W911RQ19Q0012P0001.pdf

PDF 509 KB Posted

Attached to
Aqautic Vegetation Treatment
Solicitation number
W911RQ19Q0010
Issued by

About this file

Mod to Extend Solicitation date and add to the PWS

View the file

Other files

File Type Posted
PWS_Aquatic_Veg_Herbicide_(2019_).pdf PDF
W911RQ19Q0010_Amend_to_Extend_Close.pdf PDF
Q&A_03-11-2019.docx DOCX document
W911RQ19Q0010_SOL_MOD_doc.pdf PDF
Site_Visit_info-Final.docx DOCX document
Site_Visit_info-2.docx DOCX document
Site_Visit_info.docx DOCX document
W911RQ19Q0010_SOLICITATION.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W45G18835400E3

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Extend Solicitation end date to March 13, 20019 (03/13/2019). Add to the PWS Contractor shall remove a minimum of 1 (one) acre per day of aqautic vegetation..

1. CONTRACT ID CODE PAGE OF PAGES

J 1 9

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 21-Feb-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W911RQ19Q0010

X 9B. DATED (SEE ITEM 11)

31-Jan-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

21-Feb-2019

CODE

RED RIVER ARMY DEPOT

DIRECTORATE FOR CONTRACTING

100 JAMES CARLOW DRIVE BLDG 431

TEXARKANA TX 75501-5000

W911RQ 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W911RQ19Q0010

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

SOLICITATION/CONTRACT FORM

The required response date/time has changed from 04-Mar-2019 03:00 PM to 13-Mar-2019 12:00 AM.

The following have been modified:

PERFROMANCE WORK STATEMENT PWS

PERFORMANCE WORK STATEMENT (PWS) AQUATIC VEGETATION REMOVAL

SERVICES

PART 1

1. GENERAL: This Performance Work Statement (PWS) outlines the requirements to provide Aquatic Vegetation Removal Services on Caney Creek Reservoir on the Red River Army Depot, Texarkana, Texas.

1.1 Description of Services/Introduction: The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform aquatic vegetation removal services as defined in this PWS, except for those items specified as government furnished property and services in Part 3 of this PWS.

The Contractor shall obtain any and all licenses/permits, approvals, notifications, and other documentation necessary to properly conduct the services in this contract, at no additional cost to the United States Government

(USG).

1.2 Background: Caney Creek Reservoir is an approximately 185 acre lake located on Red River Army Depot (RRAD) near Texarkana, Texas. The reservoir has several species of native and non-native species of aquatic vegetation that currently cover approximately 58% of the surface and subsurface area of the lake.

RRAD desires to maintain the coverage of vegetation at approximately 20% to allow for multiple use benefits.

1.3 Objectives: The Contactor shall perform the following services:

The purpose of this contract is to temporarily reduce the coverage of floating and submerged, aquatic vegetation on the Red River Army Depot’s (RRAD) Caney Creek Reservoir in northeast Texas, in order to facilitate the application of pesticides at a later date. The project consists of removing and disposing of aquatic vegetation.

Army Regulation 200-1, Environmental Protection and Enhancement requires that installations manage natural resources on an ecosystem basis while decreasing the amount of pesticide usage across the Army. Caney Creek Reservoir is an approximately 185 acre lake with several species of native and non-native aquatic species.

1.3.1 This Performance Work Statement (PWS) defines requirements for implementing this project for the benefit of temporarily reducing aquatic vegetation density/coverage on Caney Creek Reservoir to that of approximately 20%.

1.4 Scope: This project will involve removing and disposing of all aquatic vegetation that occurs between the depths of 2’ to 5’ and extending out into the lake to the outer extent of floating vegetation in all areas designated by the US Government (USG). Total area of vegetation to be treated will include approximately 40-60 acres as determined by the Government. Contractor shall remove a minimum of 1 (one) acre per day of aqautic vegetation.

1.4.1 Red River Army Depot will furnish a map of the treatment areas.

1.4.2 Aquatic plants are to be removed from the lake using methods that minimize the escape of plant fragments.

1.4.3 Mechanical harvesting can be performed 6 days a week. Caney Creek Reservoir will be shut down one weekday per week, normally a Wednesday or Thursday due to mission requirements.

1.4.4 Plant material must be removed and disposed of promptly after collection. Red River Army Depot will provide a disposal site for the waste.

1.5 Period of Performance: The treatment shall occur on Caney Creek Reservoir during June, after complete coverage of vegetation is in place and as determined by the COR. The period of performance shall expire 01 August 2019.

1.6 Quality Control: The Contractor shall develop and maintain an effective Quality Control Plan (QCP) to ensure services are performed in accordance with this PWS. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services as well as include safeguards for proper collection, transport and disposal practices. The Contractor’s final QCP shall be submitted for review within fifteen

(15) days of the contract date and shall be made available to the KO, COR, or ACOR. After acceptance of the QCP, the Contractor must receive the KO’s acceptance in writing for any proposed changes to the submitted quality control system.

1.6.1 Quality Assurance: The USG will evaluate the Contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the USG must do to ensure that the Contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum level of acceptable performance.

1.6.2 Place of Performance: The work to be performed under this contract will be performed at Red River Army Depot, Texarkana, Texas.

1.6.3 Periodic Progress Meetings: The KO, COR, and other USG personnel, as appropriate, may meet periodically with the Contractor to review the Contractor's performance. At these meetings, the COR will apprise the Contractor of how the USG views the Contractor's performance. The Contractor shall identify problems or potential problems immediately to the COR or the Contracting Officer instead of waiting for a progress meeting. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the USG.

1.6.4 Inspections: All equipment utilized by the Contractor in the execution of this contract shall be made available at any time without prior notice for inspection and/or site visits by the KO, COR, ACORs, or other inspector authorized by the KO, COR or ACOR. Authorized inspectors identified by the KO or COR shall be permitted to take photographs, video, samples, notes, and other information as required to report on the progress of the project.

1.6.5 Contracting Officer Representative (COR): The COR will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract:

perform inspections necessary in connection with contract performance; maintain written and oral communications with the Contractor concerning technical aspects of the contract; assist the KO with issuing written interpretations of technical requirements; monitor Contractor's performance and notify both the KO and Contractor of any deficiencies; and coordinate availability of USG furnished services and property. A COR appointment letter, which shall be sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the contract or task order.

1.6.6 Key Personnel: The following personnel are considered key personnel by the USG:

Contract Manager

Alternate Contract Manager Site Manager

The Contractor shall identify and provide acceptable qualifications for the following individuals that the Contractor intends to utilize in the performance of this contract. The contractor shall also provide the names, phone numbers, and email addresses for all of the individuals in these positions and keep the COR updated as changes occur. (All emails should be valid formats compatible with U.S. Government systems/MS Outlook.)

1.6.7 The Contract Manager: The Contractor shall provide a Contract Manager who shall be responsible for the performance of the work. The name of this person and an Alternate Contract Manager, who shall act for the Contractor when the Contract Manager is absent, shall be designated in writing to the KO. The Contract Manager, or Alternate Contract Manager, shall have full authority to act for the Contractor on all contract matters relating to daily operation of this contract, shall be fluent in English and shall be technically versed and proficient in all aspects of solid waste management as it pertains to the performance of this contract. The Contract Manager or Alternate Contract Manager shall be available during the hours of 0800 to 1600 daily.

1.6.8 The Site Manager: The Site Manager shall be available to coordinate on-site performance of the contract on RRAD. The Site Manager shall interface directly with the designated COR, as well as coordinating on site issues as required with the RRAD Command, security personnel and/or the RRAD Public Works Department.

The Site Manager is responsible for ensuring the contract requirements are followed at all time by employees on this contract.

1.6.9 Identification of Contractor Employees: A list of employees shall be sent to the COR at least 48 hours in advance of arriving at RRAD. All Contractor personnel on RRAD shall process in through the Visitor Control Center on the first day and shall travel directly to and from the work site daily.

PART 2

DEFINITIONS & ACRONYMS

2. DEFINITIONS AND ACRONYMS:

2.1. Definitions:

2.1.1. Contractor. A supplier or vendor awarded a contract to provide specific supplies or service to the USG.

The term used in this PWS refers to the prime Contractor.

2.1.2. Contracting Officer (KO). A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.

2.1.3. Contracting Officer’s Representative (COR). An employee of the USG appointed by the KO to provide surveillance of the Contractor’s performance under the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does not have the authority to change the terms and conditions of the contract.

2.1.4. Defective Service. A service output that does not meet the standard of performance associated with the PWS.

2.1.5. Deliverable. Anything that can be physically delivered, but may include non-manufactured things such as meeting minutes or reports.

2.1.6. Key Personnel. Identification of Contractor personnel who the USG considers as key personnel to the performance of this contract.

2.1.7. Quality Assurance. The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.

2.1.8. Quality Assurance Surveillance Plan (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of Contractor performance.

2.1.9. Quality Control. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.

2.1.10. SubContractor. One that enters into a contract with a Prime Contractor.

2.2. Acronyms:

ACOR Alternate Contracting Officer's Representative AFARS Army Federal Acquisition Regulation Supplement AR Army Regulation CDR Contract Discrepancy Report CFR Code of Federal Regulations COR Contracting Officer Representative COTR Contracting Officer's Technical Representative DA Department of the Army DD250 Department of Defense Form 250 (Receiving Report) DFARS Defense Federal Acquisition Regulation Supplement DOD Department of Defense FAR Federal Acquisition Regulation HIPAA Health Insurance Portability and Accountability Act of 1996 KO Contracting Officer OCI Organizational Conflict of Interest OCONUS Outside Continental United States (includes Alaska and Hawaii) PIPO Phase-In/Phase-Out POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QAP Quality Assurance Program QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program RRAD Red River Army Depot TE Technical Exhibit USG United States Government

PART 3

GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND

SERVICES

3. GOVERNMENT FURNISHED ITEMS AND SERVICES:

3.1 Plant Waste Accumulation Site: RRAD will designate areas for the Contractor to dispose of collected plant material/silt.

3.2 Fuel: The USG will not provide fuel for the Contractor’s vehicles or equipment.

3.3 Facilities: The USG will provide a lot or shoreline for overnight/weekend/holiday storage of Contractor’s equipment at RRAD during the duration of this contract.

3.4 Contractor/Employee Screening: RRAD shall vet each person desiring access onto RRAD. Screening shall be done to meet the requirements of RRAD. The Contractor shall provide requested personnel information to the COR at least 48 hours in advance of arriving at RRAD.

PART 4

CONTRACTOR FURNISHED ITEMS AND SERVICES

4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:

4.1 General: The Contractor shall furnish all supplies, equipment, facilities and services required to perform work under this contract that are not listed under Part 3 of this PWS.

4.2 Food and Shelter: The Contractor shall be responsible for providing all employees food and shelter, as necessary. The USG will not provide facilities for shelter under this contract.

4.3 Vehicles and Equipment: The Contractor shall provide vehicles and equipment of sufficient size, type and quantities to support the requirement of this PWS. All vehicles shall be operated in accordance with RRAD traffic regulations. Missing or damaged vehicles shall be replaced or repaired by the Contractor at no additional cost to the USG. The Contractor shall be responsible for all vehicles while in transit inside RRAD.

PART 5

SPECIFIC TASKS

5. Specific Tasks:

5.1. Basic Services. The Contractor shall provide services for aquatic vegetation removal and the disposal of plant and silt waste material at sites designated by RRAD.

5.2. Functions. The contract calls for several basic functions which are required in accordance with its scope. These include:

5.2.1 Remove all vegetation from areas designated by RRAD between the depths of 2’ and 5’.

5.2.2 Transport and dump waste material to onshore sites designated by RRAD. The dump site designated by the COR will be on the Red River Army Depot and will be accessible by truck and loader.

5.3.0 Hours of Operation: The Contractor is responsible for conducting business and providing services in accordance with the contract specifications between the hours of 0600 – 1800. The Contractor shall operate during daylight hours only. The Contractor shall only haul equipment on and off the Depot during days and hours the Commercial Gate is operational, normally Monday – Friday, excluding holidays. Caney Creek Reservoir will be off limits one day per week due to mission requirements. The COR will give the Contractor advanced notice on Monday of each week which weekday the lake will be off limits. This will normally be a Wednesday or Thursday.

5.3.1 Cleaning of Equipment: To help prevent the spread of invasive species, the Contractor shall thoroughly clean equipment before entering the Depot and clean the equipment before departing the Depot.

The COR will inspect equipment before the project commences and just prior to equipment leaving the Depot.

5.3.2 Access to RRAD: The Contractor is responsible to ensure its employees have the proper credentials to access RRAD to perform the contract requirements. In order to obtain entry to RRAD, the Contractor must contact the COR for forms, procedures, and instructions. Failure to follow site specific procedures will result in delay. Delays due to badging shall not be a basis for a claim by the Contractor.

5.3.3 Reporting Noncompliance: Contractor shall immediately report any nonconformance and/or noncompliance with applicable Federal, State or Local environmental laws, Army and installation environmental regulations or policies to the COR.

PART 6

APPLICABLE

PUBLICATIONS

6. APPLICABLE PUBLICATIONS

6.1. The Contractor must abide by all applicable regulations, publications, manuals, and local policies and procedures for the management of solid waste. The Contractor shall be familiar with and understand the applicable rules for the contract and shall abide by all applicable regulations, publications, manuals, and local policies and procedures applicable to this contract. In the event that applicable governing regulations and/or directives conflict, the more stringent of the governing regulations and/or directives shall take precedence.

PART 7

COMPLIANCE WITH ENVIRONMENTAL LAWS AND REGULATIONS

7. COMPLIANCE WITH ENVIRONMENTAL LAWS AND REGULATIONS

7.1 Contractor shall comply with all applicable federal, state, and local environmental laws, statutes, regulations, executive orders, permits, Army regulations (with supplements), as well as Major Subordinate Command (MSC) and installation regulation, policy, Host Tenant Agreement, Interagency Service Support Agreement, or Status-of- Forces Agreement. Contractor shall immediately report any conflicts between applicable federal, state, local environmental laws, statutes, executive orders, and provisions of Army Regulation 200-1, and any specifications within this contract to the Contracting Officer Representative (COR).

PART 8

ATTACHMENT/TECHNICAL EXHIBIT LISTING

8. Attachment/Technical Exhibit List:

8.1 Attachment 1/Technical Exhibit 1 – Performance Requirements Summary

8.2 Attachment2/Technical Exhibit 2 - Map of Subject Area

TECHNICAL EXHIBIT 1

Performance Requirements

Summary The Contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.

Performance Requirement

Performance Standard

Frequency of Measurement

Method of Surveillance

Compliance (Exceptional, Very Good, Satisfactory, or Marginal Satisfactory

Remove aquatic vegetation between the depths of 2’ and 5’, extending out to the outer edge of the floating vegetation.

PWS paragraph number

1.4 to 1.4.3

The Contractor shall provide complete, above ground vegetation removal within the specified depths.

Daily Visual Inspection, GPS

Very Good

Contractor shall load and haul waste plant material and silt to sites designated by the USG. PWS paragraph number 1.4.4

The Contractor shall dispose of 100% of collected plant material at the designated sites.

Daily Visual Inspection

Very Good

Satisfactorily complete the required acreage defined by the USG.

40-60 acres completed by 01 Aug 2019.

Predefined Area Visual Inspection and GPS

Very Good

TECHNICAL EXHIBIT 2

Map of Subject Area

(End of Summary of Changes)