available on the updated list of tanks.
Question 7: Reference to section 5 Maintenance and Inspection Items; 5.1.2 Snow and Debris Cleanup:
Referenced subparagraph notes requirement to clear tank, manhole, vents, etc., as well as surrounding area within 5’ radius of same of snow, leaves, etc. Please confirm that such “clearing” of is only as necessary for inspection purposes at the time of the inspection and does not include clearing of normal vehicle and/or pedestrian access.
Answer 7: Clean-up/snow removal should be during the time of inspection only and not for the general public or anytime outside of their inspection. But note that snow and or debris will/may not normally be cleaned away by any other identity prior to their inspection so the snow, ice and debris may be there for days when they arrive.
Question 8: Is key access required to access any of the tank locations? If so, who will provide?
Answer 8: Yes and the keys will be made available, from the COR, after award.
Question 9: Are escorts required to access any tank locations?
Answer 9: No.
Question 10: Do any of the tanks require a 10-year inspection?
Answer 10: Yes, a new line item has been added to include potential need for 10-year inspections.
Question 11. What type of tanks are located at Camp Buckner?
Answer 11: Only small tanks and generator tanks, all are above ground storage tanks.
Question 12: Do you have to be a U.S. Citizen to work on the Garrison grounds?
Answer 12: No, anyone that is legally authorized to work in the United States can work on the United States Army Garrison – West Point.
Question 13: Are any of the underground tanks co-located?
Answer 13: No, not for the tanks to be inspected for this requirement.
Question 14: Are work hours limited in anyway?
Answer 14: As stated in the PWS 1.4 Contractor shall perform all services during normal duty hours (8:00 a.m.- 4:00 p.m.), Monday through Friday, excluding Federal Holidays. Note: Under severe weather conditions (Code Red/White) civilian employees may not be available. (i.e. COR)
Question 15: Is OSHA training required?
Answer 15: Not specifically for this requirement.
Question 16: Is a Quality Control required to be submitted with the offer?
Answer 16: A basic outline of the plan is required with the offer. The full plan will be required AFTER award.
Question 17: Can a copy of the current Spill Prevention, Control & Countermeasures (SPCC) plan be provided?
Answer 17: A copy of the SPCC plans will be made available to the awarded company.
Question 18 - in the Performance Work Statement, under 1.5 PERSONNEL, 1.5.5 "Personnel shall be certified by the Society of Protective Coasting - sspc.org (SSPC) in tank surface preparation, protective coating and painting." *Are personnel certified by NACE International Institute (formerly National Association of Corrosion Engineers), acceptable? Copies of certifications would be included for review and authentication.
Answer 18: Yes the NACE is an acceptable alternative to SSPC. (Please reference this in the cover sheet)
Question 19: - Under Instructions for Submittal, #2.c. "Offer totals for:
i. Base Year Amount.
ii. 1st Option Year Amount.
iii. 2nd Option Year Amount.
iv. 3rd Option Year Amount.
v. 4th Option Year Amount.
vi. Total Combined Offer Amount.
*Is this the only area in which you want the pricing listed or do you also want the SF 1449 and Continuation Pages with the itemized pricing included in the RFP submission?
Answer 19: The base and option totals are just for the cover sheet. All the line items on the 1449 need to be filled in.
INSTURCTIONS FOR SUBMITAL
Instructions for Submittal Petroleum Tank Maintenance
W911SD-16-T-0258
Updated 26 Jan, 2017 In order to be considered for the award:
PLEASE USE: W911SD-16-T-0258 v1 to respond to the solicitation. This version will contain all current changes as of 26 Jan, 2017.
1. A digital/electronic copy of the solicitation response shall be sent to the acquiring office email address: richard.j.williams156.civ@mail.mil ( Please put "Tank Maintenance" in the Subject Line). Hard copies are not required.
2. A cover letter shall be included along with the solicitation to include the following at a minimum:
a. Name of Company (or on Company Letterhead)
b. Solicitation number: W911SD-16-T-0258
c. Offer Totals for:
i. Base Year Amount.
ii. 1st Option Year Amount.
iii. 2nd Option Year Amount.
iv. 3rd Option Year Amount.
v. 4th Option year Amount.
vi. Total Combined Offer Amount.
d. Signature of Authorized Party
3. All technical certifications and/or evidence of Technical Capabilities as detailed in clause 52.212-2 (c) Factor 1 – Technical Factor, 1 – 7 shall be included in the solicitation offer. Offer without all seven factors will have an explanation of why not and/or expected time to have the missing factors on place.
4. Offerors will use the guidelines in attachment "Relevant Contracts" to report previous/current requirements that are similar in scope as this requirement. All reports must be completed and received along with the final response to this solicitation. If none, please submit one form stating so.
5. Send copies of attachment "Past Performance Questionnaire" to previous customers. Those customers will send the completed forms directly to the office address below via email. This offices contact email is included on the form and completed forms are required to be received no later than the date that the solicitation is due. Preference is to have three (3) previous customer send their responses.
Office Address and email:
MICC-West Point 681 Hardee Place 1st Floor Rm. 104 West Point, NY 10996 Attention: Richard J. Williams
Richard.j.williams156.civ@mail.mil
SITE VISIT
Site Visit for Petroleum Tank Maintenance
W911SD-16-T-0258
A site visit is scheduled for 1300, Tuesday 24 January, 2017.
All parties will meet at 681 Hardee Place, in the 1st floor Lobby, West Point, NY.
PRIOR to the site visit please contact Richard Williams with the number of personnel that will be attending. Richard can be contacted at: richard.j.williams156.civ@mail.mil or 845-938-8386 In the event of foul weather please call 845-938-7000 to ensure that West Point is Open or under a code condition. If the post is code RED at the time of the site visit then the alternative date will be used. If code WHITE please call 845-938-8386 to confirm the visit will take place.
If weather conditions eliminate the 24th then the ALTERNATIVE date will be 1300, Wednesday 25 January, 2017. THERE will only ONE site visit.
NOTE: All visitors to West Point MUST check in at the Visitor Center just outside Thayer Gate. Please allow time to check in prior to the site visit time.
PAST PERFORMANCE QUESTIONNAIRE
PAST PERFORMANCE QUESTIONNAIRE
Please return this completed questionnaire to:
richard.j.williams156.civ@mail.mil with W911SD-16-T-0258 in the subject heading. Thank You
WHEN FILLED IN THIS DOCUMENT IS SOURCE SELECTION SENSITIVE INFORMATION IAW FAR 3.104
SECTION 1: CONTRACT IDENTIFICATION
1. Contractor: _______________________________________________________________________________
1. Cage Code: _________________________________
1. Contract number: _______________________________________
1. Contract type: ______________________________
1. Was this a competitive contract? Yes _____ No _____
1. Period of performance: _________________________________________________________
1. Initial contract cost: $____________________________
1. Current/final contract cost: $_______________________________
1. Reasons for differences between initial contract cost and final contract costs:
1. Description of service provided: ______________________________________________________________
SECTION 2: CUSTOMER OR AGENCY IDENTIFICATION
1. Customer or agency name: _______________________________________________________________________________________
1. Customer or agency description (if applicable): _______________________________________________________________________________________
1. Geographic description of services under this contract, i.e. local, nationwide, worldwide, other Commands:
SECTION 3: EVALUATOR IDENTIFICATION
1. Evaluator's name: ______________________________________________________________________________________
1. Evaluator's title: ______________________________________________________________________________________
1. Evaluator's phone/fax number: ______________________________________________________________________________________
1. Number of years evaluator worked on subject contract:
SECTION 4: EVALUATION
Please indicate your satisfaction with the contractor’s performance by placing an “X” in the appropriate block using the scale provided to the right of each question. This scale is defined as follows:
CODE PERFORMANCE LEVEL
S SATISFACTORY – The contractor’s performance meets contractual requirements. The contractual performance contained some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
M MARGINAL – Performance does not meet some contractual requirements. The contractual performance reflects a serious problem for which the contractor has not yet identified corrective actions or the contractor’s proposed actions appear only marginally effective or were not fully implemented.
US UNSATISFACTORY – Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
NA NOT APPLICABLE - Unable to provide a score.
| Technical Performance |
| S |
| M |
| US |
| NA |
T1. Quality & repeatability of operations & maintenance.
T2. Quality of technical system testing and certification efforts
T3. Quality/integrity of technical data/report preparation efforts
T4. Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements
T5. Adequacy/effectiveness of environmental safety procedures
T6. Ability to implement current standard practices for computer hardware design, operation, maintenance, upgrades and configuration control
T7. Ability to implement current standard practices for computer software design, operation, maintenance, upgrades and configuration control
| Program Management |
| S |
| M |
| US |
| NA |
P1. Effectiveness of overall contract management (including ability to effectively lead, manage and control the program)
P2. Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes)
P3. Timeliness/effectiveness of contract problem resolution without extensive customer guidance
P4. Understand/complied with customer objectives and technical requirements
P5. Successfully responded to emergency and/or surge situations
P6. Quality/effectiveness of sub-contracted efforts
P7. Effectiveness of material management (including Government Furnished Property or Material)
P8. Effectiveness of acquisition management
P9. Contractor proposed alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the customer
P10. Contractor implemented responsive/flexible processes to improve quality and timeliness of support.
| Transition/phase-in |
| S |
| M |
| US |
| NA |
T1. Contractor ability to smoothly transition resources and personnel.
T2. Contractor effectiveness on maintaining continuity of mission support while…