W911RQ-18-R-0268-UPDATED.pdf
PDF 659 KB Posted
- Attached to
- REFUSE COLLECTION & TRANSPORTATION SERVICES
- Solicitation number
- W911RQ-18-R-0268
About this file
SOLICITATION-UPDATED COPY
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W911RQ-18-R-0268 09-Feb-2017
b. TELEPHONE NUMBER
(903)334-4283
8. OFFER DUE DATE/LOCAL TIME
10:00 AM 09 Mar 2018
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W911RQ9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
SANDRA JEAN-LOUIS
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESSX
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
RED RIVER ARMY DEPOT
DIRECTORATE FOR CONTRACTING
100 JAMES CARLOW DRIVE BLDG 431
TEXARKANA TX 75501-5000
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE W911RQ 16. ADMINISTERED BY
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
X SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
RED RIVER ARMY DEPOT
CARMEN OAKLEY
RED RIVER ARMY DEPOT
ENVIRONMENTAL DIVISION
BLDG 303B
TEXARKANA TX 75501
TEL: 903-334-4220 FAX:
FAX:
TEL: SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$38,500,000
NAICS:
562111
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF116
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
W911RQ-18-R-0268
Section SF 1449 - CONTINUATION SHEET
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
BASE YEAR_REFUSE COLLECTION
FFP
Contractor will furnish all equipment, tools, supplies, labor, transportation and supervision for the accomplishment of the collection and hauling of refuse from RRAD, Texarkana, TX, in strict accordance with the Performance Work Statement
(PWS).
Refuse collection will include, but not limited to a range of collection containers from 40 cubic yard (CY) roll-off boxes to compactors; Transportation of refuse to an approved disposal site will require the contractor to comply with Department of Transportation (DOT) and the State of Texas rules and regulations for transporting solid waste. The contractor shall perform to the standards in the contract as well as all Local, State, and Federal regulations
WAGE DETERMINATIONS No: 2015-5146 REVISION 3, POSTED on www.wdol.gov dated 08/03/2017 Area: Arkansas Counties of Little River, Miller Texas County of Bowie
NET AMT
0001AA 59 Each Four (4) Cubic Yard Container
FFP
Four (4) Cubic Yard Container Each Per Month Shall be heavy-duty steel construction that meets or exceeds the standards established by the American National Standards Institute (ANSI) for waste containers as follows: Waste Containers Safety Requirements, 1994, American National Standards Institute, ANSI Z245.30-1994; and Waste Containers Compatibility Dimensions, 1996, American National Standards Institute, ANSI Z245.60-1996 as referenced in 40 Code of Federal Regulations (Guidelines For The Storage And Collection Of Residential, Commercial, And Institutional Solid Waste) 243.200-1.
Containers shall be equipped with a 1-1/2 inch nominal diameter threaded drain and plug on each container and equipped with dual lids and lid handles, with lid-opening assist springs or approved alternates. Interior height shall be 48 inches plus or minus 2 in.
QUANTITY -> TIMES - > UNIT PRICE -> TIMES -> 12 MONTHS = AMOUNT
PER YEAR
QUANTITY x UNIT PRICE x 12 = AMOUNT PER YEAR
FOB: Destination
PSC CD: S205
0001AB 45 Each Eight (8) Cubic Yard Container without S
FFP
Eight (8) Cubic Yard Container Without Sliding Lids Each Per Month.
Shall be heavy-duty steel construction that meets or exceeds the standards established by the American National Standards Institute (ANSI) for waste containers as follows: Waste Containers Safety Requirements, 1994, American National Standards Institute, ANSI Z245.30-1994; and Waste Containers Compatibility Dimensions, 1996, American National Standards Institute, ANSI Z245.60-1996 as referenced in 40 Code of Federal Regulations (Guidelines For The Storage And Collection Of Residential, Commercial, And Institutional Solid Waste) 243.200-1.
Containers shall be equipped with a 1-1/2 inch nominal diameter threaded drain and plug on each container.
QUANTITY -> TIMES - > UNIT PRICE -> TIMES -> 12 MONTHS = AMOUNT
0001AC 45 Each Eight (8) Cubic Yard Container With Slid
FFP
Eight (8) Cubic Yard Container With Sliding Lids Each Per Month.
Shall be heavy-duty steel construction that meets or exceeds the standards established by the American National Standards Institute (ANSI) for waste containers as follows: Waste Containers Safety Requirements, 1994, American National Standards Institute, ANSI Z245.30-1994; and Waste Containers Compatibility Dimensions, 1996, American National Standards Institute, ANSI Z245.60-1996 as referenced in 40 Code of Federal Regulations (Guidelines For The Storage And Collection Of Residential, Commercial, And Institutional Solid Waste) 243.200-1.
Containers shall be equipped with a 1-1/2 inch nominal diameter threaded drain and plug on each container. Each container shall be equipped with 28 in x 28 in or larger sliding doors (with handles) on each end and with one sliding door with an opening of 30 in x 34 in or greater on the rear lid. Alternate dimensions may be submitted for approval.
QUANTITY -> TIMES - > UNIT PRICE -> TIMES -> 12 MONTHS = AMOUNT
0001AD 1 Each Eight (8) Cubic Yard Container Modified
FFP
Eight (8) Cubic Yard Container Modified for Sawdust Collection Each Per Month.
This one (1) container requires a metal lid modified to accept saw dust from a collector system. This will require a minimum of six (6) inch to eight (8) inch diameter opening in the metal lid.
QUANTITY -> TIMES - > UNIT PRICE -> TIMES -> 12 MONTHS = AMOUNT
PER YEAR
QUANTITY x UNIT PRICE x 12 = AMOUNT PER YEAR
0001AE 5 Each Dock load compactor 40-42 CY Co
FFP
Dock Load or Thru-wall Stationary Compactor with 40-42 Cubic Yard Container Each Per Month.
Compactor system shall conform to American National Standards Institute (ANSI) specification Z245.1-84: Safety Requirements for Refuse Collection and Compaction Equipment.
The contractor shall submit written certification to the KO/COR from the equipment manufacturer(s) that the compactor systems being installed for this contract comply with ANSI Z245.1-84, NEMA standards, National Electric Code, and (NFPA 70).
QUANTITY -> TIMES - > UNIT PRICE -> TIMES -> 12 MONTHS = AMOUNT
PER YEAR
QUANTITY x UNIT PRICE x 12 = AMOUNT PER YEAR
0001AF 7 Each End or Side Ground Load S. Compactor
FFP
End or Side Ground Load Stationary Compactor with Roll-Off Each per Month.
The compactor chutes shall be constructed of 10 gauge or thicker steel on top and sides and 1/4 inch steel on bottom and shall be reinforced and anchored to insure structural rigidity. Chutes shall have a 30 in x 48 in or larger inspection door at the charging chamber
QUANTITY -> TIMES - > UNIT PRICE -> TIMES -> 12 MONTHS = AMOUNT
0001AG 5 Each Fifteen (15) Cubic Yard Open Top Roll of
FFP
Fifteen (15) Cubic Yard Open Top Roll off Container Each Per Month.
Roll off containers shall be of heavy-duty steel construction that meets or exceeds the standards established by the American National Standards Institute (ANSI) for waste containers as follows: Waste Containers Safety Requirements, 1994, American National Standards Institute, ANSI Z245.30-1994; and Waste Containers Compatibility Dimensions, 1996, American National Standards Institute, ANSI Z245.60-1996 as referenced in 40 Code of Federal Regulations (Guidelines For The Storage and Collection of Residential, Commercial, And Institutional Solid Waste) 243.200-1.
Containers shall be equipped with a 1-1/2 in nominal diameter threaded drain and plug on each container.
QUANTITY -> TIMES - > UNIT PRICE -> TIMES -> 12 MONTHS = AMOUNT
0001AH 5 Each Forty (40) Cubic Yard Open Top Roll off
FFP
Forty (40) Cubic Yard Open Top Roll off Container Each.
Roll off containers shall be of heavy-duty steel construction that meets or exceeds the standards established by the American National Standards Institute (ANSI) for waste containers as follows: Waste Containers Safety Requirements, 1994, American National Standards Institute, ANSI Z245.30-1994; and Waste Containers Compatibility Dimensions, 1996, American National Standards Institute, ANSI Z245.60-1996 as referenced in 40 Code of Federal Regulations (Guidelines For The Storage And Collection Of Residential, Commercial, And Institutional Solid Waste) 243.200-1.
Containers shall be equipped with a 1-1/2 in nominal diameter threaded drain and plug on each container.
QUANTITY -> TIMES - > UNIT PRICE -> TIMES -> 12 MONTHS = AMOUNT
PER YEAR
QUANTITY x UNIT PRICE x 12 = AMOUNT PER YEAR
0001AJ 25 Each Relocate Red River Managed Roll Off Cont
FFP
Relocate Red River Managed Roll Off Containers ON DEPOT ONLY.
Red River Army Depot maintains a roll-off truck to switch out Red River Managed roll-offs at waste collection sites on depot when they are full. There are occasions when this vehicle is inoperable and the contractor, upon the request of the KO/COR, will be asked to supply this service.
QUANTITY -> TIMES - > UNIT PRICE -> TIMES -> 12 MONTHS = AMOUNT
0001AK 203 Each Transportation of Full Containers to Lan
FFP
Transportation of Full Containers to Landfill.
All containers, except those for sawdust, wood and dust collectors, shall be serviced a minimum of twice each week or frequent enough to provide service before capacity loading is approached. Compactors shall be serviced at a minimum twice each month.
QUANTITY -> TIMES - > UNIT PRICE -> TIMES -> 12 MONTHS = AMOUNT
0001AL 1 Lot
CONTRACTOR MANPOWER SURVEY
FFP
The Office of the Assistant Secretary of the Army (Manpower & Reserve Affairs) operates and maintains a secure Army data collection site where the contractor will report ALL contractor manpower (including subcontractor manpower) required for performance of this contract. The contractor is required to completely fill in all the information in the format using the following web address: https://www.ecmra.mil/
QUANTITY -> TIMES - > UNIT PRICE -> TIMES -> 12 MONTHS = AMOUNT
OPTION FIRST OPTION_REFUSE COLLECTION
FFP
Contractor will furnish all equipment, tools, supplies, labor, transportation and supervision for the accomplishment of the collection and hauling of refuse from RRAD, Texarkana, TX, in strict accordance with the Performance Work Statement
(PWS).
Refuse collection will include, but not limited to a range of collection containers from 40 cubic yard (CY) roll-off boxes to compactors; Transportation of refuse to an approved disposal site will require the contractor to comply with Department of Transportation (DOT) and the State of Texas rules and regulations for transporting solid waste. The contractor shall perform to the standards in the contract as well as all Local, State, and Federal regulations
WAGE DETERMINATIONS No: 2015-5146 REVISION 3, POSTED on www.wdol.gov dated 08/03/2017
1001AA 59 Each OPTION Four (4) Cubic Yard Container
FFP
Four (4) Cubic Yard Container Each Per Month Shall be heavy-duty steel construction that meets or exceeds the standards established by the American National Standards Institute (ANSI) for waste containers as follows: Waste Containers Safety Requirements, 1994, American National Standards Institute, ANSI Z245.30-1994; and Waste Containers Compatibility Dimensions, 1996, American National Standards Institute, ANSI Z245.60-1996 as referenced in 40 Code of Federal Regulations (Guidelines For The Storage And Collection Of Residential, Commercial, And Institutional Solid Waste) 243.200-1.
Containers shall be equipped with a 1-1/2 inch nominal diameter threaded drain and plug on each container and equipped with dual lids and lid handles, with lid-opening assist springs or approved alternates. Interior height shall be 48 inches plus or minus 2 in.
QUANTITY -> TIMES - > UNIT PRICE -> TIMES -> 12 MONTHS = AMOUNT
1001AB 45 Each OPTION Eight (8) Cubic Yard Container without S
FFP
Eight (8) Cubic Yard Container Without Sliding Lids Each Per Month.
Shall be heavy-duty steel construction that meets or exceeds the standards established by the American National Standards Institute (ANSI) for waste containers as follows: Waste Containers Safety Requirements, 1994, American National Standards Institute, ANSI Z245.30-1994; and Waste Containers Compatibility Dimensions, 1996, American National Standards Institute, ANSI Z245.60-1996 as referenced in 40 Code of Federal Regulations (Guidelines For The Storage And Collection Of Residential, Commercial, And Institutional Solid Waste) 243.200-1.
Containers shall be equipped with a 1-1/2 inch nominal diameter threaded drain and plug on each container.
QUANTITY -> TIMES - > UNIT PRICE -> TIMES -> 12 MONTHS = AMOUNT
1001AC 45 Each OPTION Eight (8) Cubic Yard Container With Slid
FFP
Eight (8) Cubic Yard Container With Sliding Lids Each Per Month.
Shall be heavy-duty steel construction that meets or exceeds the standards established by the American National Standards Institute (ANSI) for waste containers as follows: Waste Containers Safety Requirements, 1994, American National Standards Institute, ANSI Z245.30-1994; and Waste Containers Compatibility Dimensions, 1996, American National Standards Institute, ANSI Z245.60-1996 as referenced in 40 Code of Federal Regulations (Guidelines For The Storage And Collection Of Residential, Commercial, And Institutional Solid Waste) 243.200-1.
Containers shall be equipped with a 1-1/2 inch nominal diameter threaded drain and plug on each container. Each container shall be equipped with 28 in x 28 in or larger sliding doors (with handles) on each end and with one sliding door with an opening of 30 in x 34 in or greater on the rear lid. Alternate dimensions may be submitted for approval.
QUANTITY -> TIMES - > UNIT PRICE -> TIMES -> 12 MONTHS = AMOUNT
1001AD 1 Each OPTION Eight (8) Cubic Yard Container Modified
FFP
Eight (8) Cubic Yard Container Modified for Sawdust Collection Each Per Month.
This one (1) container requires a metal lid modified to accept saw dust from a collector system. This will require a minimum of six (6) inch to eight (8) inch diameter opening in the metal lid.
QUANTITY -> TIMES - > UNIT PRICE -> TIMES -> 12 MONTHS = AMOUNT
PER YEAR
QUANTITY x UNIT PRICE x 12 = AMOUNT PER YEAR
1001AE 5 Each OPTION Dock load compactor 40-42 CY Co
FFP
Dock Load or Thru-wall Stationary Compactor with 40-42 Cubic Yard Container Each Per Month.
Compactor system shall conform to American National Standards Institute (ANSI) specification Z245.1-84: Safety Requirements for Refuse Collection and Compaction Equipment.
The contractor shall submit written certification to the KO/COR from the equipment manufacturer(s) that the compactor systems being installed for this contract comply with ANSI Z245.1-84, NEMA standards, National Electric Code, and (NFPA 70).
QUANTITY -> TIMES - > UNIT PRICE -> TIMES -> 12 MONTHS = AMOUNT
PER YEAR
QUANTITY x UNIT PRICE x 12 = AMOUNT PER YEAR
1001AF 7 Each OPTION End or Side Ground Load S. Compactor
FFP
End or Side Ground Load Stationary Compactor with Roll-Off Each per Month.
The compactor chutes shall be constructed of 10 gauge or thicker steel on top and sides and 1/4 inch steel on bottom and shall be reinforced and anchored to insure structural rigidity. Chutes shall have a 30 in x 48 in or larger inspection door at the charging chamber
QUANTITY -> TIMES - > UNIT PRICE -> TIMES -> 12 MONTHS = AMOUNT
1001AG 5 Each OPTION Fifteen (15) Cubic Yard Open Top Roll of
FFP
Fifteen (15) Cubic Yard Open Top Roll off Container Each Per Month.
Roll off containers shall be of heavy-duty steel construction that meets or exceeds the standards established by the American National Standards Institute (ANSI) for waste containers as follows: Waste Containers Safety Requirements, 1994, American National Standards Institute, ANSI Z245.30-1994; and Waste Containers Compatibility Dimensions, 1996, American National Standards Institute, ANSI Z245.60-1996 as referenced in 40 Code of Federal Regulations (Guidelines For The Storage and Collection of Residential, Commercial, And Institutional Solid Waste) 243.200-1.
Containers shall be equipped with a 1-1/2 in nominal diameter threaded drain and plug on each container.
QUANTITY -> TIMES - > UNIT PRICE -> TIMES -> 12 MONTHS = AMOUNT
1001AH 5 Each OPTION Forty (40) Cubic Yard Open Top Roll off
FFP
Forty (40) Cubic Yard Open Top Roll off Container Each.
Roll off containers shall be of heavy-duty steel construction that meets or exceeds the standards established by the American National Standards Institute (ANSI) for waste containers as follows: Waste Containers Safety Requirements, 1994, American National Standards Institute, ANSI Z245.30-1994; and Waste Containers Compatibility Dimensions, 1996, American National Standards Institute, ANSI Z245.60-1996 as referenced in 40 Code of Federal Regulations (Guidelines For The Storage And Collection Of Residential, Commercial, And Institutional Solid Waste) 243.200-1.
Containers shall be equipped with a 1-1/2 in nominal diameter threaded drain and plug on each container.
QUANTITY -> TIMES - > UNIT PRICE -> TIMES -> 12 MONTHS = AMOUNT
PER YEAR
QUANTITY x UNIT PRICE x 12 = AMOUNT PER YEAR
1001AJ 25 Each OPTION Relocate Red River Managed Roll Off Cont
FFP
Relocate Red River Managed Roll Off Containers ON DEPOT ONLY.
Red River Army Depot maintains a roll-off truck to switch out Red River Managed roll-offs at waste collection sites on depot when they are full. There are occasions when this vehicle is inoperable and the contractor, upon the request of the KO/COR, will be asked to supply this service.
QUANTITY -> TIMES - > UNIT PRICE -> TIMES -> 12 MONTHS = AMOUNT
1001AK 203 Each OPTION Transportation of Full Containers to Lan
FFP
Transportation of Full Containers to Landfill.
All containers, except those for sawdust, wood and dust collectors, shall be serviced a minimum of twice each week or frequent enough to provide service before capacity loading is approached. Compactors shall be serviced at a minimum twice each month.
QUANTITY -> TIMES - > UNIT PRICE -> TIMES -> 12 MONTHS = AMOUNT
1001AL 1 Lot
OPTION CONTRACTOR MANPOWER SURVEY
FFP
The Office of the Assistant Secretary of the Army (Manpower & Reserve Affairs) operates and maintains a secure Army data collection site where the contractor will report ALL contractor manpower (including subcontractor manpower) required for performance of this contract. The contractor is required to completely fill in all the information in the format using the following web address: https://www.ecmra.mil/
QUANTITY -> TIMES - > UNIT PRICE -> TIMES -> 12 MONTHS = AMOUNT
OPTION SECOND OPTION_REFUSE COLLECTION
FFP
Contractor will furnish all equipment, tools, supplies, labor, transportation and supervision for the accomplishment of the collection and hauling of refuse from RRAD, Texarkana, TX, in strict accordance with the Performance Work Statement
(PWS).
Refuse collection will include, but not limited to a range of collection containers from 40 cubic yard (CY) roll-off boxes to compactors; Transportation of refuse to an approved disposal site will require the contractor to comply with Department of Transportation (DOT) and the State of Texas rules and regulations for transporting solid waste. The contractor shall perform to the standards in the contract as well as all Local, State, and Federal regulations
WAGE DETERMINATIONS No: 2015-5146 REVISION 3, POSTED on www.wdol.gov dated 08/03/2017
2001AA 59 Each OPTION Four (4) Cubic Yard Container
FFP
Four (4) Cubic Yard Container Each Per Month Shall be heavy-duty steel construction that meets or exceeds the standards established by the American National Standards Institute (ANSI) for waste containers as follows: Waste Containers Safety Requirements, 1994, American National Standards Institute, ANSI Z245.30-1994; and Waste Containers Compatibility Dimensions, 1996, American National Standards Institute, ANSI Z245.60-1996 as referenced in 40 Code of Federal Regulations (Guidelines For The Storage And Collection Of Residential, Commercial, And Institutional Solid Waste) 243.200-1.
Containers shall be equipped with a 1-1/2 inch nominal diameter threaded drain and plug on each container and equipped with dual lids and lid handles, with lid-opening assist springs or approved alternates. Interior height shall be 48 inches plus or minus 2 in.
QUANTITY -> TIMES - > UNIT PRICE -> TIMES -> 12 MONTHS = AMOUNT
2001AB 45 Each OPTION Eight (8) Cubic Yard Container without S
FFP
Eight (8) Cubic Yard Container Without Sliding Lids Each Per Month.
Shall be heavy-duty steel construction that meets or exceeds the standards established by the American National Standards Institute (ANSI) for waste containers as follows: Waste Containers Safety Requirements, 1994, American National Standards Institute, ANSI Z245.30-1994; and Waste Containers Compatibility Dimensions, 1996, American National Standards Institute, ANSI Z245.60-1996 as referenced in 40 Code of Federal Regulations (Guidelines For The Storage And Collection Of Residential, Commercial, And Institutional Solid Waste) 243.200-1.
Containers shall be equipped with a 1-1/2 inch nominal diameter threaded drain and plug on each container.
QUANTITY -> TIMES - > UNIT PRICE -> TIMES -> 12 MONTHS = AMOUNT
2001AC 45 Each OPTION Eight (8) Cubic Yard Container With Slid
FFP
Eight (8) Cubic Yard Container With Sliding Lids Each Per Month.
Shall be heavy-duty steel construction that meets or exceeds the standards established by the American National Standards Institute (ANSI) for waste containers as follows: Waste Containers Safety Requirements, 1994, American National Standards Institute, ANSI Z245.30-1994; and Waste Containers Compatibility Dimensions, 1996, American National Standards Institute, ANSI Z245.60-1996 as referenced in 40 Code of Federal Regulations (Guidelines For The Storage And Collection Of Residential, Commercial, And Institutional Solid Waste) 243.200-1.
Containers shall be equipped with a 1-1/2 inch nominal diameter threaded drain and plug on each container. Each container shall be equipped with 28 in x 28 in or larger sliding doors (with handles) on each end and with one sliding door with an opening of 30 in x 34 in or greater on the rear lid. Alternate dimensions may be submitted for approval.
QUANTITY -> TIMES - > UNIT PRICE -> TIMES -> 12 MONTHS = AMOUNT
2001AD 1 Each OPTION Eight (8) Cubic Yard Container Modified
FFP
Eight (8) Cubic Yard Container Modified for Sawdust Collection Each Per Month.
This one (1) container requires a metal lid modified to accept saw dust from a collector system. This will require a minimum of six (6) inch to eight (8) inch diameter opening in the metal lid.
QUANTITY -> TIMES - > UNIT PRICE -> TIMES -> 12 MONTHS = AMOUNT
PER YEAR
QUANTITY x UNIT PRICE x 12 = AMOUNT PER YEAR
2001AE 5 Each OPTION Dock load compactor 40-42 CY Co
FFP
Dock Load or Thru-wall Stationary Compactor with 40-42 Cubic Yard Container Each Per Month.
Compactor system shall conform to American National Standards Institute (ANSI) specification Z245.1-84: Safety Requirements for Refuse Collection and Compaction Equipment.
The contractor shall submit written certification to the KO/COR from the equipment manufacturer(s) that the compactor systems being installed for this contract comply with ANSI Z245.1-84, NEMA standards, National Electric Code, and (NFPA 70).
QUANTITY -> TIMES - > UNIT PRICE -> TIMES -> 12 MONTHS = AMOUNT
PER YEAR
QUANTITY x UNIT PRICE x 12 = AMOUNT PER YEAR
2001AF 7 Each OPTION End or Side Ground Load S. Compactor
FFP
End or Side Ground Load Stationary Compactor with Roll-Off Each per Month.
The compactor chutes shall be constructed of 10 gauge or thicker steel on top and sides and 1/4 inch steel on bottom and shall be reinforced and anchored to insure structural rigidity. Chutes shall have a 30 in x 48 in or larger inspection door at the charging chamber
QUANTITY -> TIMES - > UNIT PRICE -> TIMES -> 12 MONTHS = AMOUNT
2001AG 5 Each OPTION Fifteen (15) Cubic Yard Open Top Roll of
FFP
Fifteen (15) Cubic Yard Open Top Roll off Container Each Per Month.
Roll off containers shall be of heavy-duty steel construction that meets or exceeds the standards established by the American National Standards Institute (ANSI) for waste containers as follows: Waste Containers Safety Requirements, 1994, American National Standards Institute, ANSI Z245.30-1994; and Waste Containers Compatibility Dimensions, 1996, American National Standards Institute, ANSI Z245.60-1996 as referenced in 40 Code of Federal Regulations (Guidelines For The Storage and Collection of Residential, Commercial, And Institutional Solid Waste) 243.200-1.
Containers shall be equipped with a 1-1/2 in nominal diameter threaded drain and plug on each container.
QUANTITY -> TIMES - > UNIT PRICE -> TIMES -> 12 MONTHS = AMOUNT
2001AH 5 Each OPTION Forty (40) Cubic Yard Open Top Roll off
FFP
Forty (40) Cubic Yard Open Top Roll off Container Each.
Roll off containers shall be of heavy-duty steel construction that meets or exceeds the standards established by the American National Standards Institute (ANSI) for waste containers as follows: Waste Containers Safety Requirements, 1994, American National Standards Institute, ANSI Z245.30-1994; and Waste Containers Compatibility Dimensions, 1996, American National Standards Institute, ANSI Z245.60-1996 as referenced in 40 Code of Federal Regulations (Guidelines For The Storage And Collection Of Residential, Commercial, And Institutional Solid Waste) 243.200-1.
Containers shall be equipped with a 1-1/2 in nominal diameter threaded drain and plug on each container.
QUANTITY -> TIMES - > UNIT PRICE -> TIMES -> 12 MONTHS = AMOUNT
PER YEAR
QUANTITY x UNIT PRICE x 12 = AMOUNT PER YEAR
2001AJ 25 Each OPTION Relocate Red River Managed Roll Off Cont
FFP
Relocate Red River Managed Roll Off Containers ON DEPOT ONLY.
Red River Army Depot maintains a roll-off truck to switch out Red River Managed roll-offs at waste collection sites on depot when they are full. There are occasions when this vehicle is inoperable and the contractor, upon the request of the KO/COR, will be asked to supply this service.
QUANTITY -> TIMES - > UNIT PRICE -> TIMES -> 12 MONTHS = AMOUNT
2001AK 203 Each OPTION Transportation of Full Containers to Lan
FFP
Transportation of Full Containers to Landfill.
All containers, except those for sawdust, wood and dust collectors, shall be serviced a minimum of twice each week or frequent enough to provide service before capacity loading is approached. Compactors shall be serviced at a minimum twice each month.
QUANTITY -> TIMES - > UNIT PRICE -> TIMES -> 12 MONTHS = AMOUNT
2001AL 1 Lot
OPTION CONTRACTOR MANPOWER SURVEY
FFP
The Office of the Assistant Secretary of the Army (Manpower & Reserve Affairs) operates and maintains a secure Army data collection site where the contractor will report ALL contractor manpower (including subcontractor manpower) required for performance of this contract. The contractor is required to completely fill in all the information in the format using the following web address: https://www.ecmra.mil/
QUANTITY -> TIMES - > UNIT PRICE -> TIMES -> 12 MONTHS = AMOUNT
OPTION THIRD OPTION_REFUSE COLLECTION
FFP
Contractor will furnish all equipment, tools, supplies, labor, transportation and supervision for the accomplishment of the collection and hauling of refuse from RRAD, Texarkana, TX, in strict accordance with the Performance Work Statement
(PWS).
Refuse collection will include, but not limited to a range of collection containers from 40 cubic yard (CY) roll-off boxes to compactors; Transportation of refuse to an approved disposal site will require the contractor to comply with Department of Transportation (DOT) and the State of Texas rules and regulations for transporting solid waste. The contractor shall perform to the standards in the contract as well as all Local, State, and Federal regulations
WAGE DETERMINATIONS No: 2015-5146 REVISION 3, POSTED on www.wdol.gov dated 08/03/2017
3001AA 59 Each OPTION Four (4) Cubic Yard Container
FFP
Four (4) Cubic Yard Container Each Per Month Shall be heavy-duty steel construction that meets or exceeds the standards established by the American National Standards Institute (ANSI) for waste containers as follows: Waste Containers Safety Requirements, 1994, American National Standards Institute, ANSI Z245.30-1994; and Waste Containers Compatibility Dimensions, 1996, American National Standards Institute, ANSI Z245.60-1996 as referenced in 40 Code of Federal Regulations (Guidelines For The Storage And Collection Of Residential, Commercial, And Institutional Solid Waste) 243.200-1.
Containers shall be equipped with a 1-1/2 inch nominal diameter threaded drain and plug on each container and equipped with dual lids and lid handles, with lid-opening assist springs or approved alternates. Interior height shall be 48 inches plus or minus 2 in.
QUANTITY -> TIMES - > UNIT PRICE -> TIMES -> 12 MONTHS = AMOUNT
3001AB 45 Each OPTION Eight (8) Cubic Yard Container without S
FFP
Eight (8) Cubic Yard Container Without Sliding Lids Each Per Month.
Shall be heavy-duty steel construction that meets or exceeds the standards established by the American National Standards Institute (ANSI) for waste containers as follows: Waste Containers Safety Requirements, 1994, American National Standards Institute, ANSI Z245.30-1994; and Waste Containers Compatibility Dimensions, 1996, American National Standards Institute, ANSI Z245.60-1996 as referenced in 40 Code of Federal Regulations (Guidelines For The Storage And Collection Of Residential, Commercial, And Institutional Solid Waste) 243.200-1.
Containers shall be equipped with a 1-1/2 inch nominal diameter threaded drain and plug on each container.
QUANTITY -> TIMES - > UNIT PRICE -> TIMES -> 12 MONTHS = AMOUNT
3001AC 45 Each OPTION Eight (8) Cubic Yard Container With Slid
FFP
Eight (8) Cubic Yard Container With Sliding Lids Each Per Month.
Shall be heavy-duty steel construction that meets or exceeds the standards established by the American National Standards Institute (ANSI) for waste containers as follows: Waste Containers Safety Requirements, 1994, American National Standards Institute, ANSI Z245.30-1994; and Waste Containers Compatibility Dimensions, 1996, American National Standards Institute, ANSI Z245.60-1996 as referenced in 40 Code of Federal Regulations (Guidelines For The Storage And Collection Of Residential, Commercial, And Institutional Solid Waste) 243.200-1.
Containers shall be equipped with a 1-1/2 inch nominal diameter threaded drain and plug on each container. Each container shall be equipped with 28 in x 28 in or larger sliding doors (with handles) on each end and with one sliding door with an opening of 30 in x 34 in or greater on the rear lid. Alternate dimensions may be submitted for approval.
QUANTITY -> TIMES - > UNIT PRICE -> TIMES -> 12 MONTHS = AMOUNT
3001AD 1 Each OPTION Eight (8) Cubic Yard Container Modified
FFP
Eight (8) Cubic Yard Container Modified for Sawdust Collection Each Per Month.
This one (1) container requires a metal lid modified to accept saw dust from a collector system. This will require a minimum of six (6) inch to eight (8) inch diameter opening in the metal lid.
QUANTITY -> TIMES - > UNIT PRICE -> TIMES -> 12 MONTHS = AMOUNT
PER YEAR
QUANTITY x UNIT PRICE x 12 = AMOUNT PER YEAR
3001AE 5 Each OPTION Dock load compactor 40-42 CY Co
FFP
Dock Load or Thru-wall Stationary Compactor with 40-42 Cubic Yard Container Each Per Month.
Compactor system shall conform to American National Standards Institute (ANSI) specification Z245.1-84: Safety Requirements for Refuse Collection and Compaction Equipment.
The contractor shall submit written certification to the KO/COR from the equipment manufacturer(s) that the compactor systems being installed for this contract comply with ANSI Z245.1-84, NEMA standards, National Electric Code, and (NFPA 70).
QUANTITY -> TIMES - > UNIT PRICE -> TIMES -> 12 MONTHS = AMOUNT
PER YEAR
QUANTITY x UNIT PRICE x 12 = AMOUNT PER YEAR
3001AF 7 Each OPTION End or Side Ground Load S. Compactor
FFP
End or Side Ground Load Stationary Compactor with Roll-Off Each per Month.
The compactor chutes shall be constructed of 10 gauge or thicker steel on top and sides and 1/4 inch steel on bottom and shall be reinforced and anchored to insure structural rigidity. Chutes shall have a 30 in x 48 in or larger inspection door at the charging chamber
QUANTITY -> TIMES - > UNIT PRICE -> TIMES -> 12 MONTHS = AMOUNT
3001AG 5 Each OPTION Fifteen (15) Cubic Yard Open Top Roll of
FFP
Fifteen (15) Cubic Yard Open Top Roll off Container Each Per Month.
Roll off containers shall be of heavy-duty steel construction that meets or exceeds the standards established by the American National Standards Institute (ANSI) for waste containers as follows: Waste Containers Safety Requirements, 1994, American National Standards Institute, ANSI Z245.30-1994; and Waste Containers Compatibility Dimensions, 1996, American National Standards Institute, ANSI Z245.60-1996 as referenced in 40 Code of Federal Regulations (Guidelines For The Storage and Collection of Residential, Commercial, And Institutional Solid Waste) 243.200-1.
Containers shall be equipped with a 1-1/2 in nominal diameter threaded drain and plug on each container.
QUANTITY -> TIMES - > UNIT PRICE -> TIMES -> 12 MONTHS = AMOUNT
3001AH 5 Each OPTION Forty (40) Cubic Yard Open Top Roll off
FFP
Forty (40) Cubic Yard Open Top Roll off Container Each.
Roll off containers shall be of heavy-duty steel construction that meets or exceeds the standards established by the American National Standards Institute (ANSI) for waste containers as follows: Waste Containers Safety Requirements, 1994, American National Standards Institute, ANSI Z245.30-1994; and Waste Containers Compatibility Dimensions, 1996, American National Standards Institute, ANSI Z245.60-1996 as referenced in 40 Code of Federal Regulations (Guidelines For The Storage And Collection Of Residential, Commercial, And Institutional Solid Waste) 243.200-1.
Containers shall be equipped with a 1-1/2 in nominal diameter threaded drain and plug on each container.
QUANTITY -> TIMES - > UNIT PRICE -> TIMES -> 12 MONTHS = AMOUNT
PER YEAR
QUANTITY x UNIT PRICE x 12 = AMOUNT PER YEAR
3001AJ 25 Each OPTION Relocate Red River Managed Roll Off Cont
FFP
Relocate Red River Managed Roll Off Containers ON DEPOT ONLY.
Red River Army Depot maintains a roll-off truck to switch out Red River Managed roll-offs at waste collection sites on depot when they are full. There are occasions when this vehicle is inoperable and the contractor, upon the request of the KO/COR, will be asked to supply this service.
QUANTITY -> TIMES - > UNIT PRICE -> TIMES -> 12 MONTHS = AMOUNT
3001AK 203 Each OPTION Transportation of Full Containers to Lan
FFP
Transportation of Full Containers to Landfill.
All containers, except those for sawdust, wood and dust collectors, shall be serviced a minimum of twice each week or frequent enough to provide service before capacity loading is approached. Compactors shall be serviced at a minimum twice each month.
QUANTITY -> TIMES - > UNIT PRICE -> TIMES -> 12 MONTHS = AMOUNT
3001AL 1 Lot
OPTION CONTRACTOR MANPOWER SURVEY
FFP
The Office of the Assistant Secretary of the Army (Manpower & Reserve Affairs) operates and maintains a secure Army data collection site where the contractor will report ALL contractor manpower (including subcontractor manpower) required for performance of this contract. The contractor is required to completely fill in all the information in the format using the following web address: https://www.ecmra.mil/
QUANTITY -> TIMES - > UNIT PRICE -> TIMES -> 12 MONTHS = AMOUNT
OPTION FOURTH OPTION_REFUSE COLLECTION
FFP
Contractor will furnish all equipment, tools, supplies, labor, transportation and supervision for the accomplishment of the collection and hauling of refuse from RRAD, Texarkana, TX, in strict accordance with the Performance Work Statement
(PWS).
Refuse collection will include, but not limited to a range of collection containers from 40 cubic yard (CY) roll-off boxes to compactors; Transportation of refuse to an approved disposal site will require the contractor to comply with Department of Transportation (DOT) and the State of Texas rules and regulations for transporting solid waste. The contractor shall perform to the standards in the contract as well as all Local, State, and Federal regulations
WAGE DETERMINATIONS No: 2015-5146 REVISION 3, POSTED on www.wdol.gov dated 08/03/2017
4001AA 59 Each OPTION Four (4) Cubic Yard Container
FFP
Four (4) Cubic Yard Container Each Per Month Shall be heavy-duty steel construction that meets or exceeds the standards established by the American National Standards Institute (ANSI) for waste containers as follows: Waste Containers Safety Requirements, 1994, American National Standards Institute, ANSI Z245.30-1994; and Waste Containers Compatibility Dimensions, 1996, American National Standards Institute, ANSI Z245.60-1996 as referenced in 40 Code of Federal Regulations (Guidelines For The Storage And Collection Of Residential, Commercial, And Institutional Solid Waste) 243.200-1.
Containers shall be equipped with a 1-1/2 inch nominal diameter threaded drain and plug on each container and equipped with dual lids and lid handles, with lid-opening assist springs or approved alternates. Interior height shall be 48 inches plus or minus 2 in.
QUANTITY -> TIMES - > UNIT PRICE -> TIMES -> 12 MONTHS = AMOUNT
4001AB 45 Each OPTION Eight (8) Cubic Yard Container without S
FFP
Eight (8) Cubic Yard Container Without Sliding Lids Each Per Month.
Shall be heavy-duty steel construction that meets or exceeds the standards established by the American National Standards Institute (ANSI) for waste containers as follows: Waste Containers Safety Requirements, 1994, American National Standards Institute, ANSI Z245.30-1994; and Waste Containers Compatibility Dimensions, 1996, American National Standards Institute, ANSI Z245.60-1996 as referenced in 40 Code of Federal Regulations (Guidelines For The Storage And Collection Of Residential, Commercial, And Institutional Solid Waste) 243.200-1.
Containers shall be equipped with a 1-1/2 inch nominal diameter threaded drain and plug on each container.
QUANTITY -> TIMES - > UNIT PRICE -> TIMES -> 12 MONTHS = AMOUNT
4001AC 45 Each OPTION Eight (8) Cubic Yard Container With Slid
FFP
Eight (8) Cubic Yard Container With Sliding Lids Each Per Month.
Shall be heavy-duty steel construction that meets or exceeds the standards established by the American National Standards Institute (ANSI) for waste containers as follows: Waste Containers Safety Requirements, 1994, American National Standards Institute, ANSI Z245.30-1994; and Waste Containers Compatibility Dimensions, 1996, American National Standards Institute, ANSI Z245.60-1996 as referenced in 40 Code of Federal Regulations (Guidelines For The Storage And Collection Of Residential, Commercial, And Institutional Solid Waste) 243.200-1.
Containers shall be equipped with a 1-1/2 inch nominal diameter threaded drain and plug on each container. Each container shall be equipped with 28 in x 28 in or larger sliding doors (with handles) on each end and with one sliding door with an opening of 30 in x 34 in or greater on the rear lid. Alternate dimensions may be submitted for approval.
QUANTITY -> TIMES - > UNIT PRICE -> TIMES -> 12 MONTHS = AMOUNT
4001AD 1 Each OPTION Eight (8) Cubic Yard Container Modified
FFP
Eight (8) Cubic Yard Container Modified for Sawdust Collection Each Per Month.
This one (1) container requires a metal lid modified to accept saw dust from a collector system. This will require a minimum of six (6) inch to eight (8) inch diameter opening in the metal lid.
QUANTITY -> TIMES - > UNIT PRICE -> TIMES -> 12 MONTHS = AMOUNT
PER YEAR
QUANTITY x UNIT PRICE x 12 = AMOUNT PER YEAR
4001AE 5 Each OPTION Dock load compactor 40-42 CY Co
FFP
Dock Load or Thru-wall Stationary Compactor with 40-42 Cubic Yard Container Each Per Month.
Compactor system shall conform to American National Standards Institute (ANSI) specification Z245.1-84: Safety Requirements for Refuse Collection and Compaction Equipment.
The contractor shall submit written certification to the KO/COR from the equipment manufacturer(s) that the compactor systems being installed for this contract comply with ANSI Z245.1-84, NEMA standards, National Electric Code, and (NFPA 70).
QUANTITY -> TIMES - > UNIT PRICE -> TIMES -> 12 MONTHS = AMOUNT
PER YEAR
QUANTITY x UNIT PRICE x 12 = AMOUNT PER YEAR
4001AF 7 Each OPTION End or Side Ground Load S. Compactor
FFP
End or Side Ground Load Stationary Compactor with Roll-Off Each per Month.
The compactor chutes shall be constructed of 10 gauge or thicker steel on top and sides and 1/4 inch steel on bottom and shall be reinforced and anchored to insure structural rigidity. Chutes shall have a 30 in x 48 in or larger inspection door at the charging chamber
QUANTITY -> TIMES - > UNIT PRICE -> TIMES -> 12 MONTHS = AMOUNT
4001AG 5 Each OPTION Fifteen (15) Cubic Yard Open Top Roll of
FFP
Fifteen (15) Cubic Yard Open Top Roll off Container Each Per Month.
Roll off containers shall be of heavy-duty steel construction that meets or exceeds the standards established by the American National Standards Institute (ANSI) for waste containers as follows: Waste Containers Safety Requirements, 1994, American National Standards Institute, ANSI Z245.30-1994; and Waste Containers Compatibility Dimensions, 1996, American National Standards Institute, ANSI Z245.60-1996 as referenced in 40 Code of Federal Regulations (Guidelines For The Storage and Collection of Residential, Commercial, And Institutional Solid Waste) 243.200-1.
Containers shall be equipped with a 1-1/2 in nominal diameter threaded drain and plug on each container.
QUANTITY -> TIMES - > UNIT PRICE -> TIMES -> 12 MONTHS = AMOUNT
4001AH 5 Each OPTION Forty (40) Cubic Yard Open Top Roll off
FFP
Forty (40) Cubic Yard Open Top Roll off Container Each.
Roll off containers shall be of heavy-duty steel construction that meets or exceeds the standards established by the American National Standards Institute (ANSI) for waste containers as follows: Waste Containers Safety Requirements, 1994, American National Standards Institute, ANSI Z245.30-1994; and Waste Containers Compatibility Dimensions, 1996, American National Standards Institute, ANSI Z245.60-1996 as referenced in 40 Code of Federal Regulations (Guidelines For The Storage And Collection Of Residential, Commercial, And Institutional Solid Waste) 243.200-1.
Containers shall be equipped with a 1-1/2 in nominal diameter threaded drain and plug on each container.
QUANTITY -> TIMES - > UNIT PRICE -> TIMES -> 12 MONTHS = AMOUNT
PER YEAR
QUANTITY x UNIT PRICE x 12 = AMOUNT PER YEAR
4001AJ 25 Each OPTION Relocate Red River Managed Roll Off Cont
FFP
Relocate Red River Managed Roll Off Containers ON DEPOT ONLY.
Red River Army Depot maintains a roll-off truck to switch out Red River Managed roll-offs at waste collection sites on depot when they are full. There are occasions when this vehicle is inoperable and the contractor, upon the request of the KO/COR, will be asked to supply this service.
QUANTITY -> TIMES - > UNIT PRICE -> TIMES -> 12 MONTHS = AMOUNT
4001AK 203 Each OPTION Transportation of Full Containers to Lan
FFP
Transportation of Full Containers to Landfill.
All containers, except those for sawdust, wood and dust collectors, shall be serviced a minimum of twice each week or frequent enough to provide service before capacity loading is approached. Compactors shall be serviced at a minimum twice each month.
QUANTITY -> TIMES - > UNIT PRICE -> TIMES -> 12 MONTHS = AMOUNT
4001AL 1 Lot
OPTION CONTRACTOR MANPOWER SURVEY
FFP
The Office of the Assistant Secretary of the Army (Manpower & Reserve Affairs) operates and maintains a secure Army data collection site where the contractor will report ALL contractor manpower (including subcontractor manpower) required for performance of this contract. The contractor is required to completely fill in all the information in the format using the following web address: https://www.ecmra.mil/
QUANTITY -> TIMES - > UNIT PRICE -> TIMES -> 12 MONTHS = AMOUNT
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 N/A N/A N/A N/A 0001AA Destination Government Destination Government 0001AB Destination Government Destination Government 0001AC Destination Government Destination Government 0001AD Destination Government Destination Government 0001AE Destination Government Destination Government 0001AF Destination Government Destination Government 0001AG Destination Government Destination Government 0001AH Destination Government Destination Government 0001AJ Destination Government Destination Government 0001AK Destination Government Destination Government 0001AL Destination Government Destination Government 1001 N/A N/A N/A N/A
1001AA Destination Government Destination Government 1001AB Destination Government Destination Government 1001AC Destination Government Destination Government 1001AD Destination Government Destination Government 1001AE Destination Government Destination Government 1001AF Destination Government Destination Government 1001AG Destination Government Destination Government 1001AH Destination Government Destination Government 1001AJ Destination Government Destination Government 1001AK Destination Government Destination Government 1001AL Destination Government Destination Government 2001 N/A N/A N/A N/A 2001AA Destination Government Destination Government 2001AB Destination Government Destination Government 2001AC Destination Government Destination Government 2001AD Destination Government Destination Government 2001AE Destination Government Destination Government 2001AF Destination Government Destination Government 2001AG Destination Government Destination Government 2001AH Destination Government Destination Government 2001AJ Destination Government Destination Government 2001AK Destination Government Destination Government 2001AL Destination Government Destination Government 3001 N/A N/A N/A N/A 3001AA Destination Government Destination Government 3001AB Destination Government Destination Government 3001AC Destination Government Destination Government 3001AD Destination Government Destination Government 3001AE Destination Government Destination Government 3001AF Destination Government Destination Government 3001AG Destination Government Destination Government 3001AH Destination Government Destination Government 3001AJ Destination Government Destination Government 3001AK Destination Government Destination Government 3001AL Destination Government Destination Government 4001 N/A N/A N/A N/A 4001AA Destination Government Destination Government 4001AB Destination Government Destination Government 4001AC Destination Government Destination Government 4001AD Destination Government Destination Government 4001AE Destination Government Destination Government 4001AF Destination Government Destination Government 4001AG Destination Government Destination Government 4001AH Destination Government Destination Government 4001AJ Destination Government Destination Government 4001AK Destination Government Destination Government 4001AL Destination Government Destination Government
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 N/A N/A N/A N/A
0001AA POP 22-AUG-2018 TO
21-AUG-2019
N/A RED RIVER ARMY DEPOT
CARMEN OAKLEY
RED RIVER ARMY DEPOT
ENVIRONMENTAL DIVISION
BLDG 303B
TEXARKANA TX 75501
903-334-4220
W911RQ
0001AB POP 22-AUG-2018 TO
21-AUG-2019
N/A (SAME AS PREVIOUS LOCATION)
0001AC POP 22-AUG-2018 TO
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.