002_SIF_Guidelines_(Solicitation_Reference).pdf
PDF 11 MB Posted
- Attached to
- Army Watercraft Systems (AWS) Services Federal contract opportunity
- Solicitation number
- W56JSR-17-R-0021
About this file
002_SIF_Guidelines_(Solicitation Reference)
View the file
Other files for this federal contract opportunity
Show all 35
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
( SIF Remedy Release 7.6.4 )
Army Watercraft Services
C4ISR Sustainment Branch
(AWS - CSB)
Single Interface to the Field Guidelines (SIF Guidelines - Rev 40)
(Remedy 8.1 Release)
January 19, 2016
Return to TOCReturn to Business RulesReturn to Braces
Single Interface to the Field (SIF) Guidelines Table of Contents
• SIF Data Entry Business Rules
• IRM Online – Web Client
• INCIDENT REVIEW
• WORK INFORMATION
• TIME TRACKER
• FINANCIALS
• RESOLVE & CLOSE INCIDENT
• CANCELLING AN INCIDENT
• BACKUP SLIDES
• REVISION HISTORY
219 January 2016 SIF Guidelines - Rev 40
SIF Guidelines
All fields identified in these Guidelines are required to be entered by the contractor unless a specific field is not applicable to the incident. Reporting timelines are identified as requirements for the contractor to update incidents using the online client version of the Single Interface to the Field Incident Reporting Module (SIF
IRM).
319 January 2016 SIF Guidelines - Rev 40
The SIF Guidelines provide information for the Web-Based Online Client. As the contractor collects data, it is required to be entered into the Online Client. Data is required to be entered in the Online Clients in real-time – the time the task is progressing.
Except for financial data and financial reports all data fields represented in these guidelines are required to be entered into the SIF IRM before an incident is moved to the Resolved status. All data are required to be entered and complete before incident is moved to the Closed status. After an incident is closed, it cannot be reopened.
SIF Data Entry Business Rules
These slides are subject to change based upon government reporting requirements.
All changes shall be submitted from the AWS C4ISR Sustainment Branch (AWS - CSB) Management Team to the LSI Program Manager for distribution to all personnel.
419 January 2016 SIF Guidelines - Rev 40
IRM Web-Based Online Client
519 January 2016 SIF Guidelines - Rev 40
IRM Web Login
Access IRM via home page at https://sif.kc.army.mil/p/ and select Information Technology Service Management (ITSM) or direct link at https://sif.army.mil/arsys/
Utilize your CAC to sign in:
Step 1. Select a CAC certificate.
Step 2. Click OK.
Step 3. Enter the CAC PIN.
Step 4. Click OK. After you login, the IT homepage appears. (see next slide)
619 January 2016 SIF Guidelines - Rev 40 https://sif.kc.army.mil/p/ https://sif.army.mil/arsys/
IT Homepage
The IT homepage contains the following links, depending on your permissions:
• Overview Console – A summary of incidents submitted. There are four presentation options:
• Submitted By Me
• Assigned To Me
• Assigned To My Selected Groups
• Assigned To All My Groups
• Broadcast – A list of messages broadcast to the user community.
• Dashboard – This is a presentation of all open incidents by status and priority.
• Applications Link – Used to access: Quick Links, Asset Management, Incident Management and Problem Management 719 January 2016 SIF Guidelines - Rev 40
Incident Search
The Incident Management form incorporates core information into a single page with four tabs for greater ease of use.
Searching for an Incident
1. Select the vertical Applications tab to display dropdown of quick links.
2. Select Incident Management to display options.
3. Select Search Incident.
819 January 2016 SIF Guidelines - Rev 40
Search Incident
Incident Search
Type in Incident ID and select Search.
May also search on Affected System (vessel hull ID).
Company is preselected and fixed to AWS .
919 January 2016 SIF Guidelines - Rev 40
INCIDENT REVIEW
1019 January 2016 SIF Guidelines - Rev 40
Incident Review
This is the IRM incident data entry screen that contains the capabilities needed to investigate and resolve incidents.
Note: The contractor is not authorized to create incident requests; however, these guidelines provide the information that must either be reviewed or inputted by the contractor.
1119 January 2016 SIF Guidelines - Rev 40
Click on brace to hyperlink to respective area of interest.
Click on Return to Braces to return to this slide.
Incident Review
The Single Interface to the Field (SIF) navigational features are shown above.
If an item function is not understood, hover the mouse pointer on the icon to acquire a functional description.
Each field is explained in detail on the following slides. CFSR is required to verify all field entries.
Recent Pages
Personal Home Page
Bread crumb navigation > click text to bring you to a specific location
Symbol Legend
Navigation
Page Forward Page Back
Clear Entry
Entry Details
Context Sensitive Search
Data Entry & Edit
1219 January 2016 SIF Guidelines - Rev 40
Work Info Type
Edit Entry
Customer & Contact Information
Data is required to be entered and verified by the CFSR during first contact with the Unit or POC and after CFSR completes resolution.
Ticket Classification is either Classified or Unclassified. All Army Watercraft C4ISR incidents are Unclassified.
Customer is the MCSC representative that entered the incident (Select next to Customer for detail - see next slide).
Contact is the POC that reported the incident (Mariner, AMSA Shop, site POC) for the vessel. Be sure to enter the correct information as other people who access the incident may need it for informational purposes. (Select next to Contact for detail – see next slide).
1319 January 2016 SIF Guidelines - Rev 40
Customer Information
This slide is for reference only.
View after selecting Customer Detail from previous slide. This is pre-populated customer information data.
1419 January 2016 SIF Guidelines - Rev 40
Caller Contact Information
Verify and update as required if incorrect (first select from previous slide so they now look like this above).
Select Edit tool for either Customer/Contact Phone or Customer/Contact Site to enter or modify data.
Contact Phone – phone number of person to contact (POC).
Contact Site – vessel home location.
First select OK on pop-up window then press Save on main window.
1519 January 2016 SIF Guidelines - Rev 40
Select double arrows to view Customer and Contact details as shown.
Select Clear then enter new data below.
When finished select OK.
NOTE: Data do not propagate to Site
Form.
Specific Data / Caller Contact Data
Caller Contact Data POC last name and first name.
Section/Cell contains POC’s Rank or Title (Example: CW2).
Army Component - Enter who owns the vessel
(Example: APS: Army Prepositioned Stock, AR: Active Component, RC: Reserve Component) Major Commands
Enter Major Command (MACOM) the vessel is assigned to.
Unit –Select unit associated with incident or Unavailable ( See Unit information slide ) Environmental Conditions (see next slide for business rules).
CFSR is to verify the caller contact data and correct any errors.
Army
Component
Major
Commands
Unit/Brigade
Create a work log that describes the selection rationale in more detail.
What you see after you select Specific Data > Caller Contact Data submenu.
1619 January 2016 SIF Guidelines - Rev 40
Environmental Condition Business Rules
Definition: In general, an Environmental Condition represents the circumstance in which the incident occurred or was discovered.
1. Corrective Maintenance: Incident occurred or was discovered during corrective maintenance of the vessel.
2. Cyclical Maintenance: Incident occurred or was discovered during cyclical maintenance of the vessel.
3. Normal OPS: Incident occurred or was discovered during normal operations of the vessel.
4. Preventive Maintenance: Incident occurred or was discovered during preventive maintenance of the vessel.
5. Shutdown: Incident occurred or was discovered during shutdown of the vessel.
6. Startup: Incident occurred or was discovered during startup of the vessel.
7. Storage: Currently not used by the AWS team
Note: In a situation where two possibilities exist you can enter both conditions.
For example, in the case of:
Corrective Maintenance and Startup – select Corrective Maintenance then select Startup.
or
Preventive Maintenance and Shutdown – select Preventive Maintenance then select Shutdown.
After entering conditions, select Save.
Note: No more than two Environmental Conditions may be entered. Currently, if you select more than two, the SIF will provide a warning and delete the second entry.
1719 January 2016 SIF Guidelines - Rev 40
Specific Data / Caller Contact Data
Verify and update if incorrect:
Site/Location/Boat/Equipment - Current physical location of vessel.
CONUS or OCONUS - Make appropriate selection for physical vessel location.
Press Save.
What you see after you select Specific Data > Caller Contact Data.
1819 January 2016 SIF Guidelines - Rev 40
Site/Location/Boat/Equip
Specific Data / Ticket Origination
Select Specific Data then select Ticket Origination for origination data. See next slide for details.
1919 January 2016 SIF Guidelines - Rev 40
Ticket Origination Data
Verify and update if incorrect:
UIC - See backup slides for UIC listing vs Hull Number -> here Case Type - Represents the type of ticket. See Case Type list for acceptable entries.
Press Save.
Case Type
What you see after you select Specific Data > Ticket Origination from previous slide.
2019 January 2016 SIF Guidelines - Rev 40
Summary and Notes Information
Summary – Capture the basic description of the fault. Include affected asset and problem.
Example: LSV 5 Standard Repeater for navigation is broken.
Example: LT 805 STD 22 Gyro is leaking fluid from case
Notes - a more detailed explanation of the issue encountered and includes the detail from the initial incident request and maintains data as reported by unit. In addition, it should represent the actual problem even if it is different from initial unit reported incident.
Data is required to be entered and verified during first contact with the Unit or POC.
2119 January 2016 SIF Guidelines - Rev 40
Recording a Potentially Related Incident
Tag an incident that is potentially related to another incident by using the following format:
Append to the Summary field of each dependent incident the keyword <RELATE> and parent incident number.
Example: LSV 5 ECDIS #2 receives only one GPS feed; will not adjust brightness or turn on <RELATE> 283710
Data is required to be entered and verified during first contact with the Unit or POC.
2219 January 2016 SIF Guidelines - Rev 40
Affected System Information
Affected System is the vessel hull number which is selected from a drop-down list.
Data is required to be entered and verified by the CFSR during first contact with the Unit or POC and subsequently after CFSR completes resolution.
2319 January 2016 SIF Guidelines - Rev 40
Affected Asset Information
Affected Asset identifies asset impacted.
Data is required to be entered and verified by the CFSR during first contact with the Unit or POC and subsequently after CFSR completes resolution. See next several slides to drill down to Affected Asset detail.
If the actual Level 1 asset is not in the CI dropdown list then see > Category/Type/Item (Ex. Hardware) for proper course of action.
2419 January 2016 SIF Guidelines - Rev 40
Category/Type/Item
If an affected asset is selected the Category, Type and Item (CTI ) will default to a value associated with the asset. Currently Category is Hardware. The CTI default values can be over-ridden manually with other CTI values in the list.
The next slide has an example for Hardware.
Data is required to be entered and verified by the CFSR during first contact with the Unit or POC and subsequently
2519 January 2016 SIF Guidelines - Rev 40
Category/Type/Item (Ex. Hardware)
Choice of Category, Type and Item selections for Hardware When the Affected Asset is selected the Category ,Type and Item are auto-populated. If the actual Level 1 asset is not in the CI dropdown list then use: Category = Hardware, Type = Vessel/Carrier, Item = the class of the vessel.
If the actual Level 1 asset is not in the CI dropdown list or a list does not exist, place the hull number in the Affected Asset field using the CI Search icon (this must be used as you cannot type it in).
Data is required to be entered and verified by the CFSR during first contact with the Unit or POC and after the CFSR completes resolution.
Type
Item
2619 January 2016 SIF Guidelines - Rev 40
Category
Impact/Urgency/Priority
Verify Impact as designated in the AWS Asset Impact Guide and the Urgency as designated by the Unit along with the auto calculated Priority based on an incident request. See next slide for Incident Prioritization based on Impact and Urgency.
Data is required to be entered and verified by the CFSR during first contact with the Unit or POC and after the CFSR completes resolution.
2719 January 2016 SIF Guidelines - Rev 40
Incident Prioritization
Prioritization Table M a ri n e r
U rg e n c y L
M
H
1 2 3 4
Asset Impact
Prioritization of asset repair enables more efficient use of limited resources to ensure continued centralized support of
C4ISR equipment and improves fleet readiness.
Support Response Support response is guided by the mariner urgency and asset impact as indicated in the table above and notes below.
Within 48 hours for CONUS and 72 hours OCONUS.
On-site inspection NLT 10 days after incident report based on vessel availability.
Schedule on-site support to maximize project cost and workload efficiency within 30 days.
Mariner Urgency
This assessment is provided by the mariner or POC creating the incident report (trouble ticket)
High urgency: C4ISR asset condition prevents vessel from getting under way or prevents mission execution.
Medium urgency: C4ISR asset is non-functional or partially degraded but does NOT impact mission.
Low urgency: C4ISR asset minor degradation and does not impact mission.
Asset Impact Impact of 1 is HIGH and impact of 4 is LOW
Defined by the equipment type and based on pre-coordinated assessments with the AWS community.
2819 January 2016 SIF Guidelines - Rev 40
AWS Asset Impact Guide
2919 January 2016 SIF Guidelines - Rev 40
Asset Impact Condition
AIS System* 1 Active vessel in Theater - if NOT in theater, status changes to 3
AN/PRC 150* 1 Active vessel in Theater - if NOT in theater, status changes to 3
AN/VRC 103(V)/117 Radio Set* 1 Active vessel in Theater - if NOT in theater, status changes to 4
BGAN/GRRIP* 1 Highest Priority
Blue Force Tracker* 1 Active vessel in Theater - if NOT in theater, status changes to 4
DGPS 1 1 - If more than one GPS is down; if not status changes to 3
FLEET 77* 1 Highest Priority
Fluxgate Compass 1 Highest Priority
GMDSS (with INMARSAT)* 1 Highest Priority
Gyro Compass 1 Highest Priority
IFF* 1 Active vessel in Theater - if NOT in theater, status changes to 3
INMARSAT* 1 Highest Priority
Intercom 1 Highest Priority
Loudhailer 1 Highest Priority
Magnetic Compass 1 Highest Priority
MOBI 1 Highest Priority
NAVTEX 1 Highest Priority
PA/GA Integrated Communication System 1 Highest Priority
PLGR/DAGR 1 1 - If more than one GPS is down; if not status changes to 3
Radar 1 Highest Priority
Rectifier and Controller Interface 1 Highest Priority **
Rudder Angle Indicator 1 Highest Priority
STE or STU (Secure Telephone) 1 Active vessel in Theater - if NOT in theater, status changes to 3
Steering Systems 1 Highest Priority
Sound Powered Telephone 1 1- If deadlining; if not status changes to 3
UPS for Radar 1 Highest Priority
VHF/FM DSC Transceiver (stand-alone)* 1 Highest Priority
* When vessel is in theater, non-operation renders vessel NMC.
**Subject to PD AWS review.
AWS Asset Impact Guide
3019 January 2016 SIF Guidelines - Rev 40
Asset Impact Condition
AN/VIC-3 or AN/VIC-5 2 Conduct repairs as soon possible / as vessel returns to port **
Autopilot System 2 Conduct repairs as soon possible / as vessel returns to port
Digital Gyro Repeater 2 Steering/Fly bridge repeater - limited functionality; other status changes to 3
ECDIS Charting System 2 Conduct repairs as soon possible / as vessel returns to port
ECS Charting System 2 Conduct repairs as soon possible / as vessel returns to port
Handset H-250 (VHF) 2 Conduct repairs as soon possible / as vessel returns to port
SALTS Computer 2 Conduct repairs as soon possible / as vessel returns to port
Secure Printer/Fax 2 Conduct repairs as soon possible / as vessel returns to port
VMAIL Computer 2 Conduct repairs as soon possible / as vessel returns to port
UPS for ECS/ECDIS and SALTS/VMAIL 2 Conduct repairs as soon possible / as vessel returns to port
Depth Finder/ Echo Sounder 4 Conduct repairs at first availability
LST-5D 4 Conduct repairs at first availability
Movement Tracking System (MTS) 4 Conduct repairs at first availability
Weather System 4 Conduct repairs at first availability
Wind Speed Tracker 4 Conduct repairs at first availability
*When vessel is in theater, non-operation renders vessel NMC.
**Subject to PD AWS review.
Status List
Status is either New, Assigned, In Progress, Pending with a Status Reason, Resolved, Closed or Cancelled.
Status Reason and respective business rules are covered in the next several slides.
NOTE: After assigning an incident, when changing a Status or Status Reason, always place the incident in “In Progress”, select Save then change to the new Status or Status Reason.
Assigned
In Progress
Pending
Resolved
Closed
Cancelled
New
AWS Incident State Machine
3119 January 2016 SIF Guidelines - Rev 40
Status
Status Business Rules
• If the incident is in the Assigned Status, the Work Info Tab must be updated every 12 hours.
• If the incident is in the In Progress Status:
– If CFSR is off-site, the Work Info tab is updated at least every 3 days or when something new occurs.
– If CFSR is on-site, the Work Info Tab must be updated every 24 hours or daily.
• If the incident is in the Pending Status, the Work Info Tab must be updated Weekly and as new information occurs.
• If the incident is in the Resolved Status then the fault has been repaired.
• If the incident is in the Closed Status then all data and documentation input has been added to the incident.
NOTE: After assigning an incident, when changing a Status or Status Reason, always place the incident in “In Progress”, select Save then change to the new Status or Status Reason.
Status Reason and respective business rules start on next slide.
Assigned
In Progress Pending
Resolved
Closed
Cancelled
New
AWS Incident State Machine
3219 January 2016 SIF Guidelines - Rev 40
Status Reason List
Status Reason: business rules are on the next two slides.
NOTE: After assigning an incident, when changing a Status or Status Reason, always place the incident in “In Progress”, select Save then change to the new Status or Status Reason.
Assigned
In Progress Pending
Resolved
Closed
Cancelled
New
AWS Incident State Machine
3319 January 2016 SIF Guidelines - Rev 40
Status
Reason
Pending - Status Reason Business Rules
1. Awaiting Parts: Request for Quote (RFQ) Process and parts-on-order but not yet shipped. Once a tracking number is obtained, status reason changes to Parts in Transit.
2. Awaiting Return to Unit: Contractor must return to the unit to repair failure. Examples: If the vessel was not available long enough to complete the repair during the first visit, or if the incident was in pending status Awaiting Parts then once the vessel and/or parts are available place the incident into pending Awaiting Return to Unit. This option should not be used if a CFSR is continuing a repair over several days – this would remain in an In-Progress status.
3. Awaiting Servicing Visit: for Core CFSR. Coordination is being made for contractor to visit vessel. Vessel is available, known parts are available and repair is subject to CFSR’s availability to get on-site.
4. Customer Hold (ts): The customer or unit requests a hold on the repair or must complete an action to continue repair. A work info log entry is required for the reason and to document government direction. This option should be used when awaiting POC signature on the service report.
5. Future Enhancement (ts): If a repair cannot be resolved due to an upgrade or future enhancement requirement this choice would be selected. A work info log entry is required to document government direction.
6. Government Hold Required (ts): The Government directs the contractor to place the incident on hold due to factors such as:
cost, parts availability and/or a decision not to proceed at this time. A work info log entry is required to document government direction.
7. Monitoring Incident (ts): Contractor has repaired a fault but requires additional assessment underway or by crew to ensure the fault is resolved. Or, the contractor does not find a fault and the system seems to function properly but leaves the incident open to ensure that the fault does not recur within six weeks. CFSR must maintain communication with crew weekly.
8. Parts in Transit: Parts are in transit with tracking number to the vessel site. Prior to obtaining the tracking number, the Status
Reason is in Awaiting Parts. Work cannot continue until parts are received.
9. Request (ts): If the contractor requests approval, or action on the part of the government to complete the repair, select this option.
10. 3rd Party Vendor Action Required: for Non-core CFSR. If the contractor cannot support the action and must contact a subcontractor for support this would be the temporary pending status.
11. Vessel Availability (ts): Awaiting the availability of a vessel to take course of action in addressing an incident. A work info log entry is required to document government direction or information as relayed to LSI by the unit. Capture direction in either an email from AWS-CSB or the Unit with vessel availability dates.
NOTE: No other Status Reason is used. See state diagram on two previous slides to ensure “Time Stop” (ts) is captured correctly.
3419 January 2016 SIF Guidelines - Rev 40
Friday Night and Weekend IR Business Rules
• If an Incident Report (IR) arrives after 1500 on Friday through 2359 on Sunday contact the POC as usual. If there is no response within 2 hours of contacting the unit, place the IR on "Customer
Hold". Immediately remove from "Customer Hold“ when the unit responds. In any of these situations, make a note in the Work Log as to why the Incident Report is being placed on
"Customer Hold". On Monday follow up with POC if no response has been received.
3519 January 2016 SIF Guidelines - Rev 40
Assigned Group
A list of available Assigned Groups and Assignees within a group can be displayed from drop-down lists (See next slide for details).
3619 January 2016 SIF Guidelines - Rev 40
Assigned Group & Assignee Lists
Assignee To capture Assigned Group select the dropdown arrow then select AWS then select Army Watercraft Support Center.
To capture Assignee select respective dropdown arrow and assign CFSR. The Assignee should be the core CFSR resolving the incident unless it is a non-core effort.
3719 January 2016 SIF Guidelines - Rev 40
Assigned
Group
Unit Selection
Select the unit associated with the incident from the list of known Active, Reserve or National Guard units. Currently the 7th Sustainment Group and .UNAVAILABLE (to be used if unit is unknown) are permitted.
Data are required to be entered and verified by the CFSR during first contact with the Unit or POC and subsequently
3819 January 2016 SIF Guidelines - Rev 40
Exercise Selection
An Operations/Exercise can be associated with the incident if appropriate from a drop-down list of active exercises which are currently Homestation, CJLOTS, JLOTS ,Pacific Reach, PULSE-W and Nautical Horizons.
Data is required to be entered and verified by the CFSR during first contact with the Unit or POC and subsequently after CFSR completes resolution.
Exercise
3919 January 2016 SIF Guidelines - Rev 40
Required Resolution Date
4019 January 2016 SIF Guidelines - Rev 40
Enter Required Resolution Date (located under Date/System tab) as the next mission date or contractual completion date whichever comes first. Modify as needed.
WORK INFORMATION
4119 January 2016 SIF Guidelines - Rev 40
Incident Documentation Overview
• Work Detail is used to enter correspondence and work done on an incident. Supporting documentation such as electronic files, detailed information, pictures and write-ups can be attached in this section.
• Time Tracker is used to enter time information when working on an incident.
• Financials is used to enter general financial information.
• Resolution is used to enter information required to resolve the incident and ultimately closing the incident.
Note: Select respective hyperlink above to re-direct to details associated with that section.
4219 January 2016 SIF Guidelines - Rev 40
Work Information
Work information can be associated with the incident from the Work Detail tab. This can provide a history of actions taken to investigate and resolve the issues associated with the incident (such as Status and Status Reason). Daily updates if onsite, or at least weekly if the incident is in Pending Status, providing information such as parts order data and its status.
4319 January 2016 SIF Guidelines - Rev 40
Work Information (continued)
Select Create for entering information in the Notes field. Type the work that was performed in the Notes field (provide full details) and select Add when done. Then enter the Work Info Type and Source which are covered on the next few slides.
Only after all these items have been added should you select Save.
4419 January 2016 SIF Guidelines - Rev 40
Create
Edit
Report
History
Work Information Type
Select More Details to enter information associated with Work Info Type.
Select Work Info Type from drop down list.
Select Save.
4519 January 2016 SIF Guidelines - Rev 40
Work Information Source
Select More Details to enter information associated with Source.
Select Save
4619 January 2016 SIF Guidelines - Rev 40
Attaching a Document
Select the yellow folder next to Attachment to add an attachment. See next slide for details on attaching a file.
4719 January 2016 SIF Guidelines - Rev 40
Attaching a Document
Select Browse and navigate to where the file is that you want to attach. After selecting the file click on OK to complete adding attachment.
Note: Include all service reports, fault resolution photos and/or correspondence with the customer (Unit and/or AWS – CSB)
4819 January 2016 SIF Guidelines - Rev 40
Work Info Type Business Rules Work Info Update Overview The Work Info Update includes all coordination made to obtain parts, discussions with PM and other non-customer communication and Working Log entries. Include updates if awaiting a part; include other timely, relevant updates if resolution is still pending.
Work Info Type The Work Info Type is selected based upon the type of communication being completed. Currently, only Customer Status
Update, Detail Clarification, Incident Task / Action, and Working Log are utilized along with Govt Hold Reason.
– Customer Status Update (At least weekly) – any communication or follow-up with the customer (in this case the customer is the POC). All communication with customer or vessel crew related to incident to identify status delays or progress made toward resolution, including estimated delivery date of parts, vessel availability communication, probable cause, etc. Information should be updated weekly and as new information occurs.
– Detail Clarification – used when updating working log associated with Non-core CFSRs.
– Incident Task / Action – used when updating working log associated with parts.
– Working Log (Daily) – detail all work the CFSR is doing. Include daily updates while on-site. Verify summary is accurately represented. Include the Service Report with Summary title “Service Report”. A signed service report is required to be attached to the work log when the work is completed or if a return visit is required in accordance with
PWS Paragraph 3.2.2.1 and the latest version of Attachment 25.
– Govt Hold Reason has additional reasons why an incident may have been placed under Government Hold, these include:
• AWS-CSB: AWS-CSB has requested a hold be placed on the incident.
• Awaiting Deficiency Report (DR): A deficiency report needs to be issued before work can begin.
• Awaiting Engg Chg Proposal (ECP): An engineering change proposal needs to be issued and accepted/approved before work can begin.
• Departure From Specification (DFS): Departure from specification.
4919 January 2016 SIF Guidelines - Rev 40
Work Info Update Business Rules <PRIORITY> Tag
When delaying support for an incident (IR) based on a higher priority IR annotate in the Worklog of the affected incident which IR has taken priority, the hull number and the priority category with nature of fault. In addition, the CFSR either emails the POC who will be affected by the delay for concurrence and copies it into the work information log or the CFSR can create a document for the POC who will be affected by the delay to sign and attach to incident confirming authorization of support. This is required for each IR and each time the CFSR supports one IR over another.
Use Customer Status Update Work Info Type
The method of annotation in the affected IR Worklog is to use the <PRIORITY> tag as follows:
<PRIORITY> Priority IR number, + Priority vessel hull number, + Priority category + nature of fault
Scenario: Supporting an ARCENT Vessel Prior to an ASC Vessel
Worklog example: <PRIORITY> 292715, LCU-2002, High Priority, AIS RF cable is damaged and requires replacement.
CFSR unable to attend this issue; working a higher priority ticket at this time.
Attach an email to Worklog from the ASC POC confirming authorization to support the ARCENT vessel IR ahead of the ASC vessel IR.
Encase capitalized key word in angle brackets <> and separate tag with a space at the end.
5019 January 2016 SIF Guidelines - Rev 40
Work Info Update Business Rules <DELAY> Tag
If a CFSR delays support for an incident (IR) on a vessel that is not based on a higher priority IR, the CFSR must annotate the rationale for delaying support in the affected incident. In addition, the CFSR either:
1. Emails the POC who will be affected by the delay for concurrence and copies it into the work information log.
2. The CFSR can create a document for the POC who will be affected by the delay to sign and attach to incident confirming authorization of support .
3. AWS-CSB confirms the delay based on: Vessel Availability, Customer Hold or Government Hold Required.
Use Customer Status Update Work Info Type
The method of annotation in the affected IR Worklog is to use the <DELAY> tag as follows:
<DELAY> IR Status Reason, + Rationale for delaying support
Scenario 1: CFSR Coordinates a vessel visit on 12 July but is not able to attend on 12 July due to vessel availability and requires rescheduling at a future date.
Worklog example: <DELAY> Vessel Availability, CFSR has not been able to attend vessel due to non-availability of vessel.
CFSR informed that vessel will be unavailable until 12 July due to normal weekend routine (or 4 day holiday, SGT’s Day, payday routine, vessel on a mission, vessel underway, OCCM, crew unavailable, etc.). Status changed to Pending – Vessel Availability.
Scenario 2: Vessel has multiple IRs and unit POC or AWS-CSB determines that bundling IRs is the most effective approach to supporting unit.
Worklog example: <DELAY> Government Hold Required, AWS-CSB authorized bundling of IRs in order to await parts shipment and support all IRs in one trip.
Encase capitalized key word in angle brackets <> and separate tag with a space at the end.
5119 January 2016 SIF Guidelines - Rev 40
Logistics Work Business Rules
Logistics Work Business Rules Inputs required for entering part information:
1. Enter Incident Task / Action in the Work Information Type.
2. Enter status of logistics preparation and procurement.
Examples: RFQs sent and date expected to receive response, RFQs received, PO sent, ARO date/location, Tracking number for shipping
3. Enter usage of parts or tools from critical spares: Shipment dates/locations, tracking numbers.
4. Other logistics information relevant to the timeline and completion of the tickets.
5219 January 2016 SIF Guidelines - Rev 40
Source Business Rule
Source The Source is utilized to determine in what manner communication is being made. The program currently only utilizes Email, Fax, Phone, Voice Mail or Walk In (in-person discussion) .
5319 January 2016 SIF Guidelines - Rev 40
Choose from these
Estimated Resolution Date
Select Specific Data tab and then select Misc Data sub-tab and enter or update the Target Date which is the Estimated Resolution Date. NOTE: This will be tracked on weekly reports.
5419 January 2016 SIF Guidelines - Rev 40
TIME TRACKER
5519 January 2016 SIF Guidelines - Rev 40
Time Tracker
To get to this point see IRM Web Login at beginning of presentation.
Type in Incident ID and select Search.
May also search using Affected System (vessel hull) and Affected Asset (vessel C4ISR asset).
5619 January 2016 SIF Guidelines - Rev 40
Select Time Tracker tab. See next slide for entering details.
5719 January 2016 SIF Guidelines - Rev 40
Enter Classification (default is Unclassified):
Admin - Logistics, QA, etc.
LSI – Lead System Integrator – use for core CFSRs.
OEM – Original Equipment Manufacturer (ex: Raytheon) Vendor - Support (Navigation Center, Makay, etc.)
Addl Info – Enter name of person that worked this time (one entry per person) Time Type - see next slide for Business Rules Enter Start and End times and press Add to commit entry.
Time Type
5819 January 2016 SIF Guidelines - Rev 40
Time Type Business Rules
1. Analysis Time: Time spent analyzing the cause of the incident/issue. Should additional analysis be necessary multiple entries will need to be made. Also includes administrative time for CFSR SIF entries, service reports and similar work.
2. Boots on Ground Time: This is a "point in time" vice a "duration in time". To enter a "point in time" the CFSR shall enter the same time for both start and end times. This is the actual time the CFSR arrives on the vessel for the initial visit. For a given Incident Report, the CFSR will enter an additional "Boots on Ground" time only when they return to the vessel for the first time following a change to the Status and/or Status Reason. When resolution requires multiple days but the Status of the IR does not change during that period, the "Boots on Ground" time should only be entered for the first day.
3. Labor Time: Labor Costs per incident. Multiple entries may be necessary to complete a repair. Time not associated with Vessel Access Time, Analysis Time, Procurement Time and local Travel Time.
4. Notification to SPO Time: SPO notified on issues, parts purchase, travel and so on. One entry per each communication needs to be entered. This is not a duration in time but a "point in time" that is captured by entering the same Start and End times.
5. POC Contact Time: Time the contractor initially established two-way communication or exchanged communication with the POC via phone or received email from POC. This is not a duration in time but a "point in time" that is captured by entering the same Start and End times.
6. Procurement Time: Time spent to procure parts, if multiple parts are ordered, one entry for each part should be entered. One entry is made for Pre-Order Time (Research/RFQ/Government Approval) and another for Post-Order Time (Delivery Tracking).
7. Travel Time: Time spent traveling from the starting point for the contractor, to the arrival of the contractor at the Vessel Location - not the physical location of the vessel but the Hotel or place of stay. A second entry needs to be added for the contractor return to their end point (mainly flight time). Per diem related.
8. Vessel Access Time: Time spent by the contractor awaiting access to the vessel while on-site. Multiple entries will be necessary, if access is granted, repair in progress, then the vessel becomes unavailable.
Tracking Note: In the event the CFSR is working on incidents on multiple vessels, the time information must be split across those incidents. Boots on the ground for the second vessel would be the actual time the contractor started work on that vessel and so on.
5919 January 2016 SIF Guidelines - Rev 40
Select Save to capture all time tracking changes.
6019 January 2016 SIF Guidelines - Rev 40
FINANCIALS
6119 January 2016 SIF Guidelines - Rev 40
Financials
After searching by Incident ID, select Financials under Links.
6219 January 2016 SIF Guidelines - Rev 40
Select Create and a new window appears for data entry (See next slide).
6319 January 2016 SIF Guidelines - Rev 40
Enter financial data:
Cost Center Code = AWS > AWS Costs Cost Type – See next slide for business rules Cost Classification = Actual – cost after invoice or Budget – estimated before invoice (based on AWS – CSB approval email) Type Classification – same as defined in Time Tracker here . See details on next slide for vendor listing.
Description - For Parts: Enter Nomenclature, Part Number, Serial Number and any additional vendor clarification.
- For Labor and Travel: Enter Core/Non-Core CFSR name
- Shipment: Enter shipping method and company name.
Related Cost – USD is default currency. If not, convert to USD currency (ensure all conversions are in USD).
Related Units - Quantity of items.
Unit Type - Flat Rate – for daily rate or parts (fixed costs).
Hours – if not a flat rate, provide hourly rate and insert number of hours in Related Units (variable costs).
Cost Category is always Incident
Cost Classification
Type
Classification (see next slide for Vendor listing)
Related Cost Unit Type
Cost Type Cost Center
6419 January 2016 SIF Guidelines - Rev 40
Type Classification (Vendor listing)
Enter Vendor in Type Classification:
For Vendor you can enter the actual vendor name by selecting Type Classification > Vendor > Vendor Name.
If the vendor name is not listed, select the generic entry Vendor at the top of the list and enter clarification in the Description section.
Only one vendor name may be entered.
6519 January 2016 SIF Guidelines - Rev 40
Cost Type Business Rules
1. Labor: Costs associated with Labor for this specific incident. If the contractor is working on multiple incidents, the costs for Labor need to be split by the number of incidents and entered for each incident.
2. Repair Parts: Cost for parts utilized for the incident being worked. If multiple assets are purchased one entry per asset is required. Enter unit type as flat rate and enter related units with quantity for any one asset. To include all parts purchased with part number, serial number and warranty data. This should also be captured in the
Description field of the main entry.
3. Shipment: Shipping cost for parts and/or materials utilized to repair or replace defective items. Shipping costs are entered on a per shipment basis. If 3 shipments are made with repair parts, 3 entries should be entered.
4. Travel: Costs associated with travel for this specific incident. If the contractor is working on multiple incidents, the costs for travel need to be split by the number of incidents and entered for each incident based on date incurred (last day of travel).
Note 1: In this section, one entry is required for each item completed as the incident progresses to resolution.
Note 2: STAMIS Standard Operating Procedure notes that KNB travel is not calculated the same as CONUS travel and details how the calculations are made.
6619 January 2016 SIF Guidelines - Rev 40
RESOLVE & CLOSE INCIDENT
6719 January 2016 SIF Guidelines - Rev 40
Resolve Incidents
Enter detailed resolution information.
Enter troubleshooting steps, major repair steps, parts used, tests performed, cause of failure and any new or different faults found than what were reported by the incident POC. Also document if proper instructions or training were provided to the contact (mariner) if necessary.
6819 January 2016 SIF Guidelines - Rev 40
Resolution Field Business Rules
The following template of tags (not including definitions) is automatically added to the Resolution field when the Resolved status reason is selected. These tags are to be used in documenting the details to a resolution of an incident.
Resolution Template:
<FAULT> Verified fault reported? If not, what was the actual fault vs. reported fault?
<TROUBLESHOOT> Troubleshooting steps / Major Repair steps / Tests performed / How incident was resolved.
<PARTS> Parts used or attempted. Provide details with part numbers and serial numbers in the financial data section.
<CAUSE> Apparent cause of the failure. Be specific in detailing observable problems and expanding upon the selection represented in the “Cause” field.
<ADDITIONAL> Additional or different faults discovered.
<COMMUNICATION> Any discussion, procedures or training provided to the soldier.
Note: Ensure there is a space after the right bracket > before typing information.
6919 January 2016 SIF Guidelines - Rev 40
Resolution Cause
Verify and update as required if incorrect:
Cause – General cause of problem or failure. See Cause list at right for acceptable entries.
Press Save.
What you see after you select Specific Data > Ticket Origination.
Cause
Definition: General cause of problem or failure.
1. Configuration Error – Hardware
2. Configuration Error – Software
3. Environmental Issue
4. Equipment Missing
5. Inadequate Maintenance
6. Incorrect Installation
7. Incorrect Operation
8. Incorrect Repair
9. Normal Wear and Tear
10. Obsolescence
11. Unknown - Unable to Observe Fault
12. PMCS
13. Grooming
14. Gyro Service
15. Software Installation
16. Hardware Installation
17. Asset Testing
18. Programmatic Services
19. Training
7019 January 2016 SIF Guidelines - Rev 40
Resolve Incidents
When the issues associated with the incident are resolved, the status of the incident is updated to Resolved.
Enter Status Reason for the resolved state as No Further Action Required . Once all data is entered ensure to attach the Final Service Report. Verify information through Quality Control in accordance with this guideline
– LSI may then close the incident.
7119 January 2016 SIF Guidelines - Rev 40
Closure Source
Closure Source - is always LSI since it is manually closed.
Status – is Closed Status Reason - is No Further Action .
7219 January 2016 SIF Guidelines - Rev 40
CANCELLING AN INCIDENT
7319 January 2016 SIF Guidelines - Rev 40
Cancelling An Incident
Before cancelling an incident, input rationale into the work information log. Also attach the email with direction/approval from AWS-CSB and then select Add.
Change Status to Cancelled Select Save
7419 January 2016 SIF Guidelines - Rev 40
BACKUP SLIDES
7519 January 2016 SIF Guidelines - Rev 40
Environmental Condition Business Rules
Status Business Rules
Pending Status Reason Business Rules
Friday Night and Weekend IR Business Rules
Work Info and Source Business Rules
Logistics Work Business Rules
Time Type Business Rules
Cost Type Business Rules
Resolution Field Business Rules
Resolution Cause Business Rule
Incident Prioritization Matrix
AWS Asset Impact Guide
Hull Number to Unit Number
Business Rules Quick Reference
7619 January 2016 SIF Guidelines - Rev 40
Hull Number to Unit Number Vessel Type Hull Number UIC Vessel Type Hull Number UIC
LCM MOD 2 LCM-8594 WCPMAA LCU-2000 LCU-2015 WMFQAA
LCM MOD 2 LCM-8595 WMER01 LCU-2000 LCU-2016 WMFQAA
LCM MOD 2 LCM-8596 WS0ZAA LCU-2000 LCU-2017 WCL8AA
LCM MOD 2 LCM-8600 WMER01 LCU-2000 LCU-2018 WMFQAA
LCM MOD 2 LCM-8606 WMER01 LCU-2000 LCU-2019 WMFQAA
LCM MOD 2 LCM-8617 WMER02 LCU-2000 LCU-2020 WMFQAA
LCU-2000 LCU-2001 WCL8AA LCU-2000 LCU-2021 W283AA
LCU-2000 LCU-2002 WMFQAA LCU-2000 LCU-2022 WMFQAA
LCU-2000 LCU-2003 WMFQAA LCU-2000 LCU-2023 WCL8AA
LCU-2000 LCU-2004 WCL8AA LCU-2000 LCU-2024 WMFQAA
LCU-2000 LCU-2005 WCL8AA LCU-2000 LCU-2025 WQWNAA
LCU-2000 LCU-2006 WCL8AA LCU-2000 LCU-2026 WSZLH1
LCU-2000 LCU-2007 WMFQAA LCU-2000 LCU-2027 WMFQAA
LCU-2000 LCU-2008 WMFQAA LCU-2000 LCU-2028 WQWNAA
LCU-2000 LCU-2009 WMFQAA LCU-2000 LCU-2029 WMFQAA
LCU-2000 LCU-2010 WMFQAA LCU-2000 LCU-2030 WQWNAA
LCU-2000 LCU-2011 WCL8AA LCU-2000 LCU-2031 WSZLAA
LCU-2000 LCU-2012 WMFQAA LCU-2000 LCU-2032 WQWNAA
LCU-2000 LCU-2013 WMFQAA LCU-2000 LCU-2033 WQWNAA
LCU-2000 LCU-2014 WMFQAA LCU-2000 LCU-2034 WMFQAA
LCU-2000 LCU-2035 WMFQAA
Return to UIC Origination Data Slide
7719 January 2016 SIF Guidelines - Rev 40
Return to Unit Origination Data Slide
*** PENDING UPDATE ***
Hull Number to Unit Number Vessel Type Hull Number UIC Vessel Type Hull Number UIC
LSV (I) LSV-1 WCQQAA ST-900 ST-901 WMFUAA
LSV (I) LSV-2 WFKHAA ST-900 ST-902 WMCNAA
LSV (I) LSV-3 WZPTAA ST-900 ST-903 WMCNAA
LSV (I) LSV-4 WCRUAA ST-900 ST-904 WMCNAA
LSV (I) LSV-5 WCQ9AA ST-900 ST-905 WSYWAA
LSV (I) LSV-6 WC6GAA ST-900 ST-906 WSYWAA
LSV (VII) LSV-7 WR7KAA ST-900 ST-907 WMCNAA
LSV (VII) LSV-8 WV4GAA ST-900 ST-908 WMFUAA
LT-100 LT-1974 (FLT III) WMFUAA ST-900 ST-909 WMFUAA
LT-100 LT-2085 (FLT III) WSYWAA ST-900 ST-910 WMFUAA
LT-100 LT-2096 (FLT III) W1QAAA ST-900 ST-911 WCL6AA
LT-128MOD LT-801 WMCNAA ST-900 ST-912 WSZHAA
LT-128 LT-802 WSYWAA ST-900 ST-913 WCL6AA
LT-128MOD LT-803 WSZHAA ST-900 ST-914 WSZBAA
LT-128MOD LT-804 WMCNAA ST-900 ST-915 WSZHAA
LT-128MOD LT-805 WCL6AA ST-900 ST-916 WQWNAA
LT-128 LT-806 WMFUAA BD-6800 BD-6802 WMCNAA
Return to UIC Origination Data Slide
7819 January 2016 SIF Guidelines - Rev 40
Return to Unit Origination Data Slide
*** PENDING UPDATE ***
File details come from the government source that posted it. Updated .