CDRL_A036_NOR.pdf

PDF 75 KB Posted

Attached to
Army Watercraft Systems Technical Support
Solicitation number
W56HZV-16-R-0086
Issued by

About this file

Exhibit A CDRL A036

View the file

Other files

File Type Posted
CDRL_A035_FACAR.pdf PDF
Attachment_0007_-_Applicable_Publications.docx DOCX document
Attachment_0008_-_Performance_Requirement_Summary.docx DOCX document
Attachment_0014_-_Preaward_Survey_of_Prospective_Contractor_Accounting_System_Checklist.pdf PDF
Attachment_0013_-_SBP-Certification-Subcontractor.docx DOCX document
Attachment_0001_-_Configuration_Management.docx DOCX document
Attachment_0010_-Technical_Experience_Matrix.xlsx XLSX spreadsheet
Attachment_0012_-_SBP-WorkbookInstructions.docx DOCX document
Attachment_0002_-_TDP_Requirements.docx DOCX document
Attachment_0011_-_SBP-Workbook.xlsx XLSX spreadsheet
Attachment_0005_-_NDA.doc DOC document
CDRLs_A001-_A033.pdf PDF
Attachment_0003_-_Pricing_Matrix.xlsx XLSX spreadsheet
Attachment_0009_-_Acronym_List.docx DOCX document
CDRL_A034_Test-Inspection_Report.pdf PDF
Attachment_0004_FMECA_Requirements.pdf PDF
Draft_W56HZV-16-R-0086.pdf PDF
Draft_PWS_-_PD_AWS_STS_11_MAY_17_FBO.docx DOCX document
Draft_PWS_-_PD_AWS_STS.docx DOCX document
PD_AWS_STS_PWS_RFI_Draft.docx DOCX document
CDRLS.docx DOCX document
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM/ITEM

STS

E. CONTRACT/PR NO.

TBD

F. CONTRACTOR

TBD

1. DATA ITEM NO.

A036

2. TITLE OF DATA ITEM

Notice of Revision (NOR)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-SESS-80642

5. CONTRACT REFERENCE

C.4.8

6. REQUIRING OFFICE

SFAE-CSS-TS-W

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT REQUIRED

ASREQ SEE BLK 16 b. COPIES

8. APP CODE C (SEE BLK 16) 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft Final

A N/A SEE BLK 16 Reg Repro

16. REMARKS SEE BLK 16

Block 9: DISTRIBUTION STATEMENT C: DISTRIBUTION

AUTHORIZED TO U.S. GOVERNMENT AGENCIES AND THEIR

CONTRACTORS. REASON: EXPORT CONTROLLED. DATE OF

DETERMINATION: 10-10-2014. OTHER REQUESTS FOR THIS

DOCUMENT SHALL BE REFERRED TO THE TACOM LCMC. ARMY

WATERCRAFT PRODUCT OFFICE, ATTN: SFAE-CSS-TS-W, WARREN,

MICHIGAN 48397-5000.

WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.

Blocks 12 and 13: Deliver in accordance with Task Order.

Block 14: NORs shall be submitted electronically to the PD AWS STS SharePoint CDRL Module site. The CDRL Module website will be provided at the Start Of Work Meeting. The contractor shall notify the Government IPT Lead when data has been submitted. A list of IPT leads will be provided to the contractor at the Start of Work meeting.

Forms are available from http://www.dtic.mil/whs/directives/forms/index.htm or https://contracting.tacom.army.mil/engr/engrchange.htm

Repro = electronic copy

15. TOTAL

G. PREPARED BY

Dan Templin

H. DATE

13 April 2017

I. APPROVED BY

J. DATE

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 1

File details come from the government source that posted it. Updated .