3ID_-_Follow_On_Q A.pdf
PDF 81 KB Posted
- Attached to
- 3d ID Museum Fabrication/Install
- Solicitation number
- W56HZV-15-R-A905
About this file
Follow-On Questions
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 3ID_-_Combined_Synopsis_Solicitation.pdf | ||
| 3ID_-_SOW.pdf | ||
| 3ID_-_Design_Package.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION (W56HZV‐15‐R‐A905)
FOLLOW‐ON QUESTIONS AND ANSWERS
1) Is a graphic schedule available?
The graphics schedule is part of the package sent out for bid. This is the document that lists all of the deliverables.
2) What are the graphic specifications?
Graphic specifications are noted in the drawing package.
3) What will the contractor receive in terms of graphic files?
Contractor will receive production ready graphic files.
4) Who is responsible for media production?
Media is being produced by the museum.
5) Is painting building walls part of this scope?
Wall painting is not part of the scope, and will be done by the installation's DPW.
6) As per industry standards, will monthly progress payments be made?
Monthly progress payments will not be made, but the CLINs will be structured in a manner where the contractor will be able to invoice incrementally.
7) Is it possible to provide a graphics schedule?
The graphics schedule is part of the package sent out for bid (separate attachment titled "Design Package"). This is the document that lists all of the deliverables.
8) We assume the AV content either exists already or is being developed under a separate RFP.
Please confirm or clarify.
AV content is being developed by the museum. The contractor will not be responsible for AV Content
9) Which AV elements will have audio, if any?
All of the AV has audio (generated by the hardware).
10) Please provide a list AV hardware list and is are you open to substitution of hardware?
The hardware list is included as part of the solicitation; in the Design Package attachment.
11) Please provide the exhibit space square footage.
1,000 square feet
File details come from the government source that posted it. Updated .