Amendment 03 to answer questions from prospective offerors.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W911N2-18-R-0014-0002.pdf | ||
| NMWR_Attachment.pdf | ||
| W911N2-18-R-0014-0001.pdf | ||
| Reman_powertrain_PWS_11-30-17.pdf | ||
| W911N2-18-R-0014_.PDF | ||
| Synopsis_W911N2-18-R-0014.2.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TOM R. ALBRECHT
LETTERKENNY CONTRACTING OFFICE
1 OVERCASH AVENUE CCAM-ALK
717-267-5821
CHAMBERSBURG PA 17201-4150
W25G1Q8010R010
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to expound on answ ers to the previous amendment.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 01-Mar-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W911N2-18-R-0014
X 9B. DATED (SEE ITEM 11)
06-Feb-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
01-Mar-2018
CODE
LETTERKENNY ARMY DEPOT
LETTERKENNY CONTRACTING OFFICE - ACC
1 OVERCASH AVENUE, ATTN: CCAM-ALK, BLDG 2S
CHAMBERSBURG PA 17201-4150
W911N2 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE W911N2
FACILITY CODECODE
EMAIL:TEL:
W911N2-18-R-0014
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
QUESTIONS AND ANSWERS 2
1. Is it acceptable to provide block or cylinder heads that are NOT genuine AM General material, hence, counterfeit material, that does not comply with the DoD Counterfeit Prevention Policy? Will the casting numbers be inspected during the acceptance process to ensure they are not counterfeit? Only OEM blocks and cylinder heads are acceptable. OEM casting numbers will be inspected prior to shipping the engine to the contractor and after receiving the engine back from the contractor. If the casting numbers (or lack thereof) indicate a potential issue with the part, the appropriate actions will be taken with the contractor to ensure the correct components are being used.
2. If non OEM material is allowed, how does the government intend to insure that the counterfeit blocks and heads are within metallurgy specification and not missing the critical molybdenum component that’s in the metal composition of all new blocks. This significantly affects block strength and durability. Non OEM material is not allowed for engine blocks or cylinder heads.
3. In regards to Question and Answer #8 and #9 in Amendment 0002, we request that the Government reconsider the answers provided. Other Government Agencies typically do not allow aftermarket / counterfeit castings to be used in the remanufacturing of the HMMWV 6.5L engines. Although aftermarket castings may meet OEM specifications dimensionally, the material composition of the castings are significantly different. It is our experience that the aftermarket castings (blocks and heads) are far inferior to the OEM castings and could ultimately jeopardize the longevity of the remanufactured products. Please confirm Letterkenny Army Depot's position regarding replacement of non-repairable heads and blocks. Please refer to questions 1 and 2 above.
The following have been deleted:
QUESTIONS AND ANSWERS
(End of Summary of Changes)