Q&A_20JUN17.docx

DOCX document 12 KB Posted

Attached to
Chloride Dust Palliative
Solicitation number
W911RZ-17-Q-0035
Issued by

View the file

Other files

File Type Posted
Q&A_19JUL17.docx DOCX document
Attachment_2_-_Hydrant_Application.doc DOC document
Attachment_1_-_Water_Points_South.pdf PDF
Q&A_17JUL17.docx DOCX document
Solicitation_-_10_July_2017.pdf PDF
DPW17-009_Submittal_Register.xls XLS spreadsheet
20170605_DPW17-009_Drawings_Combined.pdf PDF
Solicitation_-_12_JUNE_17.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation W911RZ-17-Q-0035 Fort Carson Dust Suppressant Questions and Answer 20 June 2017

Question: Can you please confirm, are you only requiring delivery and application of mag for this bid, or are you requiring the bidder to complete the work listed in sections 2.7.3.1.1.1.1 through 2.7.3.1.1.1.3? It appears this solicitation is for road building/work and application of chemical not only application of chemical.

Answer: The work listed in Sections 2.7.3.1.1.1.1 through 2.7.3.1.1.1.3 is the process that is required to properly apply this product.

Proper application involves: Scarifying the top 2 inches of the road surface, wetting with water to approximately 4% moisture content 3-4 inches deep, applying magnesium chloride in two applications of 0.25 gallons per square yard allow to soak for at least 30 minutes between applications, and finally rolling the surface with a pneumatic tire roller. This is not "road building/work". It is the application process specified in the CDOT spec and manufacturer's instructions.

Section 2.7.3.1.1.1.5 specifies that the magnesium chloride shall be applied in accordance with CDOT Specifications, manufacturer instructions, and the contract documents.

File details come from the government source that posted it. Updated .