Questions & Answers W911S2-16-T-3001
**Please note the change in where the quotes shall be submitted to** Email them to derek.m.marriott.civ@mail.mil
1.6.10 – Operations Security Level I Training – Is this an online course my employees can access and complete?
Answer – Yes, as stated in the paragraph, use the following link http://cdsetrain.dtic.mil/opsec/ . No changes to the PWS.
1.6.11 – Antiterrorism Level I – I is this an online course my employees can access and complete?
Answer – Yes, as stated in the paragraph, use the following link https://jkodirect.jten.mil/Atlas2/faces/page/login/Login.seam . Choose Non-CAC users Contractors w/o JKO accounts at bottom of screen. No changes to the PWS.
1.6.17 – Threat Awareness and Reporting Program – Is this an online course my employees can access and complete?
Answer – Believe you meant to reference paragraph 1.6.16. Yes, here is the link http://cdsetrain.dtic.mil/itawareness/ The PWS has been revised.
1.7.3 – Is the handout referenced here available on Fort Drum?
Answer – Yes and can also be accessed using the following link http://www.drum.army.mil/PublicWorks/Documents/Forms/DispForm.aspx?ID=47 . The PWS has been revised.
1.13 – States within a 100 mile radius of Fort Drum, NY. Why did it change from “within the borders of Jefferson, Lewis, Oswego and St Lawrence County (New York State)”? Those are the four counties for the work performance of Fort Drum.
Answer - Edit: 1.13 - This was changed in error and should state the following: CONTRACTOR’S WAREHOUSE FACILITY (IES): The contractor shall, during the course of performance of this contract maintain a warehouse facility within the borders of Jefferson, Lewis, Oswego, or St. Lawrence County (New York State). The PWS has been revised.
3.3.1 – Are tri-wall containers included here? It is referencing only wooden containers, crates and metal shipping boxes.
Answer – Yes, this includes all GOCs. Definitions are located in Appendix G-4 of the DTR Government-Owned Containers. Government-Owned Containers (GOC) include all exterior wooden shipping containers purchased by the Government or constructed by the contractor for services under a contract. GOCs include containers meeting the requirements of American Society for Testing and Materials (ASTM) D4169-01, Standard Practice for Performance Testing of Shipping Containers and Systems, ASTM D5118/D5118M-95, Standard Practice for Fabrication of Fiberboard Shipping Boxes, ASTM D6251/D6251M-01, Standard Specification for Wood-Cleated Panelboard Shipping Boxes, and Military Surface Deployment and Distribution Command Pamphlet 55-12. GOCs include all wooden exterior-shipping containers purchased by the Government and received by the contractor awarded those services identified in Schedule II, Inbound Services. No Changes to the PWS.
mailto:derek.m.marriott.civ@mail.mil http://cdsetrain.dtic.mil/opsec/ https://jkodirect.jten.mil/Atlas2/faces/page/login/Login.seam http://cdsetrain.dtic.mil/itawareness/ http://www.drum.army.mil/PublicWorks/Documents/Forms/DispForm.aspx?ID=47
5.4.1 – Weighing. Manually typed weight ticket s will not be accepted. I am confused as to how we are expected to get individual weights on each shipment when these shipments are done in bulk per truck. It is unknown which size crate is going to be used until we get to residence. So say we have 2 standard crates, 2 – ½ crates and 2 – ¼ crates loaded on our truck, which we load based on our phone surveys with each shipper. We do not know which of these crates will be used for each shipment until we get to residence and see exactly what is being packed. So how do we get a computerized light weight for a shipment if we do not know what crate is being used until we arrive?
Answer - When the pre-move survey is done, you should be able to determine the crate size. If there is an issue and the crate is the wrong size 5.5.7 and 5.7.1.6 can be approved. No changes to the PWS.
5.4.7 – Fort outside Continental United States (OCONUS) activities, excluding Hawaii and Alaska, shipments are payable on the actual weight shipped. These should be billed on the weight basis of 100-pound minimum for UB and 500-pound minimum for HHG.
Answer - The wording came straight from the DTR Part IV Appendix G. No Changes to the PWS.
5.5.1 – The contractor shall be available to receive orders between the hours of 8:00 AM and 5:00 PM. This should be 8:00 AM and 4:00 pm.
Answer - The wording for and times came straight from the DTR Part IV Appendix G. No Changes to the PWS.
5.5.1 – The contractor shall provide information as to whether the service will be performed in the A.M. (8:00 to 12:00) or in the P.M. (12:01 to 5:00). This should be 4:00 pm.
Answer - The wording for and times came straight from the DTR Part IV Appendix G. No Changes to the PWS.
5.5.2 – The contractor shall not begin pickup and delivery services at an owner’s residence before 8:00 AM or after 5:00 PM. This should be 4:00 PM.
Answer - The wording for and times came straight from the DTR Part IV Appendix G. No changes to the
PWS.
5.5.2 – The contractor will not begin any service that will not allow completion by 9:00 PM without prior approval given by the ordering officer and the member/employee by 4:30 PM. This should be
3:30 PM.
Answer - The wording for and times came straight from the DTR Part IV Appendix G. No changes to the
PWS.
5.6.1 – It is the Contractor’s responsibility to coordinate with the COR the container size and configuration for each mode of shipment prior to packing containers. Does this mean we cannot pack anything without talking to COR first???
Answer - The wording came straight from the DTR Part IV Appendix G. No changes to the PWS.
5.6.3.5.1 – “At the option of the service member, either upright or flat wardrobe cartons shall be used in containerized international codes of service (codes 4, 5, 6, and T). These are not DPM modes of travel – not sure why they are referenced in this paragraph.
Answer - 5.6.3.5.1. Upright Wardrobes has been revised to state the following: New upright wardrobes shall be used for local drayage shipments. At the option of the service member, either upright or flat wardrobe cartons shall be used in international shipments, if the member expresses no preference, the Contractor may select the type of wardrobe used. Empty hangers shall be removed, wrapped, and packed in a separate carton. No items shall be placed in bottom of wardrobes. The PWS has been revised.
5.6.5.7 – Need clarification as to whether we take boats less than 14 feet in length or over 14 feet in length and who is actually responsible for the cost of materials and crating.
Answer – Yes, for less than 14 feet. Over 14 feet, yes only if it is less than 500 lbs. If specialty crating is required, the Government will need a cost estimate of the crating before it is complete and the Government will decide if the customer is responsible for reimbursement. The charges will be IAW the item number for Oversize Containers. The PWS has been revised.
5.7.2 – Duplicate of 5.7.1.7?
5.7.3 – Duplicate of 5.7.1.7?
5.7.4 – Duplicate of 5.7.1.9?
Answer – This was an error. This duplicate wording in paragraphs 5.7.1.7 and 5.7.1.9 has been removed.
Please note, that although these duplicates were deleted, the paragraph numbers still exist due to the automatic numbering in the word document. So they still exist, but with different requirements.
5.7.4.1 – The contactor shall prepare a packing list at the time the goods are packed, noting the number of each piece, the weight and cubic measurement. Are we supposed to get weights of each item as we are packing???
Answer - The wording came straight from the DTR Part IV Appendix G. No changes to the PWS.
5.9.2 – All repairs shall be done prior to delivery to residence. Paragraph 5.9.1.1 states outside patches are unacceptable. We cannot perform coopering on a crate from the inside if it has not been delivered and emptied??
Answer - The wording came straight from the DTR Part IV Appendix G. No changes to the PWS.
5.9.7 – Same as above – coopering cannot be done until shipments have been delivered.
Answer - The wording came straight from the DTR Part IV Appendix G. No changes to the PWS.
5.9.8.1 – All old markings shall be obliterated prior to delivery to the residence. We cannot remove the markings until shipment has been delivered - shipments can be cancelled after they are loaded onto our trucks.
Answer – 5.9.8.1. has been revised to state: Permanent markings on containers conforming to ASTM- D4169 and SDDC Pam 55-12 shall be as listed below. In obliterating old shipment markings from these containers and preparing the surface for remarking, permanent markings shall not be removed. All old shipment markings not applicable to the current shipment shall be obliterated prior to delivery to the residence. If the permanent markings are removed or are illegible, the following permanent markings shall be stenciled or painted (see Attachment 1, Figures 3) in black letters 1-1/2 inches high. The PWS has been revised.
5.12.2.1 – The contractor shall complete information – the PPSO fills in all the information.
Answer - It is the Contactor’s responsibility by regulation. No changes to the PWS.
5.12.2.3 – The contractor shall complete information – the PPSO fills in all the information.
Answer - It is the Contactor’s responsibility by regulation. No changes to the PWS.
Which verbiage do I use when figuring my pricing: Do I go from the Performance Work Statement or the Detailed Pricing sheets? There are differences on some of them.
Here is one example of the difference in the two: Overflow Articles: 5.9.9.2 Overflow Containers – shall be limited to one per shipment. Detailed pricing sheet states – one or more of these containers may be required per shipment. Which am I using to determine my prices?? This will make a difference in how we price as to which one we are using.
Answer – The verbiage in the Detailed Pricing Schedule has been updated to match the PWS.
Why is there no Detailed Pricing for Schedule 0?
Answer - Reference 5.4.9. which states The pricing for Schedule 0 shall be the same as Schedule III.
Although the tasks are identical, each Schedule is funded from a separate account classification. Schedule 0 has been added to the Detailed Pricing Schedule.