A01_-_DD1423.doc
DOC document 222 KB Posted
- Attached to
- Pre-Solicitation Notice Waste Stream Management
- Solicitation number
- W911QX-15-T-0130
About this file
DD 1423
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A07_-_Solicitation.pdf | ||
| A01_-_PWS.docx | DOCX document | |
| A07_-_Evaluation_Criteria.doc | DOC document | |
| A01_-_DD1423_(For_Posting).doc | DOC document | |
| RefuseDiversionRates2012-2014.docx | DOCX document | |
| A07_-_Evaluation_Criteria.doc | DOC document | |
| A07_-_Solicitation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-1088). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TDP_____ TM ______ OTHER: MISC
D. SYSTEM/ITEM
Refuse Removal with Waste Stream Diversion
E. CONTRACT/PR NO.
W911QX-15-T-0130
F. CONTRACTOR
1. DATA ITEM NO.
A001
2. TITLE OF DATA ITEM
Status Report
3. SUBTITLE
Monthly Status Report
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-80368A
5. CONTRACT REFERENCE
Base PWS C.4.1
6. REQUIRING OFFICE
IMAL-PWF
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
A
10. FREQUENCY
MTHLY
12. DATE OF FIRST SUBMISSION
BLK 16
14.
DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION BLK 16
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
BLK 4: IN ADDITION TO PAPER COPIES, EACH REPORT SHALL BE DELIVERED ELECTRONICALLY IN A MEDIA SELECTED BY THE GOVERNMENT AT TIME OF DELIVERY. MEDIA TYPES WHICH CAN BE ACCEPTED INCLUDE: FILE TRANSFER PROTOCOL (FTP), CD-ROM AND DVD-ROM.
BLK 12: THE CONTRACTOR SHALL DELIVER THE FIRST MONTHLY STATUS REPORT NLT THE 10TH DAY OF THE CONTRACTOR’S FIRST ACCOUNTING MONTH OF THE PERIOD OF PERFORMANCE
BLK 13: THE CONTRACTOR SHALL DELIVER SUBSEQUENT MONTHLY STATUS REPORTS ON THE 10TH DAY OF EACH CONTRACTOR’S ACCOUNTING MONTH FOR THE PRIOR MONTH OF PERFORMANCE
IMAL-PWF REPORT COPY TO BE SENT TO:
ADELPHI LABORATORY CENTER
IMAL-PWF (RAYMOND WALKER)
2800 POWDER MILL RD.
ADELPHI, MD 20783-1197
IMAL-PWF
| 2 |
| 1 |
15. TOTAL
| 2 |
| 1 |
G. PREPARED BY
H. DATE
08/26/2015
I. APPROVED BY
FATIMA DIALLO
J. DATE
DD FORM 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED.
CONTRACT DATA REQUIREMENTS LIST
Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collecton of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-1088). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TDP_____ TM ______ OTHER: MISC
D. SYSTEM/ITEM
Refuse Removal with Waste Stream Diversion
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
A002
2. TITLE OF DATA ITEM
Schedule of Pickups
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-80368A
5. CONTRACT REFERENCE
C.4.2
6. REQUIRING OFFICE
IMAL-PWF
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
A
10. FREQUENCY
1 TIME
12. DATE OF FIRST SUBMISSION
BLK 16
14.
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
11. AS OF DATE
TBD
13. DATE OF SUBSEQUENT
SUBMISSION N/A
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
BLK 4: EACH REPORT SHALL BE DELIVERED ELECTRONICALLY IN A MEDIA SELECTED BY THE GOVERNMENT AT TIME OF DELIVERY. MEDIA TYPES WHICH CAN BE ACCEPTED INCLUDE: FILE TRANSFER PROTOCOL (FTP), CD-ROM AND DVD-ROM.
BLK 12: THE CONTRACTOR SHALL DELIVER THE SCHEDULE OF PICKUPS AT CONTRACT AWARD.
IMAL-PWF
15. TOTAL
G. PREPARED BY
H. DATE
I. APPROVED BY
FATIMA DIALLO
J. DATE
CONTRACT DATA REQUIREMENTS LIST
Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collecton of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-1088). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TDP_____ TM ______ OTHER: MISC
D. SYSTEM/ITEM
Refuse Removal with Waste Stream Diversion
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
A003
2. TITLE OF DATA ITEM
Safety Program Plan
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-SAFT-81626
5. CONTRACT REFERENCE
C.4.3
6. REQUIRING OFFICE
IMAL-PWF
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
A
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
BLK 16
14.
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
11. AS OF DATE
13. DATE OF SUBSEQUENT
SUBMISSION BLK 16
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
BLK 4: EACH REPORT SHALL BE DELIVERED ELECTRONICALLY IN A MEDIA SELECTED BY THE GOVERNMENT AT TIME OF DELIVERY. MEDIA TYPES WHICH CAN BE ACCEPTED INCLUDE: FILE TRANSFER PROTOCOL (FTP), CD-ROM AND DVD-ROM.
BLK 12: THE CONTRACTOR SHALL DELIVER THE SAFETY PROGRAM PLAN WITHIN 10 DAYS OF CONTRACT AWARD.
BLK13: THE CONTRACT SHALL DELIVER THE SAFETY PROGRAM PLAN REVISION WITHIN THREE DAYS OF RECEIPT OF REQUESTED CHANGES FROM COR.
IMAL-PWF
15. TOTAL
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
CONTRACT DATA REQUIREMENTS LIST
Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collecton of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-1088). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TDP_____ TM ______ OTHER: MISC
D. SYSTEM/ITEM
Refuse Removal with Waste Stream Diversion
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
A004
2. TITLE OF DATA ITEM
Quality Control Plan
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-QCIC-81009
5. CONTRACT REFERENCE
C.4.4
6. REQUIRING OFFICE
IMAL-PWF
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
A
10. FREQUENCY
1 TIME
12. DATE OF FIRST SUBMISSION
BLK 16
14.
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
11. AS OF DATE
13. DATE OF SUBSEQUENT
SUBMISSION N/A
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
BLK 4: EACH REPORT SHALL BE DELIVERED ELECTRONICALLY IN A MEDIA SELECTED BY THE GOVERNMENT AT TIME OF DELIVERY. MEDIA TYPES WHICH CAN BE ACCEPTED INCLUDE: FILE TRANSFER PROTOCOL (FTP), CD-ROM AND DVD-ROM.
BLK 12: THE CONTRACTOR SHALL DELIVER THE TRAINING PROGRAM ON A QUARTERLY BASIS WITH THE FIRST PROGRAM DELIVERED WITHIN FIFTEEN DAYS OF CONTRACT AWARD.
IMAL-PWF
15. TOTAL
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
CONTRACT DATA REQUIREMENTS LIST
Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collecton of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-1088). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TDP_____ TM ______ OTHER: MISC
D. SYSTEM/ITEM
Refuse Removal with Waste Stream Diversion
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
A005
2. TITLE OF DATA ITEM
Teardown Deficiency Report
3. SUBTITLE
Damage Report
4. AUTHORITY (Data Acquisition Document No.)
DI-ALSS-81534
5. CONTRACT REFERENCE
C.4.5
6. REQUIRING OFFICE
IMAL-PWF
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
A
10. FREQUENCY
ASREQ
12. DATE OF FIRST SUBMISSION
BLK 16
14.
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
11. AS OF DATE
13. DATE OF SUBSEQUENT
SUBMISSION BLK 16
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
BLK 4: EACH REPORT SHALL BE DELIVERED ELECTRONICALLY IN A MEDIA SELECTED BY THE GOVERNMENT AT TIME OF DELIVERY. MEDIA TYPES WHICH CAN BE ACCEPTED INCLUDE: FILE TRANSFER PROTOCOL (FTP), CD-ROM AND DVD-ROM.
BLK 12: THE CONTRACTOR SHALL DELIVER TEARDOWN DEFICIENCY REPORT BY CLOSE OF BUSINESS ON THE DAY THE DAMAGE OCCURRED.
BLK 13: THE CONTRACTOR SHALL DELIVER THE SUBSEQUENT TEARDOWN DEFICIENCY REPORT ON BY CLOSE OF BUSINESS ON THE DAY THE NEXT INCIDENT THAT RESULTED IN DAMAGE OCCURS.
IMAL-PWF
15. TOTAL
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
CONTRACT DATA REQUIREMENTS LIST
Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collecton of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-1088). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TDP_____ TM ______ OTHER: MISC
D. SYSTEM/ITEM
Refuse Removal with Waste Stream Diversion
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
A006
2. TITLE OF DATA ITEM
Training Program
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-81521B
5. CONTRACT REFERENCE
C.4.6
6. REQUIRING OFFICE
IMAL-PWF
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
A
10. FREQUENCY
QRTLY
12. DATE OF FIRST SUBMISSION
BLK 16
14.
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
11. AS OF DATE
13. DATE OF SUBSEQUENT
SUBMISSION BLK 16
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
BLK 4: EACH REPORT SHALL BE DELIVERED ELECTRONICALLY IN A MEDIA SELECTED BY THE GOVERNMENT AT TIME OF DELIVERY. MEDIA TYPES WHICH CAN BE ACCEPTED INCLUDE: FILE TRANSFER PROTOCOL (FTP), CD-ROM AND DVD-ROM.
BLK 12: THE CONTRACTOR SHALL DELIVER THE TRAINING PROGRAM ON A QUARTERLY BASIS WITH THE FIRST PROGRAM DELIVERED WITHIN FIFTEEN DAYS OF CONTRACT AWARD.
BLK 13: THE CONTRACTOR SHALL DELIVER THE TRAINING PROGRAM ON A QUARTERLY BASIS WITH THE SUBSEQUENT SUBMISSION THREE MONTHS AFTER THE INITIAL SUBMISSION.
IMAL-PWF
15. TOTAL
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
CONTRACT DATA REQUIREMENTS LIST
Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collecton of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-1088). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TDP_____ TM ______ OTHER: MISC
D. SYSTEM/ITEM
Refuse Removal with Waste Stream Diversion
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
A007
2. TITLE OF DATA ITEM
Compost Plan
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-81117
5. CONTRACT REFERENCE
C.4.7
6. REQUIRING OFFICE
IMAL-PWF
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
A
10. FREQUENCY
1 TIME
12. DATE OF FIRST SUBMISSION
BLK 16
14.
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
11. AS OF DATE
13. DATE OF SUBSEQUENT
SUBMISSION N/A
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
BLK 4: EACH REPORT SHALL BE DELIVERED ELECTRONICALLY IN A MEDIA SELECTED BY THE GOVERNMENT AT TIME OF DELIVERY. MEDIA TYPES WHICH CAN BE ACCEPTED INCLUDE: FILE TRANSFER PROTOCOL (FTP), CD-ROM AND DVD-ROM.
BLK 12: THE CONTRACTOR SHALL DELIVER THE SAFETY PROGRAM PLAN WITHIN 30 DAYS OF CONTRACT AWARD.
IMAL-PWF
15. TOTAL
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
EXHIBIT A – ATTACHMENT 1
ARMY RESEARCH LABORATORY
Report Title Goes Here
Any Subtitles Go Here
By Some Author and Another Author
ARL-CR-XXX
Month XXXX
Prepared by
Whatever Technology Corporation
0000 Research Drive
Anywhere, ST 20006-1000
Under contract
W911QX-XX-C-XXXX
DISTRIBUTION STATEMENT GOES HERE
EXHIBIT A – ATTACHMENT 2
The findings in this report are not to be construed as an official Department of the Army position unless so designated by other authorized documents.
Citation of manufacturer's or trade names does not constitute an official endorsement or approval of the use thereof.
DESTRUCTION NOTICE: For classified documents, follow the procedures in DoD 5220.22-M, National Industrial Security Program Operating Manual, Chapter 5, Section 7. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.
File details come from the government source that posted it. Updated .