16R0051_QA__19_May_2016.docx
DOCX document 18 KB Posted
- Attached to
- Miscellaneous Vehicular Components
- Solicitation number
- W56HZV16R0051
About this file
Q A 19 May 2016
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CDRL_A001-A003.pdf | ||
| 16R0051_Amendment_0003.pdf | ||
| 16R0051_Amendment_0002.pdf | ||
| 16R0051_QA__18_May_2016.pdf | ||
| Attachment_0001_16R0051_Specification.pdf | ||
| Attachment_0002_16R0051_Techincal_Information_Questionaire_(TIQ).docx | DOCX document | |
| Attachment_0003_Price_Evaluation_Sheet.xlsx | XLSX spreadsheet | |
| 16R0051_Amendment_0001_11_May_2016.pdf | ||
| Solicitation_16R0051_April_25_2016.pdf | ||
| Solicitation_16R0051_April_22_2016.pdf | ||
| Attachment_0002_16R0051_Techincal_Information_Questionaire_(TIQ).docx | DOCX document | |
| Exhibit_A_16R0051_CDRL_A001-A003.pdf | ||
| Exhibit_B_16R0051_Spare_Parts_List.xlsx | XLSX spreadsheet | |
| Attachment_0003_16R0051_Price_Evaluation_Sheet.xlsx | XLSX spreadsheet |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
19 May 2016
QUESTIONS AND ANSWERS FOR SOLICITATION W56HZV-16-R-0051
Question 1:
Anti-Terrorism (AT) Level 1 Training: Per Section C, the timing requirement is to perform training within 60 days of contract award and Exhibit A – CDRL_A001 requires training to be complete within 30 days of award. Please confirm which is correct.
Government Answer 1:
Amendment 0003 is issued to correct CDRL 0001. Anti-Terrorism (AT) Level 1 training shall be completed within 60 days of contract award.
Question 2:
Commercial Operator Manuals: Per Section F, the timing requirement for delivery of the Commercial Operator Manuals is required 120 days after contract award. Per Section B and CLIN-0004AA, the timing requirement is 75 days after award. Please confirm which is correct.
Government Answer 2:
Please follow Section B of the contract. Commercial Operator Manuals are required 75 days after award.
Question 3:
Mine Roller Delivery 0001AL – Per Section F, the delivery of 0001AL only has a single release of 20 units. Per Section B, the delivery of 0001AL is split into 2 shipments (001 for 20 units & 002 for 3 units) with shipment dates of 210 days and 240 days respectively. Please confirm which is correct.
Government Answer 3:
Please follow Section B of the contract. CLIN 0002AL requires a total of 23 units split into two shipments; 20ea 210 days after award and 3ea 240 days after award.
Question 4:
A question was submitted asking what the acceptable method(s) for proposal submission is.
Government Answer 4:
Proposals shall be submitted in accordance with Section L.1.3. Electronic proposal submission through Fed Biz Opps or email are unacceptable.
Question 5:
Would a single shipping crate of dimensions 228”L x 91”W x 84”H be acceptable for loading into the ISO shipping container?
Government Answer 5:
Yes, a single shipping crate of dimensions 228”L x 91”W x 84”H A will fit inside a 20' container or can be loaded onto a 20' Flat Rack or Platform.
Question 6:
Can fully assembled interface brackets and mine roller systems be packaged into the same ISO shipping container as a mixed shipment to maximize shipping density? Is there any consideration for nested packing to increase shipping density?
Government Answer 6:
Yes, a fully assembled interface bracket and mine roller system can be packaged into the same ISO shipping container as a mixed shipment to maximize shipping density. Nested packing is acceptable.