4a1._Technical_Exhibit_D_-__FT_Hood_Bid_Estimate_OED_FY20_FOR_BIDDING_16....xlsx

XLSX spreadsheet 22 KB Posted

Attached to
Demo Requirements IDIQ
Solicitation number
W91151-19-B-0032
Issued by

About this file

Revised Bid Sheet

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BASE YEAR

Project Number:
Project Name:
Duration:XX days
Status:Approved
Organization:
IGCE Creator:
Telephone:254-287-XXXX
E-mail:
Reviewer:
Telephone:254-287-XXXX
E-mail:

NOTE: The IGCE preparer(s) and IGCE approving reviewer(s) certify the IGCE was developed independently and prior to seeking proposal from any contractor.

DEMO REQUIREMENTS CONTRACT W91151-19-D-#### (3 YEAR IDIQ CONTRACT)

DESC:43725.0
Project Number:
POC:
LINE ITEM#WORK DESCRIPTIONUNITUnit PriceActual QuantityTOTAL COST
$0.00
100Dismantle, Demo, Removal of One Story Wooden StructureSF$0.00240,000
200Dismantle, Demo, Removal of Two Story Wooden StructureSF$0.0060,000
300Dismantle, Demo, Removal of One Story Masonry StructureSF$0.0090,000
400Dismantle, Demo, Removal of Multi-Story Masonry StructureSF$0.0030,000
500Dismantle, Demo, Removal of Metal Building with Exterior WallsSF$0.0045,000
600Dismantle, Demo, Removal of Metal Structures with No Exterior WallsSF$0.0024,000
700Dismantle of Relocatable StructuresSF$0.0030,000
800Mobilization / Demobilization ChargeEA$0.00180
SELECTIVE DEMOLITION, UTILITIES AND COMMUNICATIONS, INCLUDE HAUL, SALVAGE
900Potholing for UtilitiesEA$0.00240
1000Remove Existing Utility Pole, Including AccessoriesEA$0.0024
1100Privatized Utilities Fees to System OwnersLS
DO NOT BID ON THIS LINE ITEM. THIS LINE ITEM WILL ONLY BE USED FOR PROJECTS WHERE NO PRE-PRICED LINE ITEMS EXIST ELSEWHERE IN THE BID SCHEDULE. IT WILL BE NEGOTIATED AT TIME OF OCCURRENCE.
1200Demo BollardsEA$0.00150
1300Demo Man-hole/ Hand-holeEA$0.0045
1400Remove Outside Communication LineLF$0.009,000
1500Disconnect and move SIPR safeEA$0.0015
1600Place Flowable Fill in Abandoned Pipe, 2"-4"LF$0.004,500
1700Place Flowable Fill in Abandoned Pipe, >4"-8"LF$0.004,500
SELECTIVE DEMOLITION, SITE, INCLUDE HAUL, SALVAGE
1800Pavement Removal, Bituminous, to 4" thicknessSY$0.00120,000
1900Pavement Removal, Bituminous, Additional 1"SY$0.0030,000
2000Pavement Removal. Sidewalk, 4" Typ.SY$0.0030,000
2100Pavement Removal, Concrete, to 6" ThicknessSY$0.0024,000
2200Pavement Removal, Concrete, +6" to 12" ThicknessSY$0.0012,000
2300Curbs, Concrete, ReinforcedLF$0.009,000
2400Remove Fencing Post & Fabric, Barbwire, Gates, Up to 7' TallLF$0.0012,000
2500Remove Fencing Post & Fabric, Barbwire, Gates, Greater Than 7' TallLF$0.003,000
SITE REESTABLISHMENT
2600Fill, Compact, GradingCY$0.0090,000
2700ExcavationCY$0.005,000
2800Place Top Soil and Prepare for SeedingSY$0.00210,000
2900HydromulchSY$0.0090,000
3000Install Bermuda SodSY$0.00120,000
3100Flexterra FGMSY$0.0015,000
3200Scour StopSF$0.00600
ASBESTOS REMOVAL, INCLUDING HAUL, DISPOSAL
3300Remove Asbestos Insulation from Piping to include Attached Fittings, Valves & accessories, Complete, 1/2" through 6" pipeLF$0.006,000
3400Remove Asbestos Insulation from Piping to include Attached Fittings, Valves & accessories, Complete, above 6", pipeLF$0.006,000
3500Remove Asbestos Insulation From Duct-work,CompleteSF$0.006,000
3600Remove Asbestos From Furnaces, Water Tanks, Stacks, Water Heaters and Other Equipment to Include Attached Fittings, Valves & Accessories, CompleteSF$0.003,600
3700Remove Blown-in Asbestos Insulation from Building Walls and CeilingsSF$0.0060,000
3800Remove Asbestos Type Blown-in Acoustical InsulationSF$0.009,900
3900Remove Wall Acoustical Plaster w/ ACH, CompleteSF$0.009,900
4000Remove Wall , Hard Veneer Plaster w/ ACH, CompleteSF$0.003,600
4100Remove Asbestos Cement Board, CompleteSF$0.009,900
4200Remove Asbestos Floor Tile & Carpet Over Floor Tile Complete, w/ Underlayments and Any Floor Overlays to Subfloor, CompleteSF$0.00180,000
4300Remove Existing Asbestos Contaminated SoilCF$0.0018,000
4400Clean-up Gross Contaminated AreasCF$0.0045,000
4500Remove Asbestos Contaminated Suspended Ceiling Tile and Grid to Include DisposalSF$0.0090,000
4600Remove Carpet Glued to Concrete or Wood with Asbestos Contaminated Mastic to Include DisposalSF$0.0060,000
4700Remove and Dispose of Asbestos Containing Roof Felt and Mastic (up to 3 Layers)SF$0.006,000
4800Remove and Dispose of Asbestos Containing Roof FlashingLF$0.0018,000
4900Remove and Dispose of Asbestos Containing Glazing and PutySF$0.006,000
LEAD-BASED PAINT REMOVAL
5000Lead-Based Paint RemovalSF$0.0012,000
5100Mold RemediationSF$0.0012,000
5200Initial Asbestos, Lead-Based Pain, Mold Building Survey:
5200-1 Building Up to 5000 SFEA$0.0045
5200-2 Building Greater Than 5000SF, Up to 10,000 SFEA$0.0060
5200-3 Building Greater Than 10,000 SF, Up to 20,000 SFEA$0.0024
5200-4 Building Greater Than 20,000 SFEA$0.006
5300Construction/Post-Construction Asbestos Sample TestingEA$0.0030
5400Unpriced Unit Items (10%)LS
DO NOT BID ON THIS LINE ITEM. THIS LINE ITEM WILL ONLY BE USED FOR PROJECTS WHERE NO PRE-PRICED LINE ITEMS EXIST ELSEWHERE IN THE BID SCHEDULE. IT WILL BE NEGOTIATED AT TIME OF OCCURRENCE.
5600Asbestos FeesEA$0.00180
5700As-Built DrawingsEA$0.0030
SUBTOTAL$0.00
5500Bond (X% of Total) DO NOT BID ON THIS LINE ITEM. THIS LINE ITEM WILL BE APPLIED AT THE AWARD OF THE TASKORDER PER THE CONTRACTOR'S RATE%____%

GRAND TOTAL $0.00

image1.emf image2.emf

File details come from the government source that posted it.