A07-Attach_7_Pricing_Sheet.xlsx
XLSX spreadsheet 23 KB Posted
- Attached to
- Air Emissions Sample Analysis
- Solicitation number
- W81XWH18Q0181
- Issued by
-
Department of the Army Medical Command
About this file
Pricing Sheet
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A07-Amend_002_Synop_Solicit_18Q0181.docx | DOCX document | |
| A07-Amendment_001_18Q0181.docx | DOCX document | |
| A07-Attach_1_PWS_18Q0181.docx | DOCX document | |
| A07-Attach_4_Quality_Control_Rqmnts.docx | DOCX document | |
| A07-Attach_5_Report_Rqmnts_&_Dlvrbls.docx | DOCX document | |
| A07-Attach_2_QASP_18Q0181.docx | DOCX document | |
| A07-Attach_6_OCI_Form.docx | DOCX document | |
| A07-Attach_0_Synop_Solicit_18Q0181.docx | DOCX document | |
| A07-Attach_3_Para_Method_&_Quantity_Limits.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pricing Sheet
| Contractor Shall Provide Standard TAT Unit Prices for each line item. Price is to include all lab Blank and method/lab QC |
| (no separate charges for lab/method QC). Field blanks/QC will be charged at the field sample rate. |
| The prices provided shall be for each fraction/analysis/set of results produced |
| Description | # of Fractions Typically Ordered Per Train | Method | Minimum Projected QTY (fractions) | Maximum Projected Qty (fractions) | Base Year Unit Price (Per fraction) | BASE YEAR TOTAL AMOUNT (MINIMUM) Projected Quantity | BASE YEAR TOTAL AMOUNT (MAXIMUM) Projected Quantity | Option Year 1 Total MINIMUM Price (w/o surcharge) | Option Year 1 Total MAXIMUM Price (w/o surcharge) | Option Year 2 Total MINIMUM Price (w/o surcharge) | Option Year 2 Total MAXIMUM Price (w/o surcharge) | Option Year 3 Total MINIMUM Price (w/o surcharge) | Option Year 3 Total MAXIMUM Price (w/o surcharge) | Option Year 4 Total MINIMUM Price (w/o surcharge) | Option Year 4 Total MAXIMUM Price (w/o surcharge) | |
| 1 | Dioxins/Furans | 2 | EPA 0023A/8290 | 40 | 80 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 2 | Dioxins/Furans | 1 (not incl. toluene rinse) | RM 23 | 4 | 8 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3 | Dioxins/Furans (Toluene Rinse) | 1 | RM 23 | 4 | 8 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 4 | HCl/Cl2 * | 2 (one HCl; one Cl2; price same for each fraction) | RM 26A | 40 | 80 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 5 | Metals (any 1-9 Metals) | 2 | RM 29/EPA 6020A/6010 | 50 | 100 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 6 | Metals (any > 9 metals) | 2 | RM 29/EPA 6020A/6010 | 2 | 4 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 7 | Mercury | 5 | RM 29/EPA 7470A | 60 | 120 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 8 | SVOCs (full list) | 3 | EPA 0010/3542/8270C or D | 3 | 6 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 9 | SVOCs (any 1-3 compounds) | 3 | EPA 0010/3542/8270C or D | 30 | 60 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 10 | SVOCs | NA | TO-13A | 5 | 10 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 11 | XAD clean/pre-spike * | (per cartridge/filter pair) | EPA 0010/0023A | 60 | 120 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 12 | Filters (for metals/RM29) | per filter | EPA RM29 | 60 | 120 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 13 | Surcharge for High Priority ( _1.25__ x standard price) | |||||||||||||||
| TOTAL | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| * Pricing includes contractor cleaning/proofing resin/filters, packing cartridges/tubes, spiking as needed and shipment of all media to sampling site | ||||||||||||||||
| % of Total Samples | Surcharge Multiplier | MINIMUM Base Year Price Per Priority (STD TAT Price X % of Total Sample X surcharge multiplier) | MAXIMUM Base Year Price Per Priority (STD TAT Price X % of Total Sample X surcharge multiplier) | Option Year 1 Total MINIMUM Price (w/o surcharge) | Option Year 1 Total MAXIMUM Price (w/o surcharge) | Option Year 2 Total MINIMUM Price (w/o surcharge) | Option Year 2 Total MAXIMUM Price (w/o surcharge) | Option Year 3 Total MINIMUM Price (w/o surcharge) | Option Year 3 Total MAXIMUM Price (w/o surcharge) | Option Year 4 Total MINIMUM Price (w/o surcharge) | Option Year 4 Total MAXIMUM Price (w/o surcharge) | |||||
| Standard Priority | 90% | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| High Priority | 10% | 1.25 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
Price W/ Priority surcharge calculations $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
| MINIMUM TOTAL ESTIMATED CONTRACT (Base + 4 OY) Value: | $0.00 |
| MAXIMUM TOTAL ESTIMATED CONTRACT (Base + 4 OY) Value: | $0.00 |
File details come from the government source that posted it.