TE_1_PRS_15_Jan_2016.pdf
PDF 15 KB Posted
- Attached to
- YTC Dust Control Services Federal contract opportunity
- Solicitation number
- W911S8-15-B-0005
About this file
Technical Exhibit 1
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W911S8-15-B-0005-0002.pdf | ||
| W911S8-15-B-0005_Dust_Control_PWS_10_Feb_16_Ver_2.3.pdf | ||
| W911S8-15-B-0005_Dust_Control_PWS_5_Feb_16_Ver_2_2.pdf | ||
| W911S8-15-B-0005-0001.pdf | ||
| Response_to_Vendor_Questions.pdf | ||
| W911S8-15-B-0005.pdf | ||
| TE_5_Map_of_YTC_Entry_Point.pdf | ||
| TE_3_Map_of_Water_Supply_Points.pdf | ||
| W911S8-15-B-0005_Dust_Control_PWS_6_Jan_16_Ver_2_1.pdf | ||
| TE_2_Deliverables_Schedule_Ver_2_1.pdf | ||
| TE_4_Siber_Stake.pdf | ||
| TE_8_Map_of_Range_Operations_and_POL_Treatment_Areas.pdf | ||
| TE_7_Map_of_Roads_and_Tank_Trail_Treatment_Areas.pdf | ||
| TE_6_Map_of_Heliport_Treatment_Areas.pdf | ||
| WD_05_Jan_2016.docx | DOCX document |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
7.1. Technical Exhibit 1: Performance Requirements Summary
Performance Requirements Summary
Required Service Performance Standard
Maximum Allowable Degree of Deviation from
Requirement
Method of Surveillance
Frequency of Surveillance
Para 5.1.2 Dust Control at Airfield
Maintain minimal amount of Foreign Object Debris (FOD); clear visibility from a ground member to the helicopter pilot at a distance of 100 feet. The visibility must be to where the pilot can clearly see ground commands from ground support personnel.
+/- 10 ft
All work will be performed to a minimum performance threshold of 100%.
Scheduled Inspection
Monthly
Para 5.2.2 Dust Control on Roads and Tank Trails and Range Operations Areas
Having clear visibility of a leading vehicle by a trailing vehicle with 100 feet separation, traveling at a speed of 25 mph.
+/- 10 ft minimum performance threshold of 90%.
Scheduled Inspection
Monthly
Para 5.3.
Contractor Manpower Reporting
Annual Contractor Manpower Reporting due by 31 Oct each calendar year.
0% minimum performance threshold of 90%.
Scheduled Inspection
Annual
Performance Requirements Summary
File details come from the government source that posted it. Updated .