Exhibit_A_-_CDRLs_EH9C0460EH_19Q0116.rtf
RTF text file 91 KB Posted
- Attached to
- RFQ for M295 Decontamination Kit
- Solicitation number
- W56HZV-19-Q-0116
About this file
Exhibit A - CDRLs
Text of this file
CONTRACT DATA REQUIREMENTS LIST
DD FORM 1423 (MECHANIZED)
CATEGORY: MISC SYSTEM/ITEM: M295 INDIVIDUAL EQUIPMENT
DECONTAMINATION KIT (IEDK)
TO CONTRACT/PR: EH9C0460EH
NSN: 6850-01-357-8456
1. SEQUENCE NUMBER 14. DRFT/REG/REPRO
2. TITLE OF DATA ITEM DISTRIBUTION COPIES
3. SUBTITLE
4. DATA ITEM NUMBER
5. CONTRACT REFERENCE
6. TECHNICAL OFFICE 7. DD 250 8. APP CODE 9. DIST STATEMENT REQUIRED
10. FREQUENCY 11. AS OF DATE
12. DATE OF 1ST SUBMISSION 13. DATE OF SUBSEQUENT SUBMISSION
15. TOTAL 16. REMARKS
1. A001 14.
SEE ADDRESS CODE / /
2. ENGINEERING CHANGE PROPOSAL (ECP) DISTRIBUTION
ATTACHED**
3.
4. DI-SESS-80639
5. SECTION C
6. RDCB-DEM 7. LT 8. N/A 9. *
10. ASREQ 11. N/A 15. TOTAL 0 / 0 / 0
12. ASREQ 13. ASREQ
16. REMARKS
DATA MUST BE IN GOVERNMENT COMPATIBLE SOFTWARE (e.g., MICROSOFT OFFICE OR PORTABLE DOCUMENT FORMAT (pdf)). *DISTRIBUTION STATEMENT WILL BE ASSIGNED
AND IMPLEMENTED BY THE DOD CONFIGURATION MANAGER. **SUBMIT ELECTRONICALLY TO
USARMY.RIA.CCDC-CBC.MBX.CMACTION@MAIL.MIL. ELECTRONIC FILES SHALL BE
LESS THAN 7MB. THE PREFERRED METHOD IS THE DD FORM 1692 WHICH IS LOCATED AT
http://www.dtic.mil/whs/directives/infomgt/forms/. CONTRACTOR FORMAT
ALTERNATIVE TO THE DD FORM IS ACCEPTABLE PROVIDED THE NECESSARY DATA
ELEMENTS ARE PROVIDED.
1. A002 14.
SEE ADDRESS CODE / /
2. REQUEST FOR VARIANCE (RFV) DISTRIBUTION
ATTACHED**
3.
4. DI-SESS-80640
5. SECTION C
6. RDCB-DEM 7. LT 8. N/A 9. *
10. ASREQ 11. N/A 15. TOTAL 0 / 0 / 0
12. ASREQ 13. ASREQ
16. REMARKS
DATA MUST BE IN GOVERNMENT COMPATIBLE SOFTWARE (e.g., MICROSOFT OFFICE OR PORTABLE DOCUMENT FORMAT (pdf)). *DISTRIBUTION STATEMENT WILL BE ASSIGNED
AND IMPLEMENTED BY THE DOD CONFIGURATION MANAGER. **SUBMIT ELECTRONICALLY TO
USARMY.RIA.CCDC-CBC.MBX.CMACTION@MAIL.MIL. ELECTRONIC FILES SHALL BE
LESS THAN 7MB. THE PREFERRED METHOD IS THE DD FORM 1694 WHICH IS LOCATED AT
http://www.dtic.mil/whs/directives/infomgt/forms/. CONTRACTOR FORMAT
ALTERNATIVE TO THE DD FORM IS ACCEPTABLE PROVIDED THE NECESSARY DATA
ELEMENTS ARE PROVIDED.
1. A003 14.
SEE ADDRESS CODE / /
2. NOTICE OF REVISION (NOR) DISTRIBUTION
ATTACHED**
3.
4. DI-SESS-80642
5. SECTION C
6. RDCB-DEM 7. LT 8. N/A 9. *
10. ASREQ 11. N/A 15. TOTAL 0 / 0 / 0
12. ASREQ 13. ASREQ
16. REMARKS
DATA MUST BE IN GOVERNMENT COMPATIBLE SOFTWARE (e.g., MICROSOFT OFFICE OR PORTABLE DOCUMENT FORMAT (pdf)). *DISTRIBUTION STATEMENT WILL BE ASSIGNED
AND IMPLEMENTED BY THE DOD CONFIGURATION MANAGER. **SUBMIT ELECTRONICALLY TO
USARMY.RIA.CCDC-CBC.MBX.CMACTION@MAIL.MIL. ELECTRONIC FILES SHALL BE
LESS THAN 7MB. THE PREFERRED METHOD IS THE DD FORM 1695 WHICH IS LOCATED AT
http://www.dtic.mil/whs/directives/infomgt/forms/. CONTRACTOR FORMAT
ALTERNATIVE TO THE DD FORM IS ACCEPTABLE PROVIDED THE NECESSARY DATA
ELEMENTS ARE PROVIDED.
1. A004 14.
CCDC-CBC RI / 1 / 0
2. REPORT, RECORD OF MEETING/MINUTES THRU QAR / 1 / 0
PCO / 1 / 0
3.
4. DI-ADMN-81505
5. SECTION C/SOW
6. RDCB-DES-E 7. LT 8. N/A 9. N/A
10. ASREQ 11. N/A 15. TOTAL 0 / 3 / 0
12. ASREQ 13. ASREQ
16. REMARKS
MINUTES DUE WITHIN 30 DAYS AFTER MEETING MINUTES SHALL BE SUBMITTED
ELECTRONICALLY TO THE PCO.
1. A005 14.
2. TEST/INSPECTION REPORTS THRU QAR*** / 0 / 0
PCO / 1 / 0
3. FIRST ARTICLE TEST REPORT (FATR) CCDC-CBC RI / 1 / 0
(CONTRACTOR)
4. DI-NDTI-80809
5. SECTION E
6. RDCB-DES-Q 7. LT 8. A** 9. C
10. ASREQ* 11. N/A 15. TOTAL 0 / 2 / 0
12. ASREQ* 13. ASREQ*
16. REMARKS
*FATR DATES SHALL BE STATED IN THE DELIVERY SCHEDULE. **THE GOVT HAS 30 DAYS AFTER RECEIPT OF FATR FOR APPROVAL/DISAPPROVAL. ***SUBMIT
ELECTRONICALLY THRU THE QAR TO THE CONTRACT SPECIALIST/PCO AND CCDC CBC QA
AT usarmy.ria.ccdc-cbc.mbx.qa@mail.mil. WHEN THE REPORT FILES ARE TOO
LARGE TO SEND OVER EMAIL, THE CONTRACTOR MAY SEND THE REPORT THROUGH THE
SAFE ACCESS FILE EXCHANGE (SAFE) APPLICATION (FILE SIZE UP TO 2GB). SEE
HTTPS://SAFE.AMRDEC.ARMY.MIL/SAFE/GUIDE.ASPX FOR MORE INFORMATION.
1. A006 14.
ACO 0 / 1 / 0
2. TEST/INSPECTION REPORTS THRU QAR 0 / 1 / 0
PCO 0 / 1 / 0
3. PRODUCTION LOT ACCEPTANCE TEST REPORT
(CONTRACTOR)
4. DI-NDTI-80809
5. SECTION E
6. RDCB-DES-Q 7. LT 8. ** 9. C
10. ASREQ* 11. N/A 15. TOTAL 0 / 3 / 0
12. ASREQ* 13. ASREQ
16. REMARKS
*THIS REPORT SHALL BE SUBMITTED AT THE COMPLETION OF A NEW PRODUCTION LOT.
REPORT SHALL BE SUBMITTED TO THE QUALITY ASSURANCE REPRESENTATIVE (QAR)
WHENEVER A NEW LOT OF MATERIAL HAS COMPLETED TESTING. PRIOR TO BEGINNING
PRODUCTION, THE CONTRACTOR SHALL SUBMIT A QUALITY PLAN TO THE QAR FOR
REVIEW AND APPROVAL, ON HOW THEY WILL COMPLY WITH THE REQUIREMENTS OF THE
PRODUCTION LOT TEST. ONCE THE QAR APPROVES THE QUALITY PLAN FOR THE
PRODUCTION LOT TESTING, THE APPROVED METHOD WILL BE USED THROUGHOUT THE
LIFE OF THE CONTRACT TO VALIDATE COMPLIANCE WITH THE CONTRACT CLAUSE. QAR
WILL PROVIDE WRITTEN APPROVAL OF THE QA PLAN TO THE CONTRACTOR. **THE
CONTRACTOR SHALL SUBMIT THE PRODUCTION LOT TEST REPORT TO THE QAR ON A
DD1222 OR COMPARABLE DOCUMENT FOR ACCEPTANCE WITHIN TEN DAYS OF COMPLETION
OF THE TESTING. THE QAR HAS 30 WORK DAYS AFTER RECEIPT TO REVIEW AND
PROVIDE APPROVAL/DISAPPROVAL IN WRITING TO THE CONTRACTOR. APPROVAL OF
THE PRODUCTION LOT TEST REPORT SHALL BE APPROVAL OF THE LOT. WHEN THE
REPORT FILES ARE TOO LARGE TO SEND OVER EMAIL, THE CONTRACTOR MAY SEND THE
REPORT THROUGH THE SAFE ACCESS FILE EXCHANGE (SAFE) APPLICATION (FILE SIZE
UP TO 2GB). SEE HTTPS://SAFE.AMRDEC.ARMY.MIL/SAFE/GUIDE.ASPX FOR MORE
INFORMATION. TESTING SHALL BE PERFORMED IN ACCORDANCE WITH THE CONTRACT
CLAUSE FOR THIS REQUIREMENT.
1. A007 14.
QAR 0 / 1 / 0
2. CERTIFICATE OF COMPLIANCE PCO 0 / 1 / 0
(Blocks 3 thru 19 of Form 010) CCDC-CBC RI 0 / 1 / 0 3.
4. DI-MISC-81356A*
5. SECTION I**
6. RDCB-DES-Q (RI) 7. LT 8. N/A 9. N/A
10. ASREQ 11. N/A 15. TOTAL 0 / 3 / 0
12. ASREQ 13. ASREQ
16. REMARKS
*MODIFY DI-MISC-81356, 2.I TO READ: "A STATEMENT ON CONTRACTOR LETTERHEAD,
CERTIFYING THAT ALL ITEMS FURNISHED ON THE CONTRACT ARE IN FULL COMPLIANCE
WITH THE TDP (INCLUDING REVISION OF THE DRAWING AND SPECIFICATION), ALL
SPECIFICATIONS AND CONTRACT REQUIREMENTS.". SUBMIT CERTIFICATE OF
COMPLIANCE(S) WITH THE FIRST ARTICLE TEST REPORT. 2.G TO READ NSN (IF
APPLICABLE) AND PART NUMBER. **FIRST ARTICLE APPROVAL CONTRACTOR TESTING.
SUBMIT ELECTRONICALLY TO THE PCO.
DATE: 8 February 2019
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it.