CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TBD A TDP TM OTHER X
D. SYSTEM/ITEM
Army Watercraft Systems STS
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A001
2. TITLE OF DATA ITEM
Monthly Status Report (MSR)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-80227(T) (See Blk 16)
5. CONTRACT REFERENCE
C.8.1
6. REQUIRING OFFICE
SFAE-CSS-TS-W
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
REQUIRED
Monthly b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft Final
N/A N/A Reg Repro
16. REMARKS SEE BLOCK 16
Delete paragraphs 10.3 g. and k. from DID DI-MGMT-80227 and include the following additional information in the report.
q. Total funding by CLIN
r. Costs reported by CLIN
s. Description of services performed
t. Field Technical Representative (if applicable)
u. Person hours reported by individual’s name and the hourly pay rate of the individual
v. Budget at completion
w. Budget over/under if hours continue to be expended at current rate
x. The contractor shall submit a signed certificate showing compliance with the following antiterrorism clauses:
• 52.209-4020, AT Level I Training
• 52.209-4021, AT Awareness Training for Contractor Personnel Traveling Overseas
• 52.204-4020, Access and General Protection/Security Policy and Procedures
• 52.215-4405, US Army Garrison Detroit Arsenal Installation Local Access Clause
• 52.209-4022, iWATCH (See Something, Say Something) Training
• 52.204-4023, Impact on contractor performance during increased FPCON during periods of increased threat.
• 52.204-4024, Random Antiterrorism Measures Program (RAMP) participation
• 252.225-7040, For Contractors Authorized to Accompany the Force
• 252.225-7043, For Contract Requiring Performance or Delivery in a Foreign Country
• 52.204-4021, Employees Who Require Access to Government Information Systems
• 52.214-4400, TACOM Warren Network Access Local Clause
• 52.209-4024, Information Assurance (IA)/Information Technology (IT) Training
• 252.239.7001, Information Assurance (IA)/Information Technology (IT) Certification
• 52.204-9, Contractor will return all issued U.S. Government Common Access Cards, installation badges, and/or access passes to the COR when the contract is completed or when a contractor employee no longer requires access to the installation or facility.
• 52.204-2, For Contracts That Require Handling or Access to Classified Information
• 252.204-7008, Information Subject to Export Control Laws/International Traffic in Arms Regulation (ITAR)
• 52.204-4022, For Contracts That Require an OPSEC Standing Operating Procedures/Plan
Block 14: Submit via email to COR and as directed in the Task Order.
15. TOTAL
G. PREPARED BY
Dave Hogan
H. DATE
7 September 2016
I. APPROVED BY
J. DATE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 1
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TBD A TDP TM OTHER X
D. SYSTEM/ITEM
Army Watercraft Systems STS
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
A002
Schedules
DI-MGMT-81791(T) (See Blk 16)
5. CONTRACT REFERENCE
C.1.4, C.3.5.1
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
MTHLY SEE BLK 16 b. COPIES
8. APP CODE C (SEE BLK 16) 11. AS OF DATE 13. DATE OF SUBSEQUENT
N/A N/A SEE BLK 16 Reg Repro
16. REMARKS SEE BLOCK 16
Block 4 -Tailoring:
Delete paragraphs 2.1, 3.13. Deliver in MS Project or Adobe PDF format.
Schedule shall include all key tasks, events, and milestones including beginning and end dates for each and percentage complete as of the submission date.
Block 9: DISTRIBUTION STATEMENT C: DISTRIBUTION
AUTHORIZED TO U.S. GOVERNMENT AGENCIES AND THEIR
CONTRACTORS. REASON: EXPORT CONTROLLED. DATE OF
DETERMINATION: 10-10-2014. OTHER REQUESTS FOR THIS
DOCUMENT SHALL BE REFERRED TO THE TACOM LCMC. ARMY
WATERCRAFT PRODUCT OFFICE, ATTN: SFAE-CSS-TS-W, WARREN,
MICHIGAN 48397-5000.
WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.
Blocks 12 and 13: First submission shall be no later than 7 calendar days after the Kickoff meeting. Subsequent submissions shall be at least monthly. When the contractor becomes aware of a schedule slip rendering the most recent schedule submission inaccurate, the contractor shall submit an updated schedule within 10 days.
Dave Hogan
H. DATE
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TBD A TDP TM OTHER X
D. SYSTEM/ITEM
Army Watercraft Systems STS
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
A003
REPORT, RECORD OF MEETING MINUTES
Meeting Minutes
4. AUTHORITY (Data Acquisition Document No.)
DI‐ADMN‐81505(T) (See BLK 16)
5. CONTRACT REFERENCE
C.2.3, C.3.2.2, C.3.2.5
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
SEE BLK 16 SEE BLK 16 b. COPIES
N/A N/A SEE BLK 16 Reg Repro
16. REMARKS SEE BLOCK 16
Block 4: Delete paragraphs 10.3, 10.4.
Block 9: DISTRIBUTION STATEMENT C: DISTRIBUTION
AUTHORIZED TO U.S. GOVERNMENT AGENCIES AND THEIR
CONTRACTORS. REASON: EXPORT CONTROLLED. DATE OF
DETERMINATION: 10-10-2014. OTHER REQUESTS FOR THIS
DOCUMENT SHALL BE REFERRED TO THE TACOM LCMC. ARMY
WATERCRAFT PRODUCT OFFICE, ATTN: SFAE-CSS-TS-W, WARREN,
MICHIGAN 48397-5000.
WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.
Block 10, 12, and 13: Record of the minutes shall be submitted electronically within two business days after subject meeting unless otherwise directed by the Task Order.
Dan Templin
H. DATE
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TBD A TDP TM OTHER X
D. SYSTEM/ITEM
Army Watercraft Systems STS
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
A004
Technical Report
DI-MISC-80711A(T) (See Blk 16)
5. CONTRACT REFERENCE
C.3.1, C.3.1.1, C.3.3
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
ASREQ SEE BLK 16 b. COPIES
A N/A SEE BLK 16 Reg Repro
16. REMARKS SEE BLOCK 16
Block 4 -Tailoring:
Delete paragraph 10.2 – contractor format acceptable.
Block 9: DISTRIBUTION STATEMENT C: DISTRIBUTION
AUTHORIZED TO U.S. GOVERNMENT AGENCIES AND THEIR
CONTRACTORS. REASON: EXPORT CONTROLLED. DATE OF
DETERMINATION: 10-10-2014. OTHER REQUESTS FOR THIS
DOCUMENT SHALL BE REFERRED TO THE TACOM LCMC. ARMY
WATERCRAFT PRODUCT OFFICE, ATTN: SFAE-CSS-TS-W, WARREN,
MICHIGAN 48397-5000.
WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.
Blocks 12 and 13: Deliver in accordance with schedule submitted under
CDRL A002.
Dave Hogan
H. DATE
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR
A005
ENGINEERING CHANGE PROPOSAL (ECP)
DI-SESS-80639
5. CONTRACT REFERENCE
C.3.2.3, C.3.2.5, C.4.1, C.4.9
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT REQUIRED
A N/A SEE BLK 16 Reg Repro
16. REMARKS SEE BLOCK 16
For a PECP, submission of a NOR or TDP is not required.
BLK 8: This CDRL requires approval from the Contracting Officer's Representative (COR).
Block 9: DISTRIBUTION STATEMENT C: DISTRIBUTION
AUTHORIZED TO U.S. GOVERNMENT AGENCIES AND THEIR
CONTRACTORS. REASON: EXPORT CONTROLLED. DATE OF
DETERMINATION: 10-10-2014. OTHER REQUESTS FOR THIS
DOCUMENT SHALL BE REFERRED TO THE TACOM LCMC. ARMY
WATERCRAFT PRODUCT OFFICE, ATTN: SFAE-CSS-TS-W, WARREN,
MICHIGAN 48397-5000.
WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.
Blocks 12 and 13: Deliver in accordance with the applicable Task Order.
Block 14: This CDRL shall be submitted electronically to the PD AWS STS SharePoint CDRL Module site. The CDRL Module website will be provided at the Start Of Work Meeting. The contractor shall notify the Government IPT Lead when data has been submitted. A list of IPT leads will be provided to the contractor at the Start of Work Meeting (SOWM).
Forms are available from http://www.dtic.mil/whs/directives/forms/index.htm or https://contracting.tacom.army.mil/engr/engrchange.htm
Dan Templin
H. DATE
14 April 2017
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TBD A TDP TM OTHER X
D. SYSTEM/ITEM
Army Watercraft Systems STS
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
A006
REQUEST FOR VARIANCE (RFV)
DI-SESS-80640
5. CONTRACT REFERENCE
C.3.2.4, C.3.4, C.4.10
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
A N/A SEE BLK 16 Reg Repro
16. REMARKS SEE BLOCK 16
BLK 8: This CDRL requires approval from the Contracting Officer's Representative (COR).
Block 9: DISTRIBUTION STATEMENT C: DISTRIBUTION
AUTHORIZED TO U.S. GOVERNMENT AGENCIES AND THEIR
CONTRACTORS. REASON: EXPORT CONTROLLED. DATE OF
DETERMINATION: 10-10-2014. OTHER REQUESTS FOR THIS
DOCUMENT SHALL BE REFERRED TO THE TACOM LCMC. ARMY
WATERCRAFT PRODUCT OFFICE, ATTN: SFAE-CSS-TS-W, WARREN,
MICHIGAN 48397-5000.
WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.
Blocks 12 and 13: Deliver in NLT 5 working days prior to scheduled date of work subject to requested variance.
Block 14: This CDRL shall be delivered into Windchill ACE/ProjectLink unless otherwise instructed by Task Order. Access Link https://ace2.tacom.army.mil/index.html.
Forms are available from http://www.dtic.mil/whs/directives/forms/index.htm or https://contracting.tacom.army.mil/engr/engrchange.htm
Dan Templin
H. DATE
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TBD A TDP x TM OTHER
D. SYSTEM/ITEM
Army Watercraft Systems STS
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
A007
Technical Data Package (TDP)
TDP (Developmental or Production)
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-80776A(T)
5. CONTRACT REFERENCE
C.3.2.5, C.4.3
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
A N/A SEE BLK 16 Reg Repro
16. REMARKS SEE BLOCK 16
Block 4: Tailoring: Remove all specific paragraph references to MIL-STD- 31000. Latest revision of MIL-STD-31000 applies.
Block 9: DISTRIBUTION STATEMENT C: DISTRIBUTION
AUTHORIZED TO U.S. GOVERNMENT AGENCIES AND THEIR
CONTRACTORS. REASON: EXPORT CONTROLLED. DATE OF
DETERMINATION: 10-10-2014. OTHER REQUESTS FOR THIS
DOCUMENT SHALL BE REFERRED TO THE TACOM LCMC. ARMY
WATERCRAFT PRODUCT OFFICE, ATTN: SFAE-CSS-TS-W, WARREN,
MICHIGAN 48397-5000.
WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.
Blocks 12 and 13: Deliver in accordance with schedule delivered under
CDRL A002.
Block 14: This CDRL shall be delivered into Windchill ACE/ProjectLink unless otherwise instructed by Task Order. Access Link https://ace2.tacom.army.mil/index.html.
BLK 14b Copies: Final Reg = one set each of all representations (2D CAD, 3D CAD, PDF, STEP, etc.) of TDP.
Dan Templin
H. DATE
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TBD A TDP TM OTHER X
D. SYSTEM/ITEM
Army Watercraft Systems STS
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
A008
CONFIGURATION MANAGEMENT PLAN (CMP)
DI-SESS-80858
5. CONTRACT REFERENCE
C.4.5
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
A N/A SEE BLK 16 Reg Repro
16. REMARKS SEE BLOCK 16
BLK 8: This CDRL requires approval from the Contracting Officer's Representative (COR).
Block 9: DISTRIBUTION STATEMENT C: DISTRIBUTION
AUTHORIZED TO U.S. GOVERNMENT AGENCIES AND THEIR
CONTRACTORS. REASON: EXPORT CONTROLLED. DATE OF
DETERMINATION: 10-10-2014. OTHER REQUESTS FOR THIS
DOCUMENT SHALL BE REFERRED TO THE TACOM LCMC. ARMY
WATERCRAFT PRODUCT OFFICE, ATTN: SFAE-CSS-TS-W, WARREN,
MICHIGAN 48397-5000.
WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.
Blocks 12 and 13: Deliver NLT 30 days after Task Order award.
Block 14: This CDRL shall be delivered into Windchill ACE/ProjectLink unless otherwise instructed by Task Order. Access Link https://ace2.tacom.army.mil/index.html.
Dan Templin
H. DATE
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TBD A TDP TM OTHER X
D. SYSTEM/ITEM
Army Watercraft Systems STS
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
A009
ENGINEERING RELEASE RECORD (ERR)
DI-SESS-80463
5. CONTRACT REFERENCE
C.4.2
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
A N/A SEE BLK 16 Reg Repro
16. REMARKS SEE BLOCK 16
BLK 8: This CDRL requires approval from the Contracting Officer's Representative (COR).
Block 9: DISTRIBUTION STATEMENT C: DISTRIBUTION
AUTHORIZED TO U.S. GOVERNMENT AGENCIES AND THEIR
CONTRACTORS. REASON: EXPORT CONTROLLED. DATE OF
DETERMINATION: 10-10-2014. OTHER REQUESTS FOR THIS
DOCUMENT SHALL BE REFERRED TO THE TACOM LCMC. ARMY
WATERCRAFT PRODUCT OFFICE, ATTN: SFAE-CSS-TS-W, WARREN,
MICHIGAN 48397-5000.
WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.
Blocks 12 and 13: Deliver in accordance with schedule submitted under
CDRL A002.
Block 14: This CDRL shall be delivered into Windchill ACE/ProjectLink unless otherwise instructed by Task Order. Access Link https://ace2.tacom.army.mil/index.html.
Forms are available from http://www.dtic.mil/whs/directives/forms/index.htm
Dan Templin
H. DATE
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TBD A TDP TM OTHER X
D. SYSTEM/ITEM
Army Watercraft Systems STS
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
A010
Interface Control Document (ICD)
DI-SESS-81248B
5. CONTRACT REFERENCE
C.4.7
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
8. APP CODE (SEE BLK 16) 11. AS OF DATE 13. DATE OF SUBSEQUENT
A N/A SEE BLK 16 Reg Repro
16. REMARKS SEE BLOCK 16
BLOCK 8: This CDRL requires approval from the Contracting Officer's Representative (COR).
BLOCK 9: The ICD shall be marked with the applicable distribution statement and, as applicable, export control warning, in accordance with the Task Order as determined by the requiring office in block 6 of the
CDRL.
Blocks 12 and 13: Deliver in accordance with schedule delivered under
CDRL A002.
Block 14: This CDRL shall be delivered into Windchill ACE/ProjectLink
Dave Hogan
H. DATE
7 September 16
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TBD A TDP TM OTHER X
D. SYSTEM/ITEM
Army Watercraft Systems STS
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
A011
CONFIGURATION STATUS ACCOUNTING INFORMATION (CSAI)
DI-SESS-81253
5. CONTRACT REFERENCE
C.4.11
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
A N/A SEE BLK 16 Reg Repro
16. REMARKS SEE BLOCK 16
BLK 8: This CDRL requires approval from the Contracting Officer's Representative (COR).
Block 9: DISTRIBUTION STATEMENT C: DISTRIBUTION
AUTHORIZED TO U.S. GOVERNMENT AGENCIES AND THEIR
CONTRACTORS. REASON: EXPORT CONTROLLED. DATE OF
DETERMINATION: 10-10-2014. OTHER REQUESTS FOR THIS
DOCUMENT SHALL BE REFERRED TO THE TACOM LCMC. ARMY
WATERCRAFT PRODUCT OFFICE, ATTN: SFAE-CSS-TS-W, WARREN,
MICHIGAN 48397-5000.
WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.
Blocks 12 and 13: Deliver in conjunction with TDP deliverable or Technical Report deliverable as applicable (CDRL A007 or A004).
Block 14: This CDRL shall be delivered into Windchill ACE/ProjectLink
Dan Templin
H. DATE
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TBD A TDP TM OTHER X
D. SYSTEM/ITEM
Army Watercraft Systems STS
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
A012
CONFIGURATION AUDIT PLAN (CAP)
DI-SESS-81646
5. CONTRACT REFERENCE
C.4.13
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
A N/A SEE BLK 16 Reg Repro
16. REMARKS SEE BLOCK 16
BLK 8: This CDRL requires approval from the Contracting Officer's Representative (COR).
Block 9: DISTRIBUTION STATEMENT C: DISTRIBUTION
AUTHORIZED TO U.S. GOVERNMENT AGENCIES AND THEIR
CONTRACTORS. REASON: EXPORT CONTROLLED. DATE OF
DETERMINATION: 10-10-2014. OTHER REQUESTS FOR THIS
DOCUMENT SHALL BE REFERRED TO THE TACOM LCMC. ARMY
WATERCRAFT PRODUCT OFFICE, ATTN: SFAE-CSS-TS-W, WARREN,
MICHIGAN 48397-5000.
WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.
Blocks 12 and 13: Deliver in accordance with schedule delivered under
CDRL A002.
Block 14: This CDRL shall be delivered into Windchill ACE/ProjectLink
Forms are available from http://www.dtic.mil/whs/directives/forms/index.htm
Dan Templin
H. DATE
https://ace2.tacom.army.mil/index.html
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TBD A TDP TM OTHER X
D. SYSTEM/ITEM
Army Watercraft Systems STS
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
A013
CONFIGURATION AUDIT SUMMARY REPORT (CASR)
DI-SESS-81022
5. CONTRACT REFERENCE
C.4.14
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
A N/A SEE BLK 16 Reg Repro
16. REMARKS SEE BLOCK 16
BLK 8: This CDRL requires approval from the Contracting Officer's Representative (COR).
Block 9: DISTRIBUTION STATEMENT C: DISTRIBUTION
AUTHORIZED TO U.S. GOVERNMENT AGENCIES AND THEIR
CONTRACTORS. REASON: EXPORT CONTROLLED. DATE OF
DETERMINATION: 10-10-2014. OTHER REQUESTS FOR THIS
DOCUMENT SHALL BE REFERRED TO THE TACOM LCMC. ARMY
WATERCRAFT PRODUCT OFFICE, ATTN: SFAE-CSS-TS-W, WARREN,
MICHIGAN 48397-5000.
WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.
Blocks 12 and 13: Deliver in accordance with schedule delivered under
CDRL A002.
Block 14: This CDRL shall be delivered into Windchill ACE/ProjectLink
Dan Templin
H. DATE
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TBD A TDP TM X OTHER
D. SYSTEM/ITEM
Army Watercraft Systems STS
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
A014
IPS Management Control Log
DI-CMAN-80529 (T) see blk 16
5. CONTRACT REFERENCE
C.5.6
SFAE-CSS-TS-W / AMSTA-LCC-JL
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
8. APP CODE C 11. AS OF DATE 13. DATE OF SUBSEQUENT
A N/A ASREQ Reg Repro
16. REMARKS
BLOCK 4: Tailoring: remove paragraphs 7.1, 10.1.1, 10.1.2, 10.1.3 on page 1. Remove block 7 and block 10 on page 2 and remove all of page 3.
IPS Management Control Log shall contain the elements found in section
3.3.2 and be in excel spreadsheet format.
Blocks 12 and 13: Deliver in accordance with schedule delivered under
CDRL A002.
Block 14: Submit via email to COR unless otherwise directed in the Task Order.
SEE BLOCK 16
15. TOTAL 2 2 2
Jason DeCoster
H. DATE
07 Aug 2015
I. APPROVED BY
Suzanne Archibald
J. DATE
21 August 2015
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TBD A TDP TM X OTHER
D. SYSTEM/ITEM
Army Watercraft System STS
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
A015
Modification Work Order (MWO)
DI-CMAN-80529 (T) see blk 16
5. CONTRACT REFERENCE
C.4.4
SFAE-CSS-TS-W / AMSTA-LCC-JL
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
8. APP CODE C 11. AS OF DATE 13. DATE OF SUBSEQUENT
A N/A ASREQ Reg Repro
16. REMARKS
BLOCK 4: Tailoring: remove paragraphs 7.1, 10.1.1, 10.1.2, 10.1.3 on page 1. Remove block 7 and block 10 on page 2 and remove all of page 3.
BLOCK 12: DRAFT EQUIPMENT PUBLICATION/PRELIMINARY MWO
(DEP/PMWO). Contractor shall submit DEP/PMWO IAW AR 750-10 no later than 45 calendar days after Government approval of the ECP.
Contractor shall update PMWO with any corrections needed as a result of Government review. The Government will review DEP/PMWO and provide comments within 30 calendar days of receipt of the DEP/PMWO. The contractor shall address and incorporate all Government comments and resubmit for approval 15 calendar days after receipt of the Government’s comments. The PMWOs shall be delivered on electronically.
BLOCK 13: FINAL REPRODUCIBLE COPY (FRC). Contractor shall verify MWO content at “proof” installation. MWOs shall be delivered no later than 30 calendar days after end of “proof” installation. The Government will review MWO and provide comments within 15 calendar days of receipt.
The contractor shall address and incorporate all Governments comments and resubmit for approval 15 calendar days after receipt of the Government’s comments. FRC shall be delivered as hard copy and on DVD Electronic MWO (page-based) format. DVD format shall consist of final MWO and all digital files developed during MWO development (including illustration files, desk-top-publishing files, and any other digital files required in this contract and its attachments).
Block 14: An electronic submission is required. Submit via email to COR unless otherwise directed in the Task Order.
SEE BLOCK 16
15. TOTAL 2 2 2
Jason DeCoster
H. DATE
07 Aug 2016
I. APPROVED BY
Suzanne Archibald
J. DATE
21 August 2016
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TBD A TDP TM OTHER Engineering Data
D. SYSTEM/ITEM
Army Watercraft System STS
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
A016
Trend Analysis /Quality Report
Trend Analysis / Quality Report
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-80508
C.6.3
SFAE-CSS-TS-AWS
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
A N/A SEE BLK 16 Reg Repro
16. REMARKS SEE BLOCK 16
Block 9: DISTRIBUTION STATEMENT C: DISTRIBUTION
AUTHORIZED TO U.S. GOVERNMENT AGENCIES AND THEIR
CONTRACTORS. REASON: EXPORT CONTROLLED. DATE OF
DETERMINATION: 10-10-2014. OTHER REQUESTS FOR THIS
DOCUMENT SHALL BE REFERRED TO THE TACOM LCMC. ARMY
WATERCRAFT PRODUCT OFFICE, ATTN: SFAE-CSS-TS-W, WARREN,
MICHIGAN 48397-5000.
WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25
Blocks 12 and 13: Submit IAW schedule delivered under CDRL A002.
The document may be modified and a subsequent submission required based on the results of the Government Review.
Block 14: Electronic submission is required via e-mail in a *.pdf format.
Submit to COR unless otherwise directed in the Task Order.
15. TOTAL 0 3 0
David Riddle
H. DATE
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TBD A TDP TM OTHER Engineering Data
D. SYSTEM/ITEM
Army Watercraft System STS
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
A017
Test Planning
DI-QCIC-81110
3.5.1, C.6.3
SFAE-CSS-TS-AWS
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
A N/A SEE BLK 16 Reg Repro
16. REMARKS SEE BLOCK 16
Block 9: DISTRIBUTION STATEMENT C: DISTRIBUTION
AUTHORIZED TO U.S. GOVERNMENT AGENCIES AND THEIR
CONTRACTORS. REASON: EXPORT CONTROLLED. DATE OF
DETERMINATION: 10-10-2014. OTHER REQUESTS FOR THIS
DOCUMENT SHALL BE REFERRED TO THE TACOM LCMC. ARMY
WATERCRAFT PRODUCT OFFICE, ATTN: SFAE-CSS-TS-W, WARREN,
MICHIGAN 48397-5000.
WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25
Blocks 12 and 13: Deliver IAW schedule submitted under CDRL A002.
The document may be modified and a subsequent submission required based on the results of the Government Review.
Block 14: Submit via email to COR.
15. TOTAL 0 3 0
David Riddle
H. DATE
DD FORM 1423-1, FEB 2001
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No.
listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
(1 Data Item)
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
16. REMARKS (Continued)
(1 Data Item)
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
16. REMARKS (Continued)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY:
TDP __ TM __ OTHER X
D. SYSTEM/ITEM
Army Watercraft Systems
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
A019
2. TITLE OF DATA ITEM
LORA Report (81872), LORA Input Data (81873)
3. SUBTITLE
Level of Repair Analysis
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-81872A / DI-SESS-81873
5. CONTRACT REFERENCE
C.5.8
6. REQUIRING OFFICE
SFAE-CSS-TS-W / SEE BLK 16
7. DD 250 REQ
LT
9. DIST
STATEMENT
C
10. FREQUENCY
As Required
12. DATE OF 1ST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION N/A Draft
Final Reg Repro
16. REMARKS:
BLK 6: L = Government Logistics Integrated Product / Process Team
BLK 8: Deliverable will be reviewed for technical content and/or format. If deliverable is not approved, the contractor shall make appropriate corrections and resubmit within 15 days.
BLK 14: This information shall be submitted electronically to the COR unless otherwise directed in the Task Order. All submissions shall be prepared and delivered in an editable file format (MS Word, MS Excel, COMPASS database files).
SEE BLK 16
15. TOTAL
G. PREPARED BY
Kevin Ramey
H. DATE
7 July 2016
I. APPROVED BY J. DATE
BLK 12: Initial submission is due 30 days after the award of each Task Order.
BLK 10: Submissions are based on the requirements of each Task Order.
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY:
TDP __ TM __ OTHER X
D. SYSTEM/ITEM
Army Watercraft Systems
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
A020
2. TITLE OF DATA ITEM
Reliability Centered Maintenance (RCM) Procedure Validation Report
3. SUBTITLE
Reliability Centered Maintenance (RCM) Program
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-80987A(T) / SEE BLK 16
5. CONTRACT REFERENCE
C.5.9.2
6. REQUIRING OFFICE
SFAE-CSS-TS-W/ SEE BLK 16
7. DD 250 REQ
LT
9. DIST
STATEMENT
C
10. FREQUENCY
As required
12. DATE OF 1ST SUBMISSION
See BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION N/A Draft
Final Reg Repro
16. REMARKS:
BLK 4: In addition to the content of the DID, The RCM Analysis report shall summarize the information and data gathered in the RCM Analysis.
BLK 6: L = Government Logistics Integrated Product / Process Team
BLK 8: Deliverable will be reviewed for technical content and/or format. If deliverable is not approved, the contractor shall make appropriate corrections and resubmit within 30 days.
BLK 10: Submissions are based on the requirements of each Task Order.
BLK 14: This information shall be submitted electronically to the COR unless otherwise directed in the Task Order. All submissions shall be prepared and delivered in an editable file format (MS Word, MS Excel).
SEE BLK 16
G. PREPARED BY
Kevin Ramey
H. DATE
7 July 2016
I. APPROVED BY J. DATE
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY:
TDP __ TM __ OTHER _X
D. SYSTEM/ITEM
Army Watercraft Systems STS
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
A021
2. TITLE OF DATA ITEM
RECOMMEND SPARES PARTS LIST FOR SPARES
ACQUISITION INTEGRATED WITH PRODUCTION
3. SUBTITLE
SAIP Initial Spares List
4. AUTHORITY (Data Acquisition Document No.)
DI-V-7197 (T) / SEE BLK 16
5. CONTRACT REFERENCE
C.5.10
6. REQUIRING OFFICE
SFAE-CSS-TS-W / SEE BLK 16
7. DD 250 REQ
LT
9. DIST
STATEMENT
C
10. FREQUENCY
As Required
12.