Photo 1. USACE 4‐legged sling ready to lift Gate 1.

US Army 2015 H d li St l St t S f Att h t 7

Photo 2. Lifting one side of 2‐piece gate hatch cover, about 4,000 pounds.

y Corps of

Engineers

Alaska District

2015 Hydraulic Steel Structures Scope of Work for Moose Creek Dam Control Works

North Pole, AK

Attachment 7

Date:

07 March 2015

Expand existing wheel well openings in 1 ½” thick steel plate for new dogging bar each end on upstream face of operating gates 1-4. Note adjacent positioning spring not h k t h SK 1shown on sketch SK-1.

Photo 3. Upstream face of Gate 2 showing lower wheel well area.

Ultrasonic inspection of this double bevel, 2-sided groove weld in 15/16” thick plate. Full width (28’ 9 ¼”) for gates 1-4, and 6.

New dogging bar through this location at each end of Gates 1-4. Cut new 4” square openings th h 15/16” thi k t l l t thi id

US Army 2015 H d li St l St t S f Att h t 7

Photo 4. Downstream face of Operating Gate 1.

through 15/16” thick steel plate this side.

y Corps of

Engineers

Alaska District

2015 Hydraulic Steel Structures Scope of Work for Moose Creek Dam Control Works

North Pole, AK

Attachment 7

Photo 5. Gate 1 in approximate inspection position w/ 8 orifice plates installed.

2015 H d li St l St t S f Att h t 7

Photo 6. Gate 1 orifice plate removal.

y Corps of

Engineers

Alaska District

2015 Hydraulic Steel Structures Scope of Work for Moose Creek Dam Control Works

North Pole, AK

Attachment 7

Photo 7. Positioning spring on upstream face, upper wheel shown – similar at lower wheel.

2015 H d li St l St t S f Att h t 7

Photo 8. Field connection tabs and gouging on inside of gate adjacent to weld to be UT’d.

y Corps of

Engineers

Alaska District

2015 Hydraulic Steel Structures Scope of Work for Moose Creek Dam Control Works

North Pole, AK

Attachment 7

Photo 9. Cleaning gate interior with shovel and shop vacuum.

2015 H d li St l St t S f Att h t 7

Photo 10. Typical fine sand and wood debris inside gate cavities before cleaning.

y Corps of

Engineers

Alaska District

2015 Hydraulic Steel Structures Scope of Work for Moose Creek Dam Control Works

North Pole, AK

Attachment 7

Photo 11. Gate cavity cleaned for inspection.

2015 H d li St l St t S f Att h t 7

Photo 12. Using shovel to clean interior gate cavity for inspection.

y Corps of

Engineers

Alaska District

2015 Hydraulic Steel Structures Scope of Work for Moose Creek Dam Control Works

North Pole, AK

Attachment 7

Photo 13. 5/8 – 11 NC flat head orifice plate bolts coated with anti‐seize prior to replacement.

2015 H d li St l St t S f Att h t 7

Photo 14. “Match marking” of orifice plates.

y Corps of

Engineers

Alaska District

2015 Hydraulic Steel Structures Scope of Work for Moose Creek Dam Control Works

North Pole, AK

Attachment 7

Photo 15. Nylon slings hitched around orifice plate lifting lugs ready for plate removal.

2015 H d li St l St t S f Att h t 7

Photo 16. “Match marking” of orifice plates and nylon sling in place for orifice plate removal.

y Corps of

Engineers

Alaska District

2015 Hydraulic Steel Structures Scope of Work for Moose Creek Dam Control Works

North Pole, AK

Attachment 7

Photo 17. Gate #4 marked with weight of 92,500 pounds.

2015 H d li St l St t S f Att h t 7

Photo 18. Fish Ladder Bulkhead, 8,000 pounds.

y Corps of

Engineers

Alaska District

2015 Hydraulic Steel Structures Scope of Work for Moose Creek Dam Control Works

North Pole, AK

Attachment 7

Photo 19. Fish Ladder Gate, 8,900 pounds.

2015 H d li St l St t S f Att h t 7

Photo 20. Gate 5 (2 piece gate) laid on dunnage.

y Corps of

Engineers

Alaska District

2015 Hydraulic Steel Structures Scope of Work for Moose Creek Dam Control Works

North Pole, AK

Attachment 7

Photo 21. Gate 6 spreader bar and 4‐legged sling storage.

2015 H d li St l St t S f Att h t 7

Photo 22. North Fishway Gate, 11,900 pounds.

y Corps of

Engineers

Alaska District

2015 Hydraulic Steel Structures Scope of Work for Moose Creek Dam Control Works

North Pole, AK

Attachment 7

Photo 23. Preparing to weigh South Fishway Gate, 12,100 pounds.

2015 H d li St l St t S f Att h t 7

Photo 24. South Fishway Hatch Cover Removed.

y Corps of

Engineers

Alaska District

2015 Hydraulic Steel Structures Scope of Work for Moose Creek Dam Control Works

North Pole, AK

Attachment 7

Photo 25. Lifting Gate 6 with Spreader Bar and 4‐Legged Sling.

2015 H d li St l St t S f Att h t 7

Photo 26. Setting Gate 6 down for inspection. Will require access to both faces for 2015.

y Corps of

Engineers

Alaska District

2015 Hydraulic Steel Structures Scope of Work for Moose Creek Dam Control Works

North Pole, AK

Attachment 7

Photo 27. Orifice plate lifting lug configuration.

2015 H d li St l St t S f Att h t 7

Photo 28. Back side of larger orifice plate.

y Corps of

Engineers

Alaska District

2015 Hydraulic Steel Structures Scope of Work for Moose Creek Dam Control Works

North Pole, AK

Attachment 7

Photo 29. Retrieving spreader bar and 4‐legged sling from storage on Gate 6 in DS slot.

2015 H d li St l St t S f Att h t 7

Photo 30. Retrieving header bar and sling from storage on Gate 6 in downstream slot.

y Corps of

Engineers

Alaska District

2015 Hydraulic Steel Structures Scope of Work for Moose Creek Dam Control Works

North Pole, AK

Attachment 7

Photos
Photo 1. USACE 4‐legged sling ready to lift Gate 1.
Photo 2. Lifting one side of 2‐piece gate hatch cover, about 4,000 pounds.
Photo 3. Upstream face of Gate 2 showing lower wheel well area.
Photo 4. Downstream face of Operating Gate 1.
Photo 5. Gate 1 in approximate inspection position w/ 8 orifice plates installed.
Photo 6. Gate 1 orifice plate removal.
Photo 7. Positioning spring on upstream face, upper wheel shown – similar at lower wheel.
Photo 8. Field connection tabs and gouging on inside of gate adjacent to weld to be UT’d.
Photo 9. Cleaning gate interior with shovel and shop vacuum.
Photo 10. Typical fine sand and wood debris inside gate cavities before cleaning.
Photo 11. Gate cavity cleaned for inspection.
Photo 12. Using shovel to clean interior gate cavity for inspection.
Photo 13. 5/8 – 11 NC flat head orifice plate bolts coated with anti‐seize prior to replacement.
Photo 14. “Match marking” of orifice plates.
Photo 15. Nylon slings hitched around orifice plate lifting lugs ready for plate removal.
Photo 16. “Match marking” of orifice plates and nylon sling in place for orifice plate removal.
Photo 17. Gate #4 marked with weight of 92,500 pounds.
Photo 18. Fish Ladder Bulkhead, 8,000 pounds.
Photo 19. Fish Ladder Gate, 8,900 pounds.
Photo 20. Gate 5 (2 piece gate) laid on dunnage.
Photo 21. Gate 6 spreader bar and 4‐legged sling storage.
Photo 22. North Fishway Gate, 11,900 pounds.
Photo 23. Preparing to weigh South Fishway Gate, 12,100 pounds.
Photo 24. South Fishway Hatch Cover Removed.
Photo 25. Lifting Gate 6 with Spreader Bar and 4‐Legged Sling.
Photo 26. Setting Gate 6 down for inspection. Will require access to both faces for 2015.
Photo 27. Orifice plate lifting lug configuration.
Photo 28. Back side of larger orifice plate.
Photo 29. Retrieving spreader bar and 4‐legged sling from storage on Gate 6 in DS slot.
Photo 30. Retrieving header bar and sling from storage on Gate 6 in downstream slot.