Amended_Exhibit_A_-_Detailed_Pricing_Exhibit_(Final_16Dec2015).xls
XLS spreadsheet 230 KB Posted
- Attached to
- Packing and Crating Services - Fort Drum, NY
- Solicitation number
- W911S2-16-T-3001
About this file
Exhibit A - Detailed Pricing Exhibit (Amended 16Dec2015)
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUMMARY
| (Reference Defense Transportation Regulation - Part IV, Personal Property) | |||||
| W911S2-16-T-3001 | |||||
| The quantities shown by area of performance for each item in this solicitation are the Government's estimates of requirements, | |||||
| which may be ordered during the period of the contract. | |||||
| The Government's estimated maximum daily requirements, excluding Saturday, Sunday, National, State, and local holidays are | |||||
| listed below by area of performance within each schedule. Bidders must complete the "Bidder's Guaranteed Daily Capability", which | |||||
| must equal or exceed the Government's minimum acceptable daily capability, for all items within an area of performance for which | |||||
| they submit bids. Failure to do so must render the bid non responsive. | |||||
| Contractor Capacity is the total capacity of the offeror to provide pick-up and/or delivery of personal property, as measured in NCWT, | |||||
| which the offeror must assure is available to meet Government requirements during one working day, between the hours of 0800-1700, before | |||||
| being committed to non-Government requirements. | |||||
| Government's Est. Maximum | Gov. Minimum | Bidder's Guaranteed | |||
| Daily Requirement | Acceptable Daily Capability | Daily Capability | |||
| OUTBOUND | NCWT | NCWT | NCWT | ||
| (Schedule I) | 250 | 200 | |||
| INBOUND | NCWT | NCWT | NCWT | ||
| (Schedule II) | 250 | 200 | |||
| INTRA-CITY AREA | NCWT | NCWT | NCWT | ||
| (Schedule III) | 700 | 500 | |||
| INTRA-CITY AREA | NCWT | NCWT | NCWT | ||
| (Schedule 0) | 250 | 200 |
&C&"Times New Roman,Bold"&20SUMMARY of DPM SHCEDULE I, II, & III
BASE PERIOD SCHEDULE I
| Item 0001. Complete Service - Outbound (HHG). Services must include premove survey, servicing of appliances, disassembly of furniture, packaging, inventorying, | ||||||
| tagging, wrapping, padding, packing and bracing of household goods in Government-owned and furnished shipping containers (Shipping Container Commercial | ||||||
| Spec ASTM-D4169-01, SDDC Pamphlet 55-12) at member's/employee's residence, or at contractor's facility when ordered by the Contracting Officer (KO), and drayage | ||||||
| of the container within an area or performance. Service must also include loading of shipments on line-haul carrier's equipment at the contractor's facility. When | ||||||
| containers must not accommodate all articles of any one lot, loose articles must be packed in the said containers before any over-packed articles are placed therein. | ||||||
| Overflow, oversize and other shipments must be paid for under Item 0003. | ||||||
| Est. Annual Qty | Unit | Unit Price | TOTAL | |||
| 0001A. At member/employee residence: | 4500 | NCWT | ||||
| Container, Commercial Spec ASTM-D4169-001, or | ||||||
| SDDC Pam. 55-12 | ||||||
| 0001B. At contractors Facility: | 25 | NCWT | ||||
| Container, Commercial Spec ASTM-D4169-01, or | ||||||
| SDDC Pam. 55-12 | ||||||
| Item 0002. Outbound (HHG From Nontemporary Storage). Service must be the same as Item 0001 above except that: (a) HHG must be picked up at a nontemporary | ||||||
| storage facility and transported to contractor's facility; or (b) HHG must be delivered to contractor's facility; and (c) premove survey, servicing of appliances, | ||||||
| preliminary packing and accessorial services must not be provided. Overflow articles requiring containerization must be paid for under Item 0003. | ||||||
| Est. Annual Qty | Unit | Unit Price | TOTAL | |||
| 0002A. Pickup by Contractor: Container, Commercial | 25 | NCWT | ||||
| Container, Commercial Spec ASTM-D4169-001, or SDDC Pam. 55-12 | ||||||
| 0002B. Delivered to contractor: | 250 | NCWT | ||||
| Container, Commercial Spec ASTM-D4169-01, or SDDC Pam. 55-12 | ||||||
| Item 0003. Complete Service-Outbound (HHG-Overflow Articles and HHG Shipments requiring other than ASTM-D4169-01 or SDDC Pam. 55-12 Containers). | ||||||
| Service must be the same as Item 0001 or Item 0002 except that loose articles are drayed to contractor's facility when ordered by the Contracting Officer for | ||||||
| containerization in Government-furnished or contractor-furnished containers. Overflow, other shipments, and oversize containers must be constructed IAW | ||||||
| ASTM-D6251. Each container must be caulked during assembly. Overflow boxes and other shipments that normally require a lesser size box than specified in | ||||||
| ASTM-D4169-01or SDDC Pam. 55-12 and oversized containers are always of a greater size than specified in Commercial Spec ASTM-D4169-01 or SDDS Pam. 55-12. One or | ||||||
| more oversize containers may be required per shipment. Overflow containers shall be limited to one per shipment. Price bid for Item 0003 includes container plus weight of its contents. | ||||||
| Est. Annual Qty | Unit | Unit Price | TOTAL | |||
| 0003A. Government-Furnished Containers: Overflow Articles. | 25 | NCWT | ||||
| 0003A1. Government-Furnished Containers: Oversize Articles | 25 | NCWT | ||||
| 0003B. Contractor-Furnished Containers: Overflow Articles. | 50 | NCWT | ||||
| Item 0003 Cont. | ||||||
| 0003B1. Contractor-Furnished Containers: Oversize Articles | 25 | NCWT | ||||
| Item 0004. Complete Service-Outbound (UNACCCOMPANIED BAGGAGE) | ||||||
| Service includes packaging; inventorying; packing in Government approved containers; weighing; strapping; obliteration of old markings; marking; and loading shipments on | ||||||
| the line-haul carrier's equipment. Service shall be performed at owner's residence. (Service may be performed at contractor's facility when ordered by the Contracting Officer.) | ||||||
| Drayage, if required, will be ordered by the Contracting Officer. | ||||||
| Est. Annual Qty | Unit | Unit Price | TOTAL | |||
| 0004A. Government‑Furnished Containers Drayage Included | 25 | NCWT | ||||
| 0004B. Government‑Furnished Containers Drayage Not Included | 25 | NCWT | ||||
| 0004C. Contractor‑Furnished Containers Drayage Included | 750 | NCWT | ||||
| 0004D. Contractor‑Furnished Containers Drayage Not Included | 25 | NCWT | ||||
| Item 0005. Complete Service ‑ Outbound (Unaccompanied Baggage from Nontemporary Storage). Service must be the same as Item 0004 except that | ||||||
| (a) unaccompanied baggage must be picked up at a nontemporary storage facility and transported to contractor's facility; or (b)unaccompanied baggage must be | ||||||
| delivered to contractor's facility; and (c) servicing of appliances, preliminary packing and accessorial services must not be provided. | ||||||
| Est. Annual Qty | Unit | Unit Price | TOTAL | |||
| 0005A. Government‑Furnished Containers: Drayage Included | 25 | NCWT | ||||
| 0005A1. Government‑Furnished Containers | 25 | NCWT | ||||
| Drayage Not Included | ||||||
| 0005B. Contractor‑Furnished Containers: Drayage Included | 25 | NCWT | ||||
| 0005B1. Contractor‑Furnished Containers | 25 | NCWT | ||||
| Drayage Not Included | ||||||
| Item 0006. Outbound Service ‑ Unaccompanied Baggage Packed by Member/employee. Service must include weighing, strapping, banding, obliterating old markings, and | ||||||
| marking. Service may include (when necessary) containerization in outer Service may include (when necessary) containerization in outer containers as ordered by the KO. | ||||||
| Est. Annual Qty | Unit | Unit Price | TOTAL | |||
| 0006A Containerization Not Required: Drayage Included | 15 | GCWT | ||||
| 0006A1 Containerization Not Required: Drayage Not Included | 15 | GCWT | ||||
| 0006B Containerization Required: Drayage Included | 15 | NCWT | ||||
| 0006B1 Containerization Required: Drayage Not Included | 15 | NCWT | ||||
| Item 0007. Outbound Service ‑ Unaccompanied Baggage Packed By Member/employee‑Consolidated Shipments/Government Facility | ||||||
| Service must be the same as Item 0006 above except that service must include two or more shipments picked up from a Government office, warehouse or facility. | ||||||
| Est. Annual Qty | Unit | Unit Price | TOTAL | |||
| 0007A Containerization Not Required: | 15 | GCWT | ||||
| 0007B Containerization Required: | 15 | NCWT | ||||
| Item 0008. Expensive and Valuable Items. Service must include inventorying each item, packing in Government‑approved, contractor‑furnished container(s), | ||||||
| marking, banding and cubing at member/employee's residence. Drayage will be ordered by the contracting officer. If drayage is required, weighing must be done on | ||||||
| properly certified scales and a certified weight ticket must be furnished. If drayage is not required, weighing must be done at residence on member’s/employee's | ||||||
| portable or bathroom scales. In jurisdictions where local law prohibits the certification of portable scales, a weight certificate will not be required. However, upon | ||||||
| the written authority of the contracting officer, the contractor may apply a constructive weight of 11 pounds per gross cubic foot of the container. | ||||||
| Est. Annual Qty | Unit | Unit Price | TOTAL | |||
| 0008A Drayage Included | 25 | NCWT | ||||
| 0008B Drayage Not Included | 25 | NCWT | ||||
| Item 0009. Storage. Storage of containerized articles must be furnished when ordered by the ordering office. Charges must not commence | ||||||
| earlier than the sixth (6th) workday following date of ordering office's receipt of notification of completion of containerization service. Storage | ||||||
| charges apply for each 30-day period or fraction thereof. Date of release from storage must not be considered in computation of storage charges. | ||||||
| Est. Annual Qty | Unit | Unit Price | TOTAL | |||
| 25 | NCWT | |||||
| Item 0010. Containers. Service must consist of the furnishing of new containers or specially constructed wooded crates. IAW ASTM-D4169-01, SDDC Pam 55-12, and | ||||||
| ASTM-D6039/D6039M-02 Containers furnished or specially constructed are to be assembled and ready for loading. When a specific container from SDDS Pamphlet 55-12 is | ||||||
| ordered, the order will indicate the SDDC approval number. (Contractor will notify the Government when the on-hand balance of crates reaches 50 or less. | ||||||
| Est. Annual Qty | Unit | Unit Price | TOTAL | |||
| 0010A Container (ASTM-D4169-01 or SDDC Pam 55-12) | 3 | EA | ||||
| 0010B Crate (ASTM-D6039/D6039M-02) | 100 | CF | or fraction thereof | |||
| Item 0011. Coopering and Assembly/Disassembly Service. | ||||||
| 0011A Coopering. Service must consist of repair of containers not to exceed 30 % of total area of shipping container or cost of repairs will not exceed 50 % of the container | ||||||
| replacement cost. Minor repairs such as, replacement of bolts, nails and bands, shall be accomplished at no expense to the Government. | ||||||
| Est. Annual Qty | Unit | Unit Price | TOTAL | |||
| 5 | EA | |||||
| Item 0011 Cont. | ||||||
| 0011B Assembly/Disassembly of Government-Owned Containers. Contractor must assemble Government-owned containers. Component | ||||||
| parts will be furnished by the Government. Contractor will disassemble Government-owned containers. Component parts will be put into a cloth | ||||||
| bag and attached to the container. Knocked down container sections must be banded. | ||||||
| Est. Annual Qty | Unit | Unit Price | TOTAL | |||
| 0011B1 Assembly | 5 | EA | ||||
| 0011B2 Disassembly | 5 | EA | ||||
| Item 0012. Drayage Beyond the Contract Area of Performance. Service must consist of drayage of packed shipments beyond the contract area of performance, not to exceed | ||||||
| 55 miles. Mileage must be computed on the shortest highway distance commencing with the point of pickup to the outer boundary of the contract area of performance. | ||||||
| Est. Annual Qty | Unit | Unit Price | TOTAL | |||
| 0012A Household goods | 3 | PM | ||||
| 0012B Unaccompanied baggage | 3 | PM | ||||
| Item 0013. Attempted Pickup. When the initial attempt to pickup a shipment at the member's/employee's residence is unsuccessful, charges | ||||||
| apply provided the Contractor notified the Contraction Officer (KO)or their designated representative via telephone & email and provided | ||||||
| that after contractor's notificationthe KO or their representative performes the following: | ||||||
| (a) cannot locate the member/employee within 30 minutes | ||||||
| (b) cannot have the member/employee at the residence within one hour after | ||||||
| (c ) the contractor left a notice of attempted pickup at the residence. | ||||||
| Item 0013 Cont. | Est. Annual Qty | Unit | Unit Price | TOTAL | ||
| 0013A Household goods | 2 | EA | ||||
| 0013B Unaccompanied baggage | 2 | EA | ||||
| Item 0014. Additional Services. The contractor must provide additional services not included in the schedule, but required for satisfactory completion | ||||||
| of the services ordered under this contract, at a rate comparable to the rate for like services as contained in tenders on file with the state regulatory | ||||||
| bodies or SDDC, in effect at the time of the order. | ||||||
| W911S2-16-T-3001 | ||||||
| RECAPITULATION SCHEDULE I | ||||||
| Schedule Total | $ |
&L&"Times New Roman,Bold"&8NCWT = NET HUNDREDWEIGHT
GCWT = GROSS HUNDREDWEIGHT
EA = EACH
PM = PER LOADED MILE
CF = CUBIC FOOT&C&"Times New Roman,Bold"&20SCHEDULE I OUTBOUND SERVICES&R&"Times New Roman,Bold"&18BASE PERIOD
BASE PERIOD SCHEDULE II
| Item 0015. Complete Service - Inbound (HHG). Service must include drayage from contractor's facility to storage warehouse, air and surface transportation | ||||
| terminals, military installation shipping offices and ocean or river terminals/piers and return, unloading from the delivering carrier's vehicle, handling into | ||||
| contractor's facility, drayage to member's/employee's residence, decontainerization and unpacking of loaded containers of household | ||||
| goods in appropriate rooms as directed by member/employee, unservicing appliances, assembly of any disassembled articles and removing shipping | ||||
| containers, barrels, boxes/crates and debris from member's/employee's residence and drayage of empty containers to contractor's or Government facility. | ||||
| Est. Annual Qty | Unit | Unit Price | TOTAL | |
| 3200 | NCWT | |||
| Item 0016. Complete Service ‑ Inbound (HHG). Service must be same as Item 0015 above except that drayage of shipment to residence is not required. | ||||
| Est. Annual Qty | Unit | Unit Price | TOTAL | |
| 80 | NCWT | |||
| Item 0017. Complete Service Inbound (HHG). Service must be the same as Item 0015 above | ||||
| except removal of items from outer container must be at the contractor's facility and articles will be drayed to member’s/employee's residence. | ||||
| Est. Annual Qty | Unit | Unit Price | TOTAL | |
| 20 | NCWT | |||
| Item 0018. Inbound Service‑Contractor Facility (HHG). Services must include drayage from storage warehouses, air and surface transportation terminals,military | ||||
| installation shipping offices, and ocean or river terminals/piers to contractor’s facility, unloading from the delivering carrier’s and ocean or river terminals/piers to | ||||
| contractor’s facility, unloading from the delivering carrier’s vehicle into the contractor’s facility and delivery of articles to property member/employee, motor van | ||||
| van carrier, or NTS contractor at the contractor’s facility. | ||||
| Est. Annual Qty | Unit | Unit Price | TOTAL | |
| 20 | NCWT | |||
| Item 0019. Complete Service ‑ Expensive and Valuable Items. Services must include drayage from the storage warehouses, air and surface transportation | ||||
| terminals, military installation shipping offices, and ocean or river terminals/piers to contractor’s facility, unloading installation shipping offices, and | ||||
| ocean or river terminals/piers to contractor’s facility, unloading from the delivering carrier’s vehicle, handling into contractor’s facility, decontainerization | ||||
| and unpacking of containers at member’s/employee’s residence, and removal of shipping containers and debris from the residence. | ||||
| Est. Annual Qty | Unit | Unit Price | TOTAL | |
| 0019A Drayage Included | 15 | NCWT | ||
| 0019B Drayage Not Included | 15 | NCWT | ||
| Item 0020. Complete Service - Inbound (Unaccompanied Baggage). Service must include drayage from contractor's facility to storage | ||||
| warehouse, air and surface transportation terminals, military installation shipping offices and ocean or river terminals/piers and return, | ||||
| unloading from the delivering carrier's vehicle, handling into contractor's facility, drayage of unaccompanied baggage containers to member's/ | ||||
| employee's residence, unpacking of containers, reassembly or articles and removal of all shipping containers and debris from the residence. | ||||
| Est. Annual Qty | Unit | Unit Price | TOTAL | |
| 550 | NCWT | |||
| Item 0021. Complete Service ‑ Inbound (Unaccompanied Baggage). Service must be same as Item 0020 except that drayage to residence is not required. | ||||
| Est. Annual Qty | Unit | Unit Price | TOTAL | |
| 15 | NCWT | |||
| Item 0022. Inbound Service‑Contractor Facility (Unaccompanied Baggage). Service must be the same as Item 0020 above except service must also include | ||||
| removal of unaccompanied baggage from outer shipping containers for pickup by the member/employee or release to a motor carrier or other contractor at | ||||
| the contractor's facility. | ||||
| Est. Annual Qty | Unit | Unit Price | TOTAL | |
| 15 | NCWT | |||
| Item 0023. Storage. Storage of containerized articles must be furnished when ordered. Charges under this item must not commence earlier than the | ||||
| sixth(6th) workday following date of contractor's notification to the transportation office of arrival of shipment. Storage charges apply for each | ||||
| 30-day period or fraction thereof. Date of release from storage must not be considered in computation of storage charges. | ||||
| Est. Annual Qty | Unit | Unit Price | TOTAL | |
| 50 | NCWT | |||
| Item 0024 Remarking, Coopering and Assembly/Disassembly Service. | ||||
| 0024A Remarking of Shipments for Reconsignment. Service must include drayage from storage warehouses, air and surface transportation terminals, military installations shipping | ||||
| offices, and ocean or river terminals/piers to contractor's facility, unloading from the delivering carrier's vehicle, handling into contractor's facility, obliteration of all old markings, | ||||
| stenciling of necessary information on loaded shipping containers schedule for reconsignment loading on the hauling carrier's vehicle. | ||||
| Est. Annual Qty | Unit | Unit Price | TOTAL | |
| 8 | EA | |||
| 0024B Coopering. Service must consist of repair of containers not to exceed 30 percent of total area of shipping containers or costs of repairs not exceed 50% | ||||
| of the container replacement cost. Minor repair, such as replacement of bolts, renailing and rebanding must be accomplished at no expense to the Government. | ||||
| Est. Annual Qty | Unit | Unit Price | TOTAL | |
| 5 | EA | |||
| Item 0024 Cont. | ||||
| 0024C Assembly/Disassembly of Government-Owned Containers. Contractor will assemble Government-owned containers. Components parts must | ||||
| be put into a cloth bag and attached to the container. Knocked down container sections must be banded. | ||||
| Est. Annual Qty | Unit | Unit Price | TOTAL | |
| 0024C1 Assembly | 3 | EA | ||
| 0024C2 Disassembly | 3 | EA | ||
| Item 0025. Attempted Delivery. When the initial attempt to deliver a shipment at the member's/employee's residence is unsuccessful, charges apply provided the | ||||
| Contractor notified the Contraction Officer (KO)or their designated representative via telephone & email and that after contractor's notification to the KO or their | ||||
| representative, they have performed the following: | ||||
| (a) cannot locate the member/employee within 30 minutes | ||||
| (b) cannot have the member/employee at the residence within one hour after | ||||
| (c ) the contractor left a notice of attempted pickup at the residence. | ||||
| Est. Annual Qty | Unit | Unit Price | TOTAL | |
| 0025A Household goods | 3 | EA | ||
| 0025B Unaccompanied baggage | 3 | EA | ||
| Item 0026 Reweighing. Service must consist of weighing the loaded containers prior to delivery and weighing the empty containers after delivery. | ||||
| Est. Annual Qty | Unit | Unit Price | TOTAL | |
| 0026A Household goods | 30 | EA | ||
| 0026B Unaccompanied baggage | 20 | EA | ||
| Item 0027 Reserved | ||||
| Item 0028. Partial Withdrawal. Service must be the same as Items 0011 or 0012 except a partial removal of the items from the outer container | ||||
| will be performed at the contractor's facility. Articles not removed from the shipment will remain at the contractor's facility. | ||||
| Est. Annual Qty | Unit | Unit Price | TOTAL | |
| 0028A Drayage Included | 25 | NCWT | ||
| 0028B Drayage Not Included | 25 | NCWT | ||
| Item 0029 - Additional Services. The contractor must provide additional services not included in the schedule, but required for satisfactory completion of services | ||||
| ordered under this contract, at a rate comparable to the rate for like services as contained in tenders on file with the state regulatory bodies or SDDC, in effect at the | ||||
| time of the order. | ||||
| W911S2-16-T-3001 | ||||
| RECAPITULATION SCHEDULE II | ||||
| Schedule Total | $ |
&L&"Times New Roman,Bold"&8NCWT = NET HUNDREDWEIGHT
GCWT = GROSS HUNDREDWEIGHT
EA = EACH
PM = PER LOADED MILE
CF = CUBIC FOOT&C&"Times New Roman,Bold"&20SCHEDULE II INBOUND SERVICES&R&"Times New Roman,Bold"&18BASE PERIOD &R&P
BASE PERIOD SCHEDULE III
| Item 0030. Complete Service for Intra-city and Intra-Area moves. Service must include a premove survey, servicing of appliances packaging and packing at | ||||
| member's/employee's residence to protect household goods properly during transit, tagging items, inventorying,loading, weighing, drayage, unloading,unpacking, | ||||
| and placing of each article in member's/employee's new residence as directed by member/employee or member's/employee's designated representative and removal | ||||
| of all empty containers and materials from residence. | ||||
| Est. Annual Qty | Unit | Unit Price | TOTAL | |
| 17000 | NCWT | |||
| Item 0031. Emergancy Storage. Emergency storage shall only be utilized for emergencies (which have been verified |
and authorized by the ITO) shall be furnished
| in conjunction with item 0031 when ordered by the KO or their Representative. Storage charges shall not commence earlier than the 1st day following the date of | ||||
| the Contractor's notification to the Ordering Officer of arrival of the shipment. Storage charges apply for each 30-day period or fraction thereof. Date of release from | ||||
| storage shall not be considered in computation of storage charges. | ||||
| Est. Annual Qty | Unit | Unit Price | TOTAL | |
| 6000 | NCWT | |||
| Item 0032. Attempted Pickup or Delivery. When the initial attempt to pickup or deliver a shipment at the member's/employee's residence is unsuccessful, charges | ||||
| apply provided the Contractor notified the Contraction Officer (KO)or their designated representative via telephone & email and that after contractor's notification | ||||
| to the KO or their representative, they have performed the following: | ||||
| (a) cannot locate the member/employee within 30 minutes | ||||
| (b) cannot have the member/employee at the residence within one hour after | ||||
| (c ) the contractor left a notice of attempted pickup at the residence. | ||||
| Est. Annual Qty | Unit | Unit Price | TOTAL | |
| 0032A Attempted Pickup | 5 | EA | ||
| 0032B Attempted Delivery | 5 | EA | ||
| Item 0033. Drayage Beyond the Contract Area of Performance.Service must consist of drayage of packed shipments beyond the contract area of performance, not to | ||||
| to exceed 55 miles. Mileage must be computed on the shortest highway distance commencing with the point of pickup to outer boundary of contract area of performance. | ||||
| Est. Annual Qty | Unit | Unit Price | TOTAL | |
| 100 | PM | |||
| Item 0034 Additional Services. The contractor must provide additional services not included in the schedule, but required for | ||||
| satisfactory completion of the services ordered under this contract, at a rate comparable to the rate for like services as contained in tenders | ||||
| on file with the state regulatory bodies or SDDC, in effect at the time of the order. | ||||
| W911S2-16-T-3001 | ||||
| RECAPITULATION SCHEDULE III | ||||
| Schedule Total | $ |
&L&"Times New Roman,Bold"&8NCWT = NET HUNDREDWEIGHT
GCWT = GROSS HUNDREDWEIGHT
EA = EACH
PM = PER LOADED MILE
CF = CUBIC FOOT
&C&"Times New Roman,Bold"&20SCHEDULE III INTRA-CITY/INTRA-AREA SERVICES&R&"Times New Roman,Bold"&18BASE PERIOD &R&P
BASE PERIOD SCHEDULE 0
| Item 0030. Complete Service for Intra-city and Intra-Area moves. Service must include a premove survey, servicing of appliances packaging and packing at | ||||
| member's/employee's residence to protect household goods properly during transit, tagging items, inventorying,loading, weighing, drayage, unloading,unpacking, | ||||
| and placing of each article in member's/employee's new residence as directed by member/employee or member's/employee's designated representative and removal | ||||
| of all empty containers and materials from residence. | ||||
| Est. Annual Qty | Unit | Unit Price | TOTAL | |
| 17000 | NCWT | |||
| Item 0031. Emergancy Storage. Emergency storage shall only be utilized for emergencies (which have been verified |
and authorized by the ITO) shall be furnished
| in conjunction with item 0031 when ordered by the KO or their Representative. Storage charges shall not commence earlier than the 1st day following the date of | ||||
| the Contractor's notification to the Ordering Officer of arrival of the shipment. Storage charges apply for each 30-day period or fraction thereof. Date of release from | ||||
| storage shall not be considered in computation of storage charges. | ||||
| Est. Annual Qty | Unit | Unit Price | TOTAL | |
| 6000 | NCWT | |||
| Item 0032. Attempted Pickup or Delivery. When the initial attempt to pickup or deliver a shipment at the member's/employee's residence is unsuccessful, charges | ||||
| apply provided the Contractor notified the Contraction Officer (KO)or their designated representative via telephone & email and that after contractor's notification | ||||
| to the KO or their representative, they have performed the following: | ||||
| (a) cannot locate the member/employee within 30 minutes | ||||
| (b) cannot have the member/employee at the residence within one hour after | ||||
| (c ) the contractor left a notice of attempted pickup at the residence. | ||||
| Est. Annual Qty | Unit | Unit Price | TOTAL | |
| 0032A Attempted Pickup | 5 | EA | ||
| 0032B Attempted Delivery | 5 | EA | ||
| Item 0033. Drayage Beyond the Contract Area of Performance.Service must consist of drayage of packed shipments beyond the contract area of performance, not to | ||||
| to exceed 55 miles. Mileage must be computed on the shortest highway distance commencing with the point of pickup to outer boundary of contract area of performance. | ||||
| Est. Annual Qty | Unit | Unit Price | TOTAL | |
| 100 | PM | |||
| Item 0034 Additional Services. The contractor must provide additional services not included in the schedule, but required for | ||||
| satisfactory completion of the services ordered under this contract, at a rate comparable to the rate for like services as contained in tenders | ||||
| on file with the state regulatory bodies or SDDC, in effect at the time of the order. | ||||
| W911S2-16-T-3001 | ||||
| RECAPITULATION SCHEDULE 0 | ||||
| Schedule Total | $ |
&L&"Times New Roman,Bold"&8NCWT = NET HUNDREDWEIGHT
GCWT = GROSS HUNDREDWEIGHT
EA = EACH
PM = PER LOADED MILE
CF = CUBIC FOOT
&C&"Times New Roman,Bold"&20SCHEDULE III INTRA-CITY/INTRA-AREA SERVICES&R&"Times New Roman,Bold"&18BASE PERIOD &R&P
OPT PERIOD 1 SCHEDULE I
| Item 0001. Complete Service - Outbound (HHG). Services must include premove survey, servicing of appliances, disassembly of furniture, packaging, inventorying, | ||||||
| tagging, wrapping, padding, packing and bracing of household goods in Government-owned and furnished shipping containers (Shipping Container Commercial | ||||||
| Spec ASTM-D4169-01, SDDC Pamphlet 55-12) at member's/employee's residence, or at contractor's facility when ordered by the Contracting Officer (KO), and drayage | ||||||
| of the container within an area or performance. Service must also include loading of shipments on line-haul carrier's equipment at the contractor's facility. When | ||||||
| containers must not accommodate all articles of any one lot, loose articles must be packed in the said containers before any over-packed articles are placed therein. | ||||||
| Overflow, oversize and other shipments must be paid for under Item 0003. | ||||||
| Est. Annual Qty | Unit | Unit Price | TOTAL | |||
| 0001A. At member/employee residence: | 4500 | NCWT | ||||
| Container, Commercial Spec ASTM-D4169-001, or | ||||||
| SDDC Pam. 55-12 | ||||||
| 0001B. At contractors Facility: | 25 | NCWT | ||||
| Container, Commercial Spec ASTM-D4169-01, or | ||||||
| SDDC Pam. 55-12 | ||||||
| Item 0002. Outbound (HHG From Nontemporary Storage). Service must be the same as Item 0001 above except that: (a) HHG must be picked up at a nontemporary | ||||||
| storage facility and transported to contractor's facility; or (b) HHG must be delivered to contractor's facility; and (c) premove survey, servicing of appliances, | ||||||
| preliminary packing and accessorial services must not be provided. Overflow articles requiring containerization must be paid for under Item 0003. | ||||||
| Est. Annual Qty | Unit | Unit Price | TOTAL | |||
| 0002A. Pickup by Contractor: Container, Commercial | 25 | NCWT | ||||
| Container, Commercial Spec ASTM-D4169-001, or SDDC Pam. 55-12 | ||||||
| 0002B. Delivered to contractor: | 250 | NCWT | ||||
| Container, Commercial Spec ASTM-D4169-01, or SDDC Pam. 55-12 | ||||||
| Item 0003. Complete Service-Outbound (HHG-Overflow Articles and HHG Shipments requiring other than ASTM-D4169-01 or SDDC Pam. 55-12 Containers). | ||||||
| Service must be the same as Item 0001 or Item 0002 except that loose articles are drayed to contractor's facility when ordered by the Contracting Officer for | ||||||
| containerization in Government-furnished or contractor-furnished containers. Overflow, other shipments, and oversize containers must be constructed IAW | ||||||
| ASTM-D6251. Each container must be caulked during assembly. Overflow boxes and other shipments that normally require a lesser size box than specified in | ||||||
| ASTM-D4169-01or SDDC Pam. 55-12 and oversized containers are always of a greater size than specified in Commercial Spec ASTM-D4169-01 or SDDS Pam. 55-12. One or | ||||||
| more of these containers may be required per shipment. Overflow containers shall be limited to one per shipment. Price bid for Item 0003 includes container plus weight of its contents. | ||||||
| Est. Annual Qty | Unit | Unit Price | TOTAL | |||
| 0003A. Government-Furnished Containers: Overflow Articles. | 25 | NCWT | ||||
| 0003A1. Government-Furnished Containers: Oversize Articles | 25 | NCWT | ||||
| 0003B. Contractor-Furnished Containers: Overflow Articles. | 50 | NCWT | ||||
| Item 0003 Cont. | ||||||
| 0003B1. Contractor-Furnished Containers: Oversize Articles | 25 | NCWT | ||||
| Item 0004. Complete Service-Outbound (UNACCCOMPANIED BAGGAGE) | ||||||
| Service includes packaging; inventorying; packing in Government approved containers; weighing; strapping; obliteration of old markings; marking; and loading shipments on | ||||||
| the line-haul carrier's equipment. Service shall be performed at owner's residence. (Service may be performed at contractor's facility when ordered by the Contracting Officer.) | ||||||
| Drayage, if required, will be ordered by the Contracting Officer. | ||||||
| Est. Annual Qty | Unit | Unit Price | TOTAL | |||
| 0004A. Government‑Furnished Containers Drayage Included | 25 | NCWT | ||||
| 0004B. Government‑Furnished Containers Drayage Not Included | 25 | NCWT | ||||
| 0004C. Contractor‑Furnished Containers Drayage Included | 750 | NCWT | ||||
| 0004D. Contractor‑Furnished Containers Drayage Not Included | 25 | NCWT | ||||
| Item 0005. Complete Service ‑ Outbound (Unaccompanied Baggage from Nontemporary Storage). Service must be the same as Item 0004 except that | ||||||
| (a) unaccompanied baggage must be picked up at a nontemporary storage facility and transported to contractor's facility; or (b)unaccompanied baggage must be | ||||||
| delivered to contractor's facility; and (c) servicing of appliances, preliminary packing and accessorial services must not be provided. | ||||||
| Est. Annual Qty | Unit | Unit Price | TOTAL | |||
| 0005A. Government‑Furnished Containers: Drayage Included | 25 | NCWT | ||||
| 0005A1. Government‑Furnished Containers | 25 | NCWT | ||||
| Drayage Not Included | ||||||
| 0005B. Contractor‑Furnished Containers: Drayage Included | 25 | NCWT | ||||
| 0005B1. Contractor‑Furnished Containers | 25 | NCWT | ||||
| Drayage Not Included | ||||||
| Item 0006. Outbound Service ‑ Unaccompanied Baggage Packed by Member/employee. Service must include weighing, strapping, banding, obliterating old markings, and | ||||||
| marking. Service may include (when necessary) containerization in outer Service may include (when necessary) containerization in outer containers as ordered by the KO. | ||||||
| Est. Annual Qty | Unit | Unit Price | TOTAL | |||
| 0006A Containerization Not Required: Drayage Included | 15 | GCWT | ||||
| 0006A1 Containerization Not Required: Drayage Not Included | 15 | GCWT | ||||
| 0006B Containerization Required: Drayage Included | 15 | NCWT | ||||
| 0006B1 Containerization Required: Drayage Not Included | 15 | NCWT | ||||
| Item 0007. Outbound Service ‑ Unaccompanied Baggage Packed By Member/employee‑Consolidated Shipments/Government Facility | ||||||
| Service must be the same as Item 0006 above except that service must include two or more shipments picked up from a Government office, warehouse or facility. | ||||||
| Est. Annual Qty | Unit | Unit Price | TOTAL | |||
| 0007A Containerization Not Required: | 15 | GCWT | ||||
| 0007B Containerization Required: | 15 | NCWT | ||||
| Item 0008. Expensive and Valuable Items. Service must include inventorying each item, packing in Government‑approved, contractor‑furnished container(s), | ||||||
| marking, banding and cubing at member/employee's residence. Drayage will be ordered by the contracting officer. If drayage is required, weighing must be done on | ||||||
| properly certified scales and a certified weight ticket must be furnished. If drayage is not required, weighing must be done at residence on member’s/employee's | ||||||
| portable or bathroom scales. In jurisdictions where local law prohibits the certification of portable scales, a weight certificate will not be required. However, upon | ||||||
| the written authority of the contracting officer, the contractor may apply a constructive weight of 11 pounds per gross cubic foot of the container. | ||||||
| Est. Annual Qty | Unit | Unit Price | TOTAL | |||
| 0008A Drayage Included | 25 | NCWT | ||||
| 0008B Drayage Not Included | 25 | NCWT | ||||
| Item 0009. Storage. Storage of containerized articles must be furnished when ordered by the ordering office. Charges must not commence | ||||||
| earlier than the sixth (6th) workday following date of ordering office's receipt of notification of completion of containerization service. Storage | ||||||
| charges apply for each 30-day period or fraction thereof. Date of release from storage must not be considered in computation of storage charges. | ||||||
| Est. Annual Qty | Unit | Unit Price | TOTAL | |||
| 25 | NCWT | |||||
| Item 0010. Containers. Service must consist of the furnishing of new containers or specially constructed wooded crates. IAW ASTM-D4169-01, SDDC Pam 55-12, and | ||||||
| ASTM-D6039/D6039M-02 Containers furnished or specially constructed are to be assembled and ready for loading. When a specific container from SDDS Pamphlet 55-12 is | ||||||
| ordered, the order will indicate the SDDC approval number. (Contractor will notify the Government when the on-hand balance of crates reaches 50 or less. | ||||||
| Est. Annual Qty | Unit | Unit Price | TOTAL | |||
| 0010A Container (ASTM-D4169-01 or SDDC Pam 55-12) | 3 | EA | ||||
| 0010B Crate (ASTM-D6039/D6039M-02) | 100 | CF | or fraction thereof | |||
| Item 0011. Coopering and Assembly/Disassembly Service. | ||||||
| 0011A Coopering. Service must consist of repair of containers not to exceed 30 % of total area of shipping container or cost of repairs will not exceed 50 % of the container | ||||||
| replacement cost. Minor repairs such as, replacement of bolts, nails and bands, shall be accomplished at no expense to the Government. | ||||||
| Est. Annual Qty | Unit | Unit Price | TOTAL | |||
| 5 | EA | |||||
| Item 0011 Cont. | ||||||
| 0011B Assembly/Disassembly of Government-Owned Containers. Contractor must assemble Government-owned containers. Component | ||||||
| parts will be furnished by the Government. Contractor will disassemble Government-owned containers. Component parts will be put into a cloth | ||||||
| bag and attached to the container. Knocked down container sections must be banded. | ||||||
| Est. Annual Qty | Unit | Unit Price | TOTAL | |||
| 0011B1 Assembly | 5 | EA | ||||
| 0011B2 Disassembly | 5 | EA | ||||
| Item 0012. Drayage Beyond the Contract Area of Performance. Service must consist of drayage of packed shipments beyond the contract area of performance, not to exceed | ||||||
| 55 miles. Mileage must be computed on the shortest highway distance commencing with the point of pickup to the outer boundary of the contract area of performance. | ||||||
| Est. Annual Qty | Unit | Unit Price | TOTAL | |||
| 0012A Household goods | 3 | PM | ||||
| 0012B Unaccompanied baggage | 3 | PM | ||||
| Item 0013. Attempted Pickup. When the initial attempt to pickup a shipment at the member's/employee's residence is unsuccessful, charges | ||||||
| apply provided the Contractor notified the Contraction Officer (KO)or their designated representative via telephone & email and provided | ||||||
| that after contractor's notificationthe KO or their representative performes the following: | ||||||
| (a) cannot locate the member/employee within 30 minutes | ||||||
| (b) cannot have the member/employee at the residence within one hour after | ||||||
| (c ) the contractor left a notice of attempted pickup at the residence. | ||||||
| Item 0013 Cont. | Est. Annual Qty | Unit | Unit Price | TOTAL | ||
| 0013A Household goods | 2 | EA | ||||
| 0013B Unaccompanied baggage | 2 | EA | ||||
| Item 0014. Additional Services. The contractor must provide additional services not included in the schedule, but required for satisfactory completion | ||||||
| of the services ordered under this contract, at a rate comparable to the rate for like services as contained in tenders on file with the state regulatory | ||||||
| bodies or SDDC, in effect at the time of the order. | ||||||
| W911S2-16-T-3001 | ||||||
| RECAPITULATION SCHEDULE I | ||||||
| Schedule Total | $ |
&L&"Times New Roman,Bold"&8NCWT = NET HUNDREDWEIGHT
GCWT = GROSS HUNDREDWEIGHT
EA = EACH
PM = PER LOADED MILE
CF = CUBIC FOOT&C&"Times New Roman,Bold"&20SCHEDULE I OUTBOUND SERVICES&R&"Times New Roman,Bold"&18OPTION PERIOD 1 &R&P
OPT PERIOD 1 SCHEDULE II
| Item 0015. Complete Service - Inbound (HHG). Service must include drayage from contractor's facility to storage warehouse, air and surface transportation | ||||||
| terminals, military installation shipping offices and ocean or river terminals/piers and return, unloading from the delivering carrier's vehicle, handling into | ||||||
| contractor's facility, drayage to member's/employee's residence, decontainerization and unpacking of loaded containers of household | ||||||
| goods in appropriate rooms as directed by member/employee, unservicing appliances, assembly of any disassembled articles and removing shipping | ||||||
| containers, barrels, boxes/crates and debris from member's/employee's residence and drayage of empty containers to contractor's or Government facility. | ||||||
| Est. Annual Qty | Unit | Unit Price | TOTAL | |||
| 3200 | NCWT | |||||
| Item 0016. Complete Service ‑ Inbound (HHG). Service must be same as Item 0015 above except that drayage of shipment to residence is not required. | ||||||
| Est. Annual Qty | Unit | Unit Price | TOTAL | |||
| 80 | NCWT | |||||
| Item 0017. Complete Service Inbound (HHG). Service must be the same as Item 0015 above | ||||||
| except removal of items from outer container must be at the contractor's facility and articles will be drayed to member’s/employee's residence. | ||||||
| Est. Annual Qty | Unit | Unit Price | TOTAL | |||
| 20 | NCWT | |||||
| Item 0018. Inbound Service‑Contractor Facility (HHG). Services must include drayage from storage warehouses, air and surface transportation terminals,military | ||||||
| installation shipping offices, and ocean or river terminals/piers to contractor’s facility, unloading from the delivering carrier’s and ocean or river terminals/piers to | ||||||
| contractor’s facility, unloading from the delivering carrier’s vehicle into the contractor’s facility and delivery of articles to property member/employee, motor van | ||||||
| van carrier, or NTS contractor at the contractor’s facility. | ||||||
| Est. Annual Qty | Unit | Unit Price | TOTAL | |||
| 20 | NCWT | |||||
| Item 0019. Complete Service ‑ Expensive and Valuable Items. Services must include drayage from the storage warehouses, air and surface transportation | ||||||
| terminals, military installation shipping offices, and ocean or river terminals/piers to contractor’s facility, unloading installation shipping offices, and | ||||||
| ocean or river terminals/piers to contractor’s facility, unloading from the delivering carrier’s vehicle, handling into contractor’s facility, decontainerization | ||||||
| and unpacking of containers at member’s/employee’s residence, and removal of shipping containers and debris from the residence. | ||||||
| Est. Annual Qty | Unit | Unit Price | TOTAL | |||
| 0019A Drayage Included | 15 | NCWT | ||||
| 0019B Drayage Not Included | 15 | NCWT | ||||
| Item 0020. Complete Service - Inbound (Unaccompanied Baggage). Service must include drayage from contractor's facility to storage | ||||||
| warehouse, air and surface transportation terminals, military installation shipping offices and ocean or river terminals/piers and return, | ||||||
| unloading from the delivering carrier's vehicle, handling into contractor's facility, drayage of unaccompanied baggage containers to member's/ | ||||||
| employee's residence, unpacking of containers, reassembly or articles and removal of all shipping containers and debris from the residence. | ||||||
| Est. Annual Qty | Unit | Unit Price | TOTAL | |||
| 550 | NCWT | |||||
| Item 0021. Complete Service ‑ Inbound (Unaccompanied Baggage). Service must be same as Item 0020 except that drayage to residence is not required. | ||||||
| Est. Annual Qty | Unit | Unit Price | TOTAL | |||
| 15 | NCWT | |||||
| Item 0022. Inbound Service‑Contractor Facility (Unaccompanied Baggage). Service must be the same as Item 0020 above except service must also include | ||||||
| removal of unaccompanied baggage from outer shipping containers for pickup by the member/employee or release to a motor carrier or other contractor at | ||||||
| the contractor's facility. | ||||||
| Est. Annual Qty | Unit | Unit Price | TOTAL | |||
| 15 | NCWT | |||||
| Item 0023. Storage. Storage of containerized articles must be furnished when ordered. Charges under this item must not commence earlier than the | ||||||
| sixth(6th) workday following date of contractor's notification to the transportation office of arrival of shipment. Storage charges apply for each | ||||||
| 30-day period or fraction thereof. Date of release from storage must not be considered in computation of storage charges. | ||||||
| Est. Annual Qty | Unit | Unit Price | TOTAL | |||
| 50 | NCWT | |||||
| Item 0024 Remarking, Coopering and Assembly/Disassembly Service. | ||||||
| 0024A Remarking of Shipments for Reconsignment. Service must include drayage from storage warehouses, air and surface transportation terminals, military installations shipping | ||||||
| offices, and ocean or river terminals/piers to contractor's facility, unloading from the delivering carrier's vehicle, handling into contractor's facility, obliteration of all old markings, | ||||||
| stenciling of necessary information on loaded shipping containers schedule for reconsignment loading on the hauling carrier's vehicle. | ||||||
| Est. Annual Qty | Unit | Unit Price | TOTAL | |||
| 8 | EA | |||||
| 0024B Coopering. Service must consist of repair of containers not to exceed 30 percent of total area of shipping containers or costs of repairs not exceed 50% | ||||||
| of the container replacement cost. Minor repair, such as replacement of bolts, renailing and rebanding must be accomplished at no expense to the Government. | ||||||
| Est. Annual Qty | Unit | Unit Price | TOTAL | |||
| 5 | EA | |||||
| Item 0024 Cont. | ||||||
| 0024C Assembly/Disassembly of Government-Owned Containers. Contractor will assemble Government-owned containers. Components parts must | ||||||
| be put into a cloth bag and attached to the container. Knocked down container sections must be banded. | ||||||
| Est. Annual Qty | Unit | Unit Price | TOTAL | |||
| 0024C1 Assembly | 3 | EA | ||||
| 0024C2 Disassembly | 3 | EA | ||||
| Item 0025. Attempted Delivery. When the initial attempt to deliver a shipment at the member's/employee's residence is unsuccessful, charges apply provided the | ||||||
| Contractor notified the Contraction Officer (KO)or their designated representative via telephone & email and that after contractor's notification to the KO or their | ||||||
| representative, they have performed the following: | ||||||
| (a) cannot locate the member/employee within 30 minutes | ||||||
| (b) cannot have the member/employee at the residence within one hour after | ||||||
| (c ) the contractor left a notice of attempted pickup at the residence. | ||||||
| Est. Annual Qty | Unit | Unit Price | TOTAL | |||
| 0025A Household goods | 3 | EA | ||||
| 0025B Unaccompanied baggage | 3 | EA | ||||
| Item 0026 Reweighing. Service must consist of weighing the loaded containers prior to delivery and weighing the empty containers after delivery. | ||||||
| Est. Annual Qty | Unit | Unit Price | TOTAL | |||
| 0026A Household goods | 30 | EA | ||||
| 0026B Unaccompanied baggage | 20 | EA | ||||
| Item 0027 Reserved | ||||||
| Item 0028. Partial Withdrawal. Service must be the same as Items 0011 or 0012 except a partial removal of the items from the outer container | ||||||
| will be performed at the contractor's facility. Articles not removed from the shipment will remain at the contractor's facility. | ||||||
| Est. Annual Qty | Unit | Unit Price | TOTAL | |||
| 0028A Drayage Included | 25 | NCWT | ||||
| 0028B Drayage Not Included | 25 | NCWT | ||||
| Item 0029 - Additional Services. The contractor must provide additional services not included in the schedule, but required for satisfactory completion of services | ||||||
| ordered under this contract, at a rate comparable to the rate for like services as contained in tenders on file with the state regulatory bodies or SDDC, in effect at the | ||||||
| time of the order. | ||||||
| W911S2-16-T-3001 | ||||||
| RECAPITULATION SCHEDULE II | ||||||
| Schedule Total | $ |
&L&"Times New Roman,Bold"&8NCWT = NET HUNDREDWEIGHT
GCWT = GROSS HUNDREDWEIGHT
EA = EACH
PM = PER LOADED MILE
CF = CUBIC FOOT&C&"Times New Roman,Bold"&20SCHEDULE II INBOUND SERVICES&R&"Times New Roman,Bold"&18OPTION PERIOD 1 &R&P
OPT PERIOD 1 SCHEDULE III
| Item 0030. Complete Service for Intra-city and Intra-Area moves. Service must include a premove survey, servicing of appliances packaging and packing at | ||||
| member's/employee's residence to protect household goods properly during transit, tagging items, inventorying,loading, weighing, drayage, unloading,unpacking, | ||||
| and placing of each article in member's/employee's new residence as directed by member/employee or member's/employee's designated representative and removal | ||||
| of all empty containers and materials from residence. | ||||
| Est. Annual Qty | Unit | Unit Price | TOTAL | |
| 17000 | NCWT | |||
| Item 0031. Emergancy Storage. Emergency storage shall only be utilized for emergencies (which have been verified |
and authorized by the ITO) shall be furnished
| in conjunction with item 0031 when ordered by the KO or their Representative. Storage charges shall not commence earlier than the 1st day following the date of | ||||
| the Contractor's notification to the Ordering Officer of arrival of the shipment. Storage charges apply for each 30-day period or fraction thereof. Date of release from | ||||
| storage shall not be considered in computation of storage charges. | ||||
| Est. Annual Qty | Unit | Unit Price | TOTAL | |
| 6000 | NCWT | |||
| Item 0032. Attempted Pickup or Delivery. When the initial attempt to pickup or deliver a shipment at the member's/employee's residence is unsuccessful, charges | ||||
| apply provided the Contractor notified the Contraction Officer (KO)or their designated representative via telephone & email and that after contractor's notification | ||||
| to the KO or their representative, they have performed the following: | ||||
| (a) cannot locate the member/employee within 30 minutes | ||||
| (b) cannot have the member/employee at the residence within one hour after | ||||
| (c ) the contractor left a notice of attempted pickup at the residence. | ||||
| Est. Annual Qty | Unit | Unit Price | TOTAL | |
| 0032A Attempted Pickup | 5 | EA | ||
| 0032B Attempted Delivery | 5 | EA | ||
| Item 0033. Drayage Beyond the Contract Area of Performance.Service must consist of drayage of packed shipments beyond the contract area of performance, not to | ||||
| to exceed 55 miles. Mileage must be computed on the shortest highway distance commencing with the point of pickup to outer boundary of contract area of performance. | ||||
| Est. Annual Qty | Unit | Unit Price | TOTAL | |
| 100 | PM | |||
| Item 0034 Additional Services. The contractor must provide additional services not included in the schedule, but required for | ||||
| satisfactory completion of the services ordered under this contract, at a rate comparable to the rate for like services as contained in tenders | ||||
| on file with the state regulatory bodies or SDDC, in effect at the time of the order. | ||||
| W911S2-16-T-3001 | ||||
| RECAPITULATION SCHEDULE III | ||||
| Schedule Total | $ |
&L&"Times New Roman,Bold"&8NCWT = NET HUNDREDWEIGHT
GCWT = GROSS HUNDREDWEIGHT
EA = EACH
PM = PER LOADED MILE
CF = CUBIC FOOT&C&"Times New Roman,Bold"&20SCHEDULE III INTRA-CITY/INTRA-AREA SERVICES&R&"Times New Roman,Bold"&18OPTION PERIOD 1 &R&P
OPT PERIOD 1 SCHEDULE 0
| Item 0030. Complete Service for Intra-city and Intra-Area moves. Service must include a premove survey, servicing of appliances packaging and packing at | ||||
| member's/employee's residence to protect household goods properly during transit, tagging items, inventorying,loading, weighing, drayage, unloading,unpacking, | ||||
| and placing of each article in member's/employee's new residence as directed by member/employee or member's/employee's designated representative and removal | ||||
| of all empty containers and materials from residence. | ||||
| Est. Annual Qty | Unit | Unit Price | TOTAL | |
| 17000 | NCWT | |||
| Item 0031. Emergancy Storage. Emergency storage shall only be utilized for emergencies (which have been verified |
and authorized by the ITO) shall be furnished
| in conjunction with item 0031 when ordered by the KO or their Representative. Storage charges shall not commence earlier than the 1st day following the date of | ||||
| the Contractor's notification to the Ordering Officer of arrival of the shipment. Storage charges apply for each 30-day period or fraction thereof. Date of release from | ||||
| storage shall not be considered in computation of storage charges. | ||||
| Est. Annual Qty | Unit | Unit Price | TOTAL | |
| 6000 | NCWT | |||
| Item 0032. Attempted Pickup or Delivery. When the initial attempt to pickup or deliver a shipment at the member's/employee's residence is unsuccessful, charges | ||||
| apply provided the Contractor notified the Contraction Officer (KO)or their designated representative via telephone & email and that after contractor's notification | ||||
| to the KO or their representative, they have performed the following: | ||||
| (a) cannot locate the member/employee within 30 minutes | ||||
| (b) cannot have the member/employee at the residence within one hour after | ||||
| (c ) the contractor left a notice of attempted pickup at the residence. | ||||
| Est. Annual Qty | Unit | Unit Price | TOTAL | |
| 0032A Attempted Pickup | 5 | EA | ||
| 0032B Attempted Delivery | 5 | EA | ||
| Item 0033. Drayage Beyond the Contract Area of Performance.Service must consist of drayage of packed shipments beyond the contract area of performance, not to | ||||
| to exceed 55 miles. Mileage must be computed on the shortest highway distance commencing with the point of pickup to outer boundary of contract area of performance. | ||||
| Est. Annual Qty | Unit | Unit Price | TOTAL | |
| 100 | PM | |||
| Item 0034 Additional Services. The contractor must provide additional services not included in the schedule, but required for |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .