Attachment 8 - Room Chart - Task and Frequency.xlsx

XLSX spreadsheet 67 KB Posted

Attached to
Custodial Services at IL079 Elwood, IL
Solicitation number
W911SA-22-Q-3111
Issued by

About this file

This document package includes room schedules and task and frequency charts for multiple buildings at IL079 in Elwood, Illinois. Custodial services are required for various flooring types including VCT tile, ceramic tile, carpet, concrete, and athletic flooring. Restrooms must be serviced two times per week with daily trash removal. Dusting, glass cleaning, and miscellaneous tasks are also specified. The related solicitation is for custodial services to be performed under contract number W911SA-22-Q-3111 by the Department of the Army Materiel Command Mission and Installation Contracting Command at Fort McCoy. The required services include daily, weekly, monthly, semi-annual, and annual cleaning tasks for buildings housing offices, training rooms, maintenance shops, armories, and other facility types totaling over 50,000 square feet.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1st-2nd JTA USARC Room Schedule

Room Schedule
USARC 20610 W. Arsenal Road, Elwood, IL 60421
FIRST FLOOR
ROOM #ROOM TYPEFLOOR TYPESF
100VESTIBULECERAMIC TILE107
101LOBBYCERAMIC TILE771
101AFACILITY STORAGEVCT TILENIC
102STAIR 'A'CERAMIC TILE194
103KITCHENQUARRY TILENIC
103ASCULLERYQUARRY TILENIC
103BKITCHEN OFFICEQUARRY TILE77
103CKITCHEN STORAGEQUARRY TILENIC
104CHAIR STORAGEVCT TILENIC
105ASSEMBLYVCT TILE2995
106FAMILY SUPPORTCARPET183
107RECRUITING/RETENTION OFFICECARPET224
108ELEVATOR ROOMCONCRETENIC
109CIRCULATIONVCT TILE1086
110PHYSICAL FITNESS ROOMATHLETIC FLOORING1666
111OFFICECARPET121
112WOMEN/SHOWERCERAMIC TILE493
113WOMENS LOCKERCERAMIC TILE506
114FACILITY STORAGE/ ITVCT TILENIC
115MENS LOCKERCERAMIC TILE1044
116MEN/SHOWERCERAMIC TILE782
117SUPPLY COMMON AREACARPET360
118OFFICECARPET113
119OFFICECARPET111
120TELEPHONE ROOMSTATIC RESISTANT TILENIC
121JANITOR STORAGECONCRETENIC
122FACILITY STORAGEVCT TILENIC
123ARMORERCONCRETENIC
124VAULTCONCRETENIC
125WEAPONS SIMULATOR ROOMVCT TILE1455
126WEAPONS SIMULATOR CONTROL RMVCT TILE134
127STORAGEVCT TILENIC
128UNIT STORAGECONCRETENIC
129TELEPHONE EQUIPMENT ROOMSTATIC RESISTANT TILENIC
130EFVCT TILENIC
131STAIR 'B'VCT TILE206
132VESTIBULEVCT TILE58
133SORTING AREAVCT TILENIC
134MAIL/SCREENING ROOMVCT TILENIC
135ELECTRICAL ROOMCONCRETENIC
136STAGING AREACONCRETENIC
137MECHANICAL ROOMCONCRETENIC
SECOND FLOOR
201LOBBYCERAMIC TILE853
202STAIR 'A'CERAMIC TILE199
202ACIRCULATIONVCT TILE703
203CLASSROOMCARPET2164
204OFFICECARPET120
205OFFICECARPET120
206OFFICECARPET167
207OFFICECARPET151
208OFFICECARPET121
209OFFICECARPET121
210OFFICECARPET121
211OFFICECARPET152
212OFFICECARPET120
213OFFICECARPET120
214OFFICECARPET120
215OFFICECARPET120
216OFFICECARPET120
217OFFICECARPET120
218OFFICECARPET120
219OFFICECARPET120
220OFFICECARPET120
221OFFICECARPET120
222OFFICECARPET120
223OFFICECARPET120
224OFFICECARPET152
225OFFICECARPET115
226OFFICECARPET115
227OFFICECARPET115
228TELEPHONE ROOMSTATIC RESISTANT TILENIC
229STAIR 'B'VCT TILE174
230OFFICECARPET120
231OFFICECARPET120
232BREAK ROOMVCT TILE197
233OFFICECARPET115
234OFFICECARPET120
235OFFICECARPET120
236UNIT COMMON AREACARPET3531
237UNIT COMMON AREACARPET3537
238OFFICECARPET120
239OFFICECARPET120
240OFFICECARPET200
241MENCERAMIC TILE355
242WOMENCERAMIC TILE358
243JANITOR CLOSETCONCRETENIC
244SIPRNETCARPETNIC
245LIBRARY STORAGEVCT TILENIC
246LIBRARYCARPET381
247CIRCULATIONVCT TILE137
248LEARNING CTRCARPET297
249TRAINING AIDSVCT TILENIC
250VENDING/RECVCT TILE105
251TELEPHONE ROOMSTATIC RESISTANT TILENIC
252ELECTRICAL ROOMVCT TILENIC
253MECHANICAL ROOMVCT TILENIC

Total SF 29722

JTA USARC T&F

Task and Frequency Chart V 1.6
IL079, U.S. Army Reserve Center, 20610 W. Arsenal Road, Elwood, IL 60421
V 1.6 (31 MAR 2021)
CUSTODIAL SERVICES SHALL BE PERFORMED IN ACCORDANCE WITH THE ATTACHED SPECIFICATIONS AND AT THE FREQUENCIES INDICATED BELOW.
TaskFrequencyScope of Work Paragraph
1. Floor Cleaning: VCT Tile8
Rooms: 105, 109, 131, 132, 202A, 2295,661 Sq. Ft.Item DescriptionQuantity
232, 247, 250Toilets14
a. Sweep/Dust Mop1xwkly;Monday5.2.5Urinals5
b. Damp Mop1xwkly;Monday5.2.6Sinks21
c. Spray Buff2x; Semi-annual - Apr/Oct5.2.12Utility Sinks1
d. Strip, wax, buff1x Annually - Apr5.2.9,5.2.10,5.2.11Showers16
e. Remove trash/recycling1xwkly;Monday5.2.3Soap Dispensers20
Paper Towel Dispensers20
2. Floor Cleaning: VCT TileWastebaskets145
Rooms: 125, 1261,589 Sq. Ft.Water Fountains4
a. Sweep/Dust Mop1xMonthly; After Drill5.2.5Windows98
b. Damp Mop1xMonthly; After Drill5.2.6Approximate number of Full-Time Employees36
c. Spray Buff2x; Semi-annual - Apr/Oct5.2.12Approximate number of Reservists Monthly
d. Strip, wax, buff1x Annually - Apr5.2.9,5.2.10,5.2.11
e. Remove trash/recycling1xMonthly; After Drill5.2.3
0
3. Floor Cleaning: Ceramic Tile2,124 Sq. Ft.
Room: 100, 101, 102, 201, 202
a. Sweep/Dust Mop1xwkly;Monday5.2.5
b. Damp Mop1xwkly;Monday5.2.6
c. Remove trash/recycling1xwkly;Monday5.2.3
4. Floor Cleaning: Quarry Tile77 Sq. Ft.
Room: 103B
a. Sweep/Dust Mop1xwkly;Monday5.2.5
b. Damp Mop1xwkly;Monday5.2.6
c. Remove trash/recycling1xwkly;Monday5.2.3
5. Floor Cleaning: Carpet
Room: 107, 111, 117, 118, 119, 204, 2057,315 Sq. Ft.
206, 207, 208, 209, 210, 211, 212, 213
214, 215, 216, 217, 231, 233, 237, 238,
239, 246
a. Vacuum1xwkly;Monday5.2.4, 5.2.7, 5.2.13
b. Shampoo1x Annually - Apr5.2.13, 5.2.14, 5.2.15
c. Remove trash/recycling1xwkly;Monday5.2.3
6. Floor Cleaning: Carpet
Room: 106, 203, 218, 219, 220, 221, 2227,752 Sq. Ft.
223, 224, 225, 226, 227, 230, 234, 235, 236
240, 248
a. Vacuum1xmonthly;Monday After Drill5.2.4, 5.2.7, 5.2.13
b. Shampoo1x Annually - Apr5.2.13, 5.2.14, 5.2.15
c. Remove trash/recycling1xmonthly;Monday After Drill5.2.3
7. Rest Room Cleaning
Rooms: 112, 113, 115, 116, 241, 2423,538 Sq. Ft.
a. Service restrooms2xwkly;Monday,Thursday5.2.24
b. Toilet bowls, urinals, washbowls, showers, mirrors2xwkly;Monday,Thursday5.2.25.1,5.2.25.2,5.2.25.5,5.2.25.6,5.2.26,5.2.27,5.2.28,5.2.29,5.2.30
c. Floor cleaning2xwkly;Monday,Thursday5.2.25.3, 5.2.8, 5.2.33
d. Cleaning walls, partitionsOne Time Monthly5.2.25.4
e. Remove trash/recycling2xwkly;Monday,Thursday5.2.3
8. Floor Cleaning: Athletic Flooring1,666 Sq. Ft.
Room: 110
a. Sweep/Dust Mop1xwkly;Monday5.2.5
b. Damp Mop1xwkly;Monday5.2.6
c. Remove trash/recycling1xwkly;Monday5.2.3
9. Dusting
All rooms scheduled to be cleaned
a. Low dustingOne Time Monthly5.2.19
b. High dusting2x; Semi-annual - Apr/Oct5.2.20
10. Glass Cleaning
All rooms scheduled to be cleaned
a. Interior windows1x Annually - Apr5.2.1
b. Exterior windows1x Annually - Apr5.2.2
c. Interior glassOne Time Monthly5.2.34
11. Miscellaneous Cleaning
All areas scheduled for cleaning
a. Fountains, sinks2xwkly;Monday,Thursday5.2.21, 5.2.26
b. Rugs, walk-off mats1xwkly;Monday5.2.7
c. Janitorial Closet1xwkly;Monday5.2.22
d. Entrances1x Monthly5.2.23
c. Janitorial Closet1xwkly;Monday5.2.22
d. Entrances1x Monthly5.2.23
e. Metal1x Monthly5.2.27, 5.2.28
f. Doors1x Monthly5.2.29
g. Spot Cleaning1x Monthly (or as required)5.2.4, 5.2.30

Total SF 29,722

&"Times New Roman,Bold"&11 &D &"Arial,Bold"&P

JTA OMS Room Schedule

Room Schedule
OMS 20610 W. Arsenal Road, Elwood, IL 60421
ROOM #ROOM TYPEFLOOR TYPESF
100VESTIBULEVCT TILE56
101CORRIDORVCT TILE154
102MECHANICAL ROOMCONCRETENIC
103ELECTRICAL ROOMCONCRETENIC
104TELEPHONE ROOMSTATIC RESISTANT TILENIC
105MEN'S ROOMCERAMIC TILE180
106WOMEN'S ROOMCERAMIC TILE180
107SHOP OFFICEVCT TILE323
108OFFICEVCT TILE107
109OFFICEVCT TILE107
110VESTIBULEVCT TILE60
111EQUIPMENT ALCOVECONCRETENIC
112TOOLS/PARTS STORAGECONCRETENIC
113STORAGECONCRETENIC
114CONTROLLED WASTECONCRETE/METALNIC
115FLAMMABLE STORAGECONCRETE/METALNIC
116MAINTENANCE BAYSCONCRETENIC

Total SF 1167

JTA OMS T&F

Task and Frequency Chart V 1.6
IL079 OMS, 20610 W. Arsenal Road, Elwood, IL 60421
V 1.6 (31 MAR 2021)
CUSTODIAL SERVICES SHALL BE PERFORMED IN ACCORDANCE WITH THE ATTACHED SPECIFICATIONS AND AT THE FREQUENCIES INDICATED BELOW.
TaskFrequencyScope of Work Paragraph
1. Floor Cleaning: VCT Tile
Rooms: 107323 Sq. Ft.
a. Sweep/Dust Mop1xwkly;Monday5.2.5
b. Damp Mop1xwkly;Monday5.2.6Item DescriptionQuantity
c. Spray Buff2x; Semi-annual - Apr/Oct5.2.12Toilets3
d. Strip, wax, buff1x Annually - Apr5.2.9,5.2.10,5.2.11Urinals1
e. Remove trash/recycling1xwkly;Monday5.2.3Sinks4
Utility Sinks1
c. Remove trash1xmonthly;Monday After Drill5.2.3Showers
Soap Dispensers
2. Floor Cleaning: VCT Tile484 Sq. Ft.Paper Towel Dispensers2
Rooms: 100, 101, 108, 109, 110Wastebaskets12
a. Sweep/Dust Mop1xmonthly; After Drill5.2.5Water Fountains2
b. Damp Mop1xmonthly; After Drill5.2.6Windows2
c. Spray Buff2x; Semi-annual - Apr5.2.20Approximate number of Full-Time Employees4
d. Strip, wax, buff1x Annually - Apr5.2.9,5.2.10,5.2.11Approximate number of Reservists Monthly
e. Remove trash/recycling1xmonthly; After Drill5.2.3
3. Rest Room Cleaning
Rooms: 105, 106360 Sq. Ft.
a. Service restrooms2xwkly;Monday,Thursday5.2.24
b. Toilet bowls, urinals, washbowls, showers, mirrors2xwkly;Monday,Thursday5.2.25.1,5.2.25.2,5.2.25.5,5.2.25.6,5.2.26,5.2.27,5.2.28,5.2.29,5.2.30
c. Floor cleaning2xwkly;Monday,Thursday5.2.25.3, 5.2.8, 5.2.33
d. Cleaning walls, partitionsOne Time Monthly5.2.25.4
e. Remove trash/recycling2xwkly;Monday,Thursday5.2.3
4. Dusting
All rooms scheduled to be cleaned
a. Low dustingOne Time Monthly5.2.19
b. High dusting2x; Semi-annual - Apr/Oct5.2.20
5. Glass Cleaning
All rooms scheduled to be cleaned
a. Interior windows1x Annually - Apr5.2.1
b. Exterior windows1x Annually - Apr5.2.2
c. Interior glassOne Time Monthly5.2.34
6. Miscellaneous Cleaning
All areas scheduled for cleaning
a. Fountains, sinks2xwkly;Monday,Thursday5.2.21,5.2.26
b. Rugs1xwkly;Monday5.2.7

Total SF 1,167

JTA TEMF Room Schedule

Room Schedule
TEMF 20610 S. Arsenal Road, Elwood, IL 60421
ROOM #ROOM TYPEFLOOR TYPESF
100TRAINING/BREAK ROOMVCT TILE1244
100AVESTIBULEVCT TILE41
101WOMEN'S LATRINECERAMIC TILE150
102WOMEN'S SHOWERS/LOCKERSCERAMIC TILE99
103MEN'S LATRINECERAMIC TILE185
104MEN'S LATRINECERAMIC TILE295
105JANITOR/RECYCLING CLOSETCONCRETENIC
106TELEPHONE ROOMSTATIC RESISTANCE TILENIC
107VESTIBULEVCT TILE48
108CORRIDORVCT TILE185
109VESTIBULEVCT TILE102
110OFFICEVCT TILE120
111OFFICEVCT TILE120
112OFFICEVCT TILE120
113OFFICEVCT TILE120
114COMMON AREA OFFICEVCT TILE1107
115CONSOLIDATED BENCHCONCRETENIC
116SMALL ARMS REPAIRCONCRETENIC
117WEAPONS VAULTCONCRETENIC
118SECURE STORAGECONCRETENIC
119TOOL ROOMCONCRETENIC
120ELECTRICAL ROOMCONCRETENIC
121MECHANICAL ROOMCONCRETENIC
122COMBAT SPARESCONCRETENIC
123FLUID DISTRIBUTIONCONCRETENIC
124MAINTENANCE PITCONCRETENIC
125CIRCULATION AISLECONCRETENIC
126AMAINTENANCE BAYSCONCRETENIC
126BMAINTENANCE BAYSCONCRETENIC
127AREPAIR BAYSCONCRETENIC
127BREPAIR BAYSCONCRETENIC
128BATTERY ROOMCONCRETENIC
201OVERHEAD EQUIPMENT PLATFORMGRATINGNIC

Total SF 3936

JTA TEMF T&F

Task and Frequency Chart V 1.6
IL079: TEMF, 20610 S. Arsenal Road, Elwood, IL 60421
V 1.6 (31 MAR 2021)
CUSTODIAL SERVICES SHALL BE PERFORMED IN ACCORDANCE WITH THE ATTACHED SPECIFICATIONS AND AT THE FREQUENCIES INDICATED BELOW.
TaskFrequencyScope of Work Paragraph
1. Floor Cleaning: VCT Tile
Rooms: 100, 110, 111, 112, 113, 1142,831 Sq. Ft.
a. Sweep/Dust Mop1xwkly;Monday5.2.5Item DescriptionQuantity
b. Damp Mop1xwkly;Monday5.2.6Toilets4
c. Spray Buff2x; Semi-annual -Apr/Oct5.2.12Urinals1
d. Strip, wax, buff1x Annually - Apr5.2.9,5.2.10,5.2.11Sinks4
e.Remove trash/recycling1xwkly;Monday5.2.3Utility Sinks1
Showers4
2. Floor Cleaning: VCT Tile376 Sq. Ft.Soap Dispensers4
Rooms: 100A, 107, 108, 109Paper Towel Dispensers4
a. Sweep/Dust Mop1xmonthly; After Drill5.2.5Wastebaskets32
b. Damp Mop1xmonthly; After Drill5.2.6Water Fountains1
c. Spray Buff2x; Semi-annual - Apr/Oct5.2.12Windows9
d. Strip, wax, buff1x Annually - Apr5.2.9,5.2.10,5.2.11
e. Remove trash/recycling1xmonthly; After Drill5.2.3
3. Rest Room Cleaning729 Sq. Ft.
Rooms: 101, 102, 103, 104
a. Service restrooms2xwkly;Monday,Thursday5.2.24
b. Toilet bowls, urinals, washbowls, showers, mirrors2xwkly;Monday,Thursday5.2.25.1,5.2.25.2,5.2.25.5,5.2.25.6,5.2.26,5.2.27,5.2.28,5.2.29,5.2.30
c. Floor cleaning2xwkly;Monday,Thursday5.2.25.3, 5.2.8, 5.2.33
d. Cleaning walls, partitionsOne Time Monthly5.2.25.4
e. Remove trash/recycling2xwkly;Monday,Thursday5.2.3
4. Dusting
All rooms scheduled to be cleaned
a. Low dustingOne Time Monthly5.2.19
b. High dusting2x; Semi-annual - Apr/Oct5.2.20
5. Glass Cleaning
All rooms scheduled to be cleaned
a. Interior windows1x Annually - Apr5.2.1
b. Exterior windows1x Annually - Apr5.2.2
c. Interior glassOne Time Monthly5.2.34
6. Miscellaneous Cleaning
All areas scheduled for cleaning
a. Fountains, sinks2xwkly;Monday,Thursday5.2.21, 5.2.26
b. Rugs1xwkly;Monday5.2.7

Total SF 3,936

JTA BLDG 001 Rooms

Room Schedule
BLDG JTA 20610 S. Arsenal Road, Elwood, IL 60421
ROOM #ROOM TYPEFLOOR TYPESF
Building JT001
101LobbyVinyl Tile368
102Range Control OfficeVinyl Tile384
103Range Control OfficeVinyl Tile360
103aBreak RoomVinyl Tile360
104Area Operations Facility SpecVinyl Tile264
105Conference RoomVinyl Tile716
106HallwayVinyl Tile300
1073 Bay AreaNOT IN CONTRACTNIC
108Mechanical RoomNOT IN CONTRACTNIC
109Janitors ClosetNOT IN CONTRACTNIC
110FLW Storage AreaNOT IN CONTRACTNIC
111FLW Bay AreaNOT IN CONTRACTNIC
112FLW Bay AreaNOT IN CONTRACTNIC
113Men's Changing AreaVinyl Tile45
114Men's Locker RoomVinyl Tile71
115Men's ShowersVinyl Tile52
116Men's LatrineCeramic Tile121
117Women's LatrineCeramic Tile64
118FLW Maintenance TeamVinyl Tile200
119HallwayVinyl Tile184
120Server RoomNOT IN CONTRACTNIC
121Range ControlNOT IN CONTRACTNIC
122VestibuleVinyl Tile132
123Battery RoomNOT IN CONTRACTNIC
124COE officeCarpet154
125COE officeCarpet284

TOTAL SF BLDG 001 4059

JTA BLDG 001 T&F

Task and Frequency Chart V 1.6
IL079 JT001, 20610 S. Arsenal Road, Elwood, IL 60421
V 1.6 (31 MAR 2021)
CUSTODIAL SERVICES SHALL BE PERFORMED IN ACCORDANCE WITH THE ATTACHED SPECIFICATIONS AND AT THE FREQUENCIES INDICATED BELOW.
TaskFrequencyScope of Work ParagraphItem DescriptionQuantity
1. Floor Cleaning: Vinyl Tile3,268 Sq. Ft.Toilets3
Rooms: 101, 102, 103, 103a, 104, 105, 106, 118, 119, 122Urinals1
a. Sweep/Dust Mop1xwkly;Monday5.2.5Sinks2
b. Damp Mop1xwkly;Monday5.2.6Utility Sinks
c. Spray Buff2x; Semi-annual - Apr/Oct5.2.12Showers2
d. Strip, wax, buff1x Annually - Apr5.2.9,5.2.10,5.2.11Soap Dispensers
e. Remove trash/recycling1xwkly;Monday5.2.3Paper Towel Dispensers2
Wastebaskets13
2. Floor Cleaning: CarpetWater Fountains1
Room: 124, 125438 Sq. Ft.Windows21
214, 215, 216, 217, 231, 233, 237, 238,Approximate number of Full-Time Employees8
239, 240, 246
a. Vacuum1xwkly;Monday5.2.4, 5.2.7, 5.2.13
b. Shampoo1x Annually - Apr5.2.13, 5.2.14, 5.2.15
c. Remove trash/recycling1xwkly;Monday5.2.3
3. Rest Room Cleaning
Rooms: 113, 114, 115, 116, 117353 Sq. Ft.
a. Service restrooms1xwkly;Monday5.2.24
b. Toilet bowls, urinals, washbowls, showers, mirrors1xwkly;Monday5.2.25.1,5.2.25.2,5.2.25.5,5.2.25.6,5.2.26,5.2.27,5.2.28,5.2.29,5.2.30
c. Floor cleaning1xwkly;Monday5.2.25.3, 5.2.8, 5.2.33
d. Cleaning walls, partitionsOne Time Monthly5.2.25.4
e. Remove trash/recycling1xwkly;Monday5.2.3
4. Dusting
All rooms scheduled to be cleaned
a. Low dustingOne Time Monthly5.2.19
b. High dusting2x; Semi-annual - Apr/Oct5.2.20
5. Glass Cleaning
All rooms scheduled to be cleaned
a. Interior windows1x Annually - Apr5.2.1
b. Exterior windows1x Annually - Apr5.2.2
c. Interior glassOne Time Monthly5.2.34
6. Miscellaneous Cleaning
All areas scheduled for cleaning
a. Fountains, sinks1xwkly;Monday5.2.21, 5.2.26
b. Rugs1xwkly;Monday5.2.7

Total SF 4,059

JTA BLDG 004 Rooms

Room Schedule
JTA BLDG 4, 20610 S. Arsenal Road, Elwood, IL 60421
ROOM #ROOM TYPEFLOOR TYPESF
1Range Control OfficeVinyl Tile495
2Mechanical RoomNOT IN CONTRACTNIC
3LatrineVinyl Tile90
4Utility RoomNOT IN CONTRACTNIC
5BreakroomVinyl Tile210
6Biologist OfficeVinyl Tile435
7DOD PolicemanNOT IN CONTRACTNIC

TOTAL SF BLDG 004 1230

JTA BLDG 004 T&F

Task and Frequency Chart V 1.6
IL079, JT004, 20610 S. Arsenal Road, Elwood, IL 60421
V 1.6 (31 MAR 2021)
TaskFrequencyScope of Work Paragraph
1. Floor Cleaning: Vinyl Tile1,140 Sq. Ft.
Rooms: 1, 5, 6
a. Sweep/Dust Mop1xwkly;Monday5.2.5
b. Damp Mop1xwkly;Monday5.2.6
c. Spray Buff2x; Semi-annual - Apr/Oct5.2.12Item DescriptionQuantity
d. Strip, wax, buff1x Annually - Apr5.2.9,5.2.10,5.2.11Toilets1
e. Remove trash/recycling1xwkly;Monday5.2.3Urinals0
Sinks1
2. Rest Room Cleaning90 Sq. Ft.Utility Sinks0
Rooms: 3Showers0
a. Service restrooms1xwkly;Monday5.2.24Soap Dispensers1
b. Toilet bowls, urinals, washbowls, showers, mirrors1xwkly;Monday5.2.25.1,5.2.25.2,5.2.25.5,5.2.25.6,5.2.26,5.2.27,5.2.28,5.2.29,5.2.30Paper Towel Dispensers1
c. Floor cleaning1xwkly;Monday5.2.25.3, 5.2.8, 5.2.33Wastebaskets3
d. Cleaning walls, partitionsOne Time Monthly5.2.25.4Water Fountains0
e. Remove trash/recycling1xwkly;Monday5.2.3Windows10
3. Dusting
All rooms scheduled to be cleaned
a. Low dustingOne Time Monthly5.2.19
b. High dusting2x; Semi-annual - Apr/Oct5.2.20
4. Glass Cleaning
All rooms scheduled to be cleaned
a. Interior windows1x Annually - Apr5.2.1
b. Interior glassOne Time Monthly5.2.34
5. Miscellaneous Cleaning
All areas scheduled for cleaning
a. Rugs, walk-off mats1xwkly;Monday5.2.7
b. Janitorial Closet1xwkly;Monday5.2.22
c. Entrances1x Monthly5.2.23
d. Metal1x Monthly5.2.27, 5.2.28
e. Doors1x Monthly5.2.29
f. Spot Cleaning1x Monthly (or as required)5.2.4, 5.2.30

Total SF 1,230

File details come from the government source that posted it. Updated .