W911SA23B2020 Amendment 1 - Vendor Questions.pdf
PDF 805 KB Posted
- Attached to
- W911SA23B2020 Repair/Replace Playground Fences
- Solicitation number
- W911SA23B2020
About this file
This document is an amendment to a solicitation providing answers to contractor questions regarding a federal contract opportunity to repair and replace playground fences at Fort McCoy for the Department of the Army Materiel Command Mission and Installation Contracting Command. The amendment specifies that fence replacement will be done in phases with closed playground areas, and that temporary fencing must follow specifications. It addresses questions on disposal of safety caps, repainting versus replacing posts, and acceptable options for sleeving or replacing posts with vinyl-coated posts secured by concrete bases rather than repainting original wood posts. The contracting officer approves sleeving or replacing posts with factory painted posts but not using vinyl coatings. The amendment clarifies that gate frames will be painted but chain link fencing will be vinyl-coated.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0011959623
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Answ ers to contractor's questions.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 15-Aug-2023
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W911SA23B2020
X 9B. DATED (SEE ITEM 11)
26-Jul-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
15-Aug-2023
CODE
MICC - FT MCCOY
BLDG 1108 SOUTH R ST
FORT MCCOY WI 54656-5153
W911SA 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W911SA23B2020
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00700 - CONTRACT CLAUSES
The following have been added by full text:
ANSWER CONTRACTOR'S QUESTION
Q.- Will temp fencing be required when replacing/repairing the fences? Will the fenced in areas be occupied?
A. – Fence replacement will be done in phase at each building, the actual playground being worked on will be closed to children until completed.
Q. - Would a snow fence be acceptable as temp fencing?
A. – Follow specification 01 10 10, 1.04, G.
Q. -Some of the current fencing has yellow corrugated safety top cap. Is this to be reinstalled or disposed of as part of the contract?
A. – Dispose as part of project.
Q. -Removing the current peeling paint and repainting the posts will not guarantee that the poles will not begin to peel again soon. There are other options for the posts that would include a 15-year warranty to ensure the owners investment in a new fence would not have peeling paint.
Option 1: Cut current posts off at the concrete and mount new vinyl coated posts with galvanized plates in the current locations. (see attached plated post details) A.- This will not be acceptable. No vinyl coat post and rails, no exposed threads on children side of fence.
Option 2: Cut mow strips back on each side of posts and replace the current posts with new vinyl coated posts secured with new concrete and new concrete mow strips placed around the new posts.
A.- This would be an acceptable option, except no coating vinyl on post, factory paint only. Bid accordingly.
Option 3: Sleeve the current posts with new vinyl coated posts. This would be placing a slightly larger post down over the current posts.
A.- This would be an acceptable option, except no coating vinyl on post, factory paint only. Bid accordingly.
-There is a discrepancy on the fence gates.
Spec 01 10 10 C. New Work 5 states:
‘Gates can be existing prepped and painted black or be replaced with new factory painted black’ Spec 32 31 13 1.01 A states:
‘Remove and install new vinyl coated chain link fabric, hardware, and gates as shown and specified’
Q.- Are the gates to be prepped and painted? Or are they to be replaced with new vinyl coated gates to ensure the paint will not peel in the future.
A.- The gate frames are to be painted, not vinyl. The Chain Link is to be vinyl coated.
Q.- Could I possibly suggest doing a sleeve post and then paint them
A- This would be an acceptable option, except no coating vinyl on post, factory paint only. Bid accordingly.
- I am getting quit high numbers for stripping and repainting the original posts for the fencing project at the Child development centers there on Ft. McCoy
The links below are suggestions to consider if you are able too.
W911SA23B2020
The original posts would be cut off at ground height and a base plate anchored into the existing concrete and then a vinyl coated post installed. The SOW now calls for the posts to be stripped and painted, I think the vinyl coated posts with ground plate anchors would last the longest.
1. https://www.safetysign.com/products/11169/2-38-round-post-surface-mount-base?s=skd9pyzsa1cnpq&gclid=CjwKCAjwt52mBhB5EiwA05YKozR80pVUrN7mt00- PQMwMh5xFrpnjGfzBy_Y1rG742_xDalFTD4gABoCiGcQAvD_BwE
2. https://chainlinkfittings.com/store/2-1-2-standard-floor-flange-w-2-set-screws.html?gclid=CjwKCAjwt52mBhB5EiwA05YKo67KqLxNI_IDBsj9lYP4eXA17ud6jFB7R04CCwDy mI2JabzsyGojSBoCXuoQAvD_BwE
3. https://chainlinkfittings.com/store/chain-link-2-1-2-fits-2-3-8-od-post-floor-flanges-pressed-steel-surface-mount-floor-flange-pressed-steel.html?gclid=CjwKCAjwt52mBhB5EiwA05YKo6N1PAzHjsmLr9_Vr6jeJDhOW3zBjU6OMJrS22f9 31JY2WyAxnZ2QRoCIusQAvD_BwE
These are 3 options I think you’ll find to be better for the longevity of the fencing there.
Q.- Please advise if this could be changed in the SOW or could be permitted to do instead of stripping and painting all the original posts.
A.- This will not be acceptable. No vinyl coat post and rails, no exposed threads on children side of fence.
(End of Summary of Changes)