DPW17-009_Submittal_Register.xls

XLS spreadsheet 36 KB Posted

Attached to
Chloride Dust Palliative
Solicitation number
W911RZ-17-Q-0035
Issued by

About this file

Submittal Register

View the file

Other files

File Type Posted
Q&A_19JUL17.docx DOCX document
Attachment_2_-_Hydrant_Application.doc DOC document
Attachment_1_-_Water_Points_South.pdf PDF
Q&A_17JUL17.docx DOCX document
Solicitation_-_10_July_2017.pdf PDF
Q&A_20JUN17.docx DOCX document
20170605_DPW17-009_Drawings_Combined.pdf PDF
Solicitation_-_12_JUNE_17.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1 (5)

SUBMITTAL REGISTERCONTRACT NO.
(ER 415-1-10)
TITLE AND LOCATIONCONTRACTORSPECIFICATION SECTION
DPW17-009 SUS, Apply Dust Suppressant, FCCO, PAV
CLASSI-
TYPE OF SUBMITTALFICATIONCONTRACTORCONTRACTORGOVERNMENT
SCHEDULED DATESACTIONACTION
IC
NEI
SSRNG
TRANS-SPECIFICATIONTSTTFO
MITTALITEMPARAGRAPHDESCRIPTION OFDRCAIOVAR
NO.NO.NUMBERITEM SUBMITTEDRUHTRFSRREPEAPPROVALMATERIALSUBMIT
ACEEEIAEMRPVSUBMITNEEDEDNEEDEDCODEDATETOCODEDATEREMARKS
WTDMPCMCANRIBYBYGOVERN-
DIIUEOAPOTOMOEMENT
ANOLNRTLRINEVW
TGNETTEEDOLNEE
ASSSSSSSSNYTDR
a.b.c.d.e.f.g.h.i.j.k.l.m.n.o.p.q.r.s.t.u.v.w.x.
1Construction Schedule showing Key Milestones and Inspection Points, As Often
As Required to Maintain AccuracyxxNLT 2 weeks after NTP
2Quality Control PlanxxNLT 2 weeks after NTP
3DPW Approved Outage Requests, Signed by Required Signators, Including Traffic Contol PlanxxNLT 1 week Prior to Outage
4Proposed Materials to be Used for Dust SuppressionxxNLT 2 weeks after NTP
5All Quality Control Test ReportsxxNLT 1 week after Testing Conducted
ENG FORM 4288, May 91EDITION OF AUG 89 IS OBSOLETEPage _______ of ________(Proponent: CEMP-CE)

File details come from the government source that posted it. Updated .