W56HZV-23-R-0050 (System Control Module).pdf

PDF 166 KB Posted

Attached to
Solicitation: System Control Module (NSN: 4240-01-333-3919) - Amended
Solicitation number
W56HZV-23-R-0050
Issued by

About this file

This request for proposal solicits offers for a system control module. The solicitation is a total small business set-aside that will result in a firm fixed price contract for 19 units of the system control module identified by National Stock Number 4240-01-333-3919. There is an associated technical data package restricted to the U.S. Government and its contractors. Military preservation, packing and marking are required according to MIL-STD-2073-1 and special packaging instruction P5-19-9118. Shipments will be free on board destination to an Army supply depot in Texarkana, Texas. Offers are due by 4:30 p.m. local time on June 26, 2023 and must be acknowledged if amended. The Army Contracting Command at Detroit Arsenal issued the RFP, which contains required representations and fill-ins. All questions must be submitted in writing to the identified contract specialist.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER AND AWARD 1. This Contract Is A Rated Order Under

DPAS (15 CFR 700)

Rating Page of Pages

2. Contract Number 3. Solicitation Number 4. Type of Solicitation 5. Date Issued 6. Requisition/Purchase Number Sealed Bid (IFB)

Negotiated (RFP)

7. Issued By Code 8. Address Offer To (If Other Than Item 7)

NOTE: In sealed bid solicitations ‘offer’ and ‘offeror’ mean ‘bid’ and ‘bidder’.

SOLICITATION

9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in item 8, or if handcarried, in the depository located in until (hour) local time (Date).

Caution - Late Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. For Information A. Name B. Telephone (No Collect Calls) C. E-mail Address

Call: Area Code Number Ext.

11. Table Of Contents

(X) Sec. Description Page(s) (X) Sec. Description Page(s)

Part I - The Schedule Part II - Contract Clauses A Solicitation/Contract Form I Contract Clauses

B Supplies or Services and Prices/Costs Part III - List Of Documents, Exhibits, And Other Attach.

C Description/Specs./Work Statement J List of Attachments D Packaging and Marking Part IV - Representations And Instructions E Inspection and Acceptance K Representations, Certifications, and F Deliveries or Performance Other Statements of Offerors G Contract Administration Data L Instrs., Conds., and Notices to Offerors H Special Contract Requirements M Evaluation Factors for Award

OFFER (Must be fully completed by offeror) NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

12. In compliance with the above, the undersigned agrees, if this offer is accepted within _____ calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. Discount For Prompt Payment 10 Calendar Days (%) 20 Calendar Days (%) 30 Calendar Days (%) Calendar Days (%) (See Section I, Clause No. 52.232-8)

14. Acknowledgment of Amendments (The offeror acknowledges Amendment No. Date Amendment No. Date receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):

15A. Name and Code Facility 16. Name and Title of Person Authorized to Sign Offer Address of (Type or Print) Offeror

15B. Telephone Number 15C. Check if Remittance Address is 17. Signature 18. Offer Date Area Code Number Ext. Different From Above – Enter such

Address In Schedule

AWARD (To be completed by Government)

19. Accepted As To Items Numbered 20. Amount 21. Accounting And Appropriation

22. Authority For Using Other Than Full And Open Competition: 23. Submit Invoices To Address Shown In Item

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

24. Administered By (If other than Item 7) Code 25. Payment Will Be Made By Code

26. Name of Contracting Officer (Type or Print) 27. United States Of America 28. Award Date

(Signature of Contracting Officer)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 33 (Rev. 9-97) Previous edition is unusable Prescribed By GSA-FAR (48 CFR) 53.214(c)

W56HZV-23-R-0050

X

2023MAY26

2023JUN2604:30pm

DOA4

2023MAY26 SEE SCHEDULE

W56HZV

ACC-DTA

6501 E. 11 MILE RD.

DETROIT ARSENAL, MI 48397-5000

STANLEY BIERNACKI

(571)588-9024

CCTA-APS-A

STANLEY.R.BIERNACKI.CIV@ARMY.MIL

1 68

X 1

X 5 X 13

X 16 X 18 X 24

X 27

X 29

X 47

X 48

X 61

X 66

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION A - SUPPLEMENTAL INFORMATION

Buyer Name: STANLEY BIERNACKI

Buyer Office Symbol/Telephone Number: CCTA-APS-A/(571)588-9024

Type of Contract 1: Firm Fixed Price

Kind of Contract: Supply Contracts and Priced Orders

Weapon System: Collective Protection Equipment

*** End of Narrative A0000 ***

ADMINISTRATIVE SUMMARY______________________

1. This request for proposal (RFP) is a total small business set-aside and will result in a firm fixed price (FFP) contract for the supply identified below:

REQUIREMENT ___________

NOUN: System Control Module

NSN: 4240-01-333-3919

PART NO.: 5-19-9118

PRODUCTION QUANTITY: 19 EA

OPTION QUANTITY: Up to 100%

UNIT OF ISSUE: Each (EA)

FIRST ARTICLE TEST REPORT: Required

PRODUCTION LOT TESTING: Required

SURVEILLANCE CRITICALITY DESIGNATOR: B

2. There is a technical data package (TDP) associated with this procurement. The TDP is distribution code "C", which limits access to

U.S. Government agencies and its contractors. Please refer to Section C for additional information.

3. Military preservation, packing and marking are required and shall be accomplished in accordance with Section D, all applicable requirements of MIL-STD-2073-1 and special packaging instruction (SPI) P5-19-9118.

4. All shipments shall be free on board (FOB) destination to the following address:

SU WOMC ARMY GENERAL SUPPLY

DLA DISTRIBUTION RED RIVER

HIGHWAY 82 WEST

TEXARKANA, TX 75507-5000

DoDAAC: W562RM

Note: The Procuring Contracting Officer (PCO) has authorized the contractor to ship early when at no additional cost to the Government.

5. Please acknowledge all amendments to this RFP in the space provided under Section A. ______________

6. This RFP contains provisions and clauses that require you, the offeror, to complete fill-ins and/or representations. Please review and complete all such items. Otherwise, your offer may be deemed ineligible for award. __________

7. TO BE CONSIDERED FOR AWARD: Please return one signed copy of your offer, in accordance with Section A, by the date and time indicated in the associated SAM.gov posting. All offers submitted in response to this RFP shall be valid for a minimum of ninety (90) calendar ___________ days following the offer due date.

8. All questions pertaining to this RFP shall be submitted in writing to: __________

STANLEY BIERNACKI

CONTRACT SPECIALIST, ARMY CONTRACTING COMMAND - DETROIT ARSENAL

E-MAIL: STANLEY.R.BIERNACKI.CIV@ARMY.MIL

*** END OF NARRATIVE A0001 ***

A.1. ELECTRONIC CONTRACTING

2 68

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(a) All Army Contracting Command - Detroit Arsenal solicitations will be publicized on the System for Award Management (SAM) website:

https://www.SAM.gov

Any additional attachments, including the Technical Data Package(s) when available electronically, will be separate attachments or links embedded in the solicitation.

(b) Interested offerors shall submit a completed request for proposal (RFP), on the Standard Form 33, via e-mail with the subject line

"RFP Submission - W56HZV-23-R-0050", to the point of contact identified below:

STANLEY BIERNACKI

CONTRACT SPECIALIST, ARMY CONTRACTING COMMAND - DETROIT ARSENAL

E-MAIL: STANLEY.R.BIERNACKI.CIV@ARMY.MIL

Once a proposal is received, the contract specialist will reply to the respective offeror indicating receipt of the submission.

(1) Maximum size of each e-mail shall be 10 megabytes. You may use multiple e-mail messages for each submission. However, you must annotate the subject lines as described above for each message, and number them in this manner: Message 1 of 3, 2 of 3, 3 of 3.

Proposals can be submitted can be submitted using any of the following electronic formats:

(i) Microsoft Office Products; Word, Excel, or PowerPoint. Spreadsheets must be sent in a format that includes all formulate macro and format information. Print image is not acceptable.

(ii) Files in Adobe PDF (Portable Document Format).

(iii) All other electronic formats are not acceptable.

(d) Please pay close attention to the Issued By block location on the cover page of the solicitation for closing date and time. The closing date and time is based on the local time of the listed location of the Issued By office. In accordance with FAR 15.208(a), offerors are responsible for submitting proposals, and any revisions/modifications, so as to be received by the Government office designated in the solicitation by the time specified.

(e) It is the offeror's responsibility to ensure the proposal/quote is received by the date and time specified on the cover page of this solicitation. In accordance with FAR 15.208, if the proposal/quote was not received at the initial point of entry to the

Government infrastructure (in this case, received through SAM) by the exact date and time specified on the cover page of this solicitation, it will be determined late. Proposal/quote is defined to mean ALL volumes or parts required in the solicitation are included in the electronic submission.

Note: There is no "expected" or "target" length of time for proposal submission; size and content may be factors, therefore offerors are strongly cautioned when submitting proposals to allow adequate time for submission.

(f) Solicitations may remain posted on SAM.gov after the solicitation closing date. If the response deadline has passed for the solicitation, vendors will no longer be able to submit electronic responses.

(g) Any award issued as a result of this solicitation will be distributed electronically. In the event of a FOIA request for a copy of any award issued as a result of this solicitation, or any subsequent modifications to the contract, the contract and modifications will be released, including the awarded unit price. This is the notice required by Executive Order 12600 (June 23, 1987) of the Governments intention to release unit prices in response to any request under the Freedom of Information Act (FOIA), 5 USC 552. Unit price is defined as the contract price per unit or item purchased as it appears in Section B of the contract and is NOT referring to nor does it include cost or pricing data/information. If an offeror objects to such release in the base contract or contract modifications, the offeror must notify the contracting officer in writing prior to the closing date identified in this solicitation and include the rationale for the objection consistent with the provisions of FOIA. A release determination will be made based on rationale given.

(h) Questions pertaining to this solicitation shall be directed to the contract specialist identified on the cover page of this solicitation. For technical assistance in doing business with the Government, and doing business electronically, please visit the

Procurement Technical Assistance Center (PTAC) website to locate a regional center at:

http://www.aptac-us.org/

A.2. DISTRIBUTION AND DESTRUCTION OF EXPORT CONTROL TECHNICAL DATA PACKAGE

(a) This solicitation and resulting contract contains technical data whose export is restricted by the Arms Export Control Act (Title

22, U.S.C., Sec 2751, et. seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C, App. 2401 et. seq. Violations

3 68

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.

This also applies to distribution of the TDP to all SUBCONTRACTORS at every level._________________________________________________________________________________

(b) To be eligible to gain access to this export controlled TDP (via SAM.gov) an offeror must have a current DD 2345, Militarily

Critical Technical Data Agreement certification on file with the Defense Logistics Information Service (DLIS). To obtain certification, contractors must submit a DD Form 2345 to the United States (U.S.)/Canada Joint Certification Office (JCO), along with a copy of supporting documentation. DD Form 2345 and instructions can be found on the Joint Certification Program website at:

http://www.dla.mil/HQ/InformationOperations/Offers/Products/LogisticsApplications/JCP.aspx

Processing time is estimated at six (6) to ten (10) weeks after receipt. Upon receipt of certification, an offeror may request the TDP in accordance with the solicitation's Section C, Technical Data Package, instructions.

(c) Upon completion of the purposes for which Government technical data has been provided, the offeror, and all subcontractors, vendors, and sub-vendors of the offeror, are required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed.

(d) Destruction of this technical data shall be accomplished by: Shredding, pulping, burning, or melting any physical copies of the TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.

A.3. ALL OR NONE

Offers in response to this solicitation must be submitted for the total quantity of the items identified in the solicitation.

(1) Only one award will be made as a result of this solicitation.

(2) Offers submitted for less than the total quantities of all the items in this solicitation will be deemed nonresponsive.

A.4. ACKNOWLEDGEMENT OF AMENDMENTS

Acknowledge all solicitation amendments by identifying the amendment number and its issue date below: ___

Amendment Number: Date:

A.5. ARMY CONTRACTING COMMAND - DETROIT ARSENAL OMBUDSPERSON

Information regarding the Ombudsperson for this contract is located at the following website:

https://www.tacom.army.mil/ombudsperson

Note: Website is best viewed using either Google Chrome or Microsoft Edge.

*** END OF NARRATIVE A0002 ***

4 68

PIIN/SIIN

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS

0001 SYSTEM CONTROL MODULE

NSN: 4240-01-333-3919

Mfr CAGE: 81361

Mfr Part Number: 5-19-9118

0001AA PRODUCTION QUANTITY 19 EA $ $ ______________________ ______________ __________________

COMMODITY NAME: SYSTEM CONTROL MODULE

CLIN CONTRACT TYPE:

Firm Fixed Price

PRON: EH1L0207EH PRON AMD: 05

AMS CD: SM2B1100000

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

SEE PACKAGING CLAUSE

UNIT PACK: 001

LEVEL PRESERVATION: Military

LEVEL PACKING: B

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Inspection/acceptance at origin means that the contractor must contact the Defense Contract

Management Agency (DCMA) to arrange for a Government inspection before production under CLIN 0001AA is shipped.

Failure to have production inspected and accepted at origin will result in its rejection at destination.

Rejected production will be returned at the contractor's expense.

(End of narrative E001)

Deliveries or Performance _________________________

DOC SUPPL

REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____

001 W58HZ11258V600 W562RM J 2

DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________

001 19 0330

FOB POINT: Destination

SHIP TO:

(W562RM) SU W0MC ARMY GENERAL SUPPLY

DLA DISTRIBUTION RED RIVER

HIGHWAY 82 WEST

TEXARKANA,TX,75507-5000

5 68

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

Please see FAR 52.211-8: Time of Delivery for a complete explanation of delivery rates. Note, also, that the PCO has authorized the contractor to ship early when at no additional cost to the Government.

(End of narrative F001)

0001AB FIRST ARTICLE TEST REPORT 1 LO $ _________________________ __________________

SERVICE REQUESTED: CDRL A005 - FATR

CLIN CONTRACT TYPE:

Firm Fixed Price

First Article Test Report (FATR), pursuant to the requirements listed in:

SECTION E_________

- E.2.: First Article Test - Contractor Testing

- E.3.: Supplemental Requirements to First Article

Approval - Contractor Testing

SECTION I_________

- FAR 52.209-3: First Article Approval - Contractor

Testing

ADDENDA_______

- Exhibit A: Contract Data Requirements List - DD

Form 1423, A005

NOTE: 1 LOT IS EQUIVALENT TO 1 REPORT.

First Article Testing consists of three separate parts. The offeror shall provide a price below for each of these parts, with the sum of all parts equaling the total price for CLIN 0001AB.

PART 1: P/N 5-19-9118 $_________________

PART 2: All Other Subcomponents $_________________

PART 3: Packaging FAT $____________________________________________________________________

TOTAL PRICE: $_________________

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

GOVERNMENT APPROVAL/DISAPPROVAL DAYS: 30

The Administrative Contracting Officer (ACO) shall accept FATR after the Procuring Contracting Officer

6 68

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

(PCO) approves.

(End of narrative E001)

Deliveries or Performance _________________________

DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________

001 1 0300

Note: The PCO has authorized the contractor to deliver FATR early when at no additional cost to the

Government.

(End of narrative F001)

0002 SYSTEM CONTROL MODULE

NSN: 4240-01-333-3919

Mfr CAGE: 81361

Mfr Part Number: 5-19-9118

0002AA OPTION QUANTITY - UNEXERCISED 19 EA $ $ _____________________________ ______________ __________________

COMMODITY NAME: SYSTEM CONTROL MODULE

CLIN CONTRACT TYPE:

Firm Fixed Price

Option quantity, pursuant to FAR 52.217-7: Option for

Increased Quantity - Separately Priced Line Item.

The quantity stated for CLIN 0002AA does not form a part of the basic contractual quantity. However, all or part of it may be added to the contract at the

Government's discretion, via exercise of the Option clause.

The offeror's failure to insert a unit price for the option quantity shall mean that the offeror will supply all or any part of the option, if exercised by the Government, at the basic contract unit price, and the offer will be evaluated accordingly.

(End of narrative B001)

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

SEE PACKAGING CLAUSE

UNIT PACK: 001

LEVEL PRESERVATION: Military

LEVEL PACKING: B

7 68

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Inspection/acceptance at origin means that the contractor must contact the Defense Contract

Management Agency (DCMA) to arrange for a Government inspection before production under CLIN 0002AA is shipped.

Failure to have production inspected and accepted at origin will result in its rejection at destination.

Rejected production will be returned at the contractor's expense.

(End of narrative E001)

Deliveries or Performance _________________________

DOC SUPPL

REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____

DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________

001 19 0330

FOB POINT: Destination

SHIP TO:

(W562RM) SU W0MC ARMY GENERAL SUPPLY

DLA DISTRIBUTION RED RIVER

HIGHWAY 82 WEST

TEXARKANA,TX,75507-5000

Please see FAR 52.211-8: Time of Delivery for a complete explanation of delivery rates. Note, also, that the PCO has authorized the contractor to ship early when at no additional cost to the Government.

(End of narrative F001)

9000 DATA ITEMS - NOT SEPARATELY PRICED __________________________________

The Exhibit Line Item Numbers (ELINs) below are associated with specific contract requirements.

Please refer to the citations listed within each ELIN for additional information.

(End of narrative A001)

A001 ENGINEERING CHANGE PROPOSAL 1 LO $ ** NSP ** ___________________________ __________________

SERVICE REQUESTED: CDRL A001 - ECP

CLIN CONTRACT TYPE:

8 68

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

Firm Fixed Price

Engineering Change Proposal (ECP), pursuant to the requirements listed in:

SECTION C_________

- C.4.: Configuration Management Documentation

ADDENDA_______

- Exhibit A: Contract Data Requirements List - DD

Form 1423, A001

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Destination ACCEPTANCE: Destination

DLVR SCH PERF COMPL

REL CD QUANTITY DATE ________ ______________ __________

001 1 SEE DD FORM 1423

A002 REQUEST FOR VARIANCE 1 LO $ ** NSP ** ____________________ __________________

SERVICE REQUESTED: CDRL A002 - RFV

CLIN CONTRACT TYPE:

Firm Fixed Price

Request for Variance (RFV), pursuant to the requirements listed in:

SECTION C_________

- C.4.: Configuration Management Documentation

ADDENDA_______

- Exhibit A: Contract Data Requirements List - DD

Form 1423, A002

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Destination ACCEPTANCE: Destination

DLVR SCH PERF COMPL

REL CD QUANTITY DATE ________ ______________ __________

001 1 SEE DD FORM 1423

A003 NOTICE OF REVISION 1 LO $ ** NSP ** __________________ __________________

SERVICE REQUESTED: CDRL A003 - NOR

CLIN CONTRACT TYPE:

Firm Fixed Price

9 68

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

Notice of Revision (NOR), pursuant to the requirements listed in:

SECTION C_________

- C.4.: Configuration Management Documentation

ADDENDA_______

- Exhibit A: Contract Data Requirements List - DD

Form 1423, A003

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Destination ACCEPTANCE: Destination

DLVR SCH PERF COMPL

REL CD QUANTITY DATE ________ ______________ __________

001 1 SEE DD FORM 1423

A004 MEETING MINUTES 1 LO $ ** NSP ** _______________ __________________

SERVICE REQUESTED: CDRL A004 - MEETING MINS

CLIN CONTRACT TYPE:

Firm Fixed Price

Meeting Minutes, pursuant to the requirements listed in:

SECTION C_________

- C.3.: Start of Work Meeting

ADDENDA_______

- Exhibit A: Contract Data Requirements List - DD

Form 1423, A004

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Destination ACCEPTANCE: Destination

DLVR SCH PERF COMPL

REL CD QUANTITY DATE ________ ______________ __________

001 1 SEE DD FORM 1423

A006 PRODUCTION LOT ACCEPTANCE TEST REPORT 1 LO $ ** NSP ** _____________________________________ __________________

SERVICE REQUESTED: CDRL A006 - PLATR

CLIN CONTRACT TYPE:

Firm Fixed Price

10 68

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

Production Lot Acceptance Test Report (PLATR), pursuant to the requirements listed in:

SECTION E_________

- E.6.: Performance Lot Testing (Conformance

Inspection) - Contractor

ADDENDA_______

- Exhibit A: Contract Data Requirements List - DD

Form 1423, A006

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Destination ACCEPTANCE: Destination

DLVR SCH PERF COMPL

REL CD QUANTITY DATE ________ ______________ __________

001 1 SEE DD FORM 1423

A007 CERTIFICATE OF COMPLIANCE 1 LO $ ** NSP ** _________________________ __________________

SERVICE REQUESTED: CDRL A007 - COC

CLIN CONTRACT TYPE:

Firm Fixed Price

Certificate of Compliance (COC), pursuant to the requirements listed in:

SECTION E_________

- E.3.: Supplemental Requirements to First Article

Approval - Contractor Testing

ADDENDA_______

- Exhibit A: Contract Data Requirements List - DD

Form 1423, A007

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Destination ACCEPTANCE: Destination

DLVR SCH PERF COMPL

REL CD QUANTITY DATE ________ ______________ __________

001 1 SEE DD FORM 1423

A008 QUALITY PROGRAM PLAN 1 LO $ ** NSP ** ____________________ __________________

SERVICE REQUESTED: CDRL A008 - QPP

CLIN CONTRACT TYPE:

Firm Fixed Price

11 68

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

Quality Program Plan (QPP), pursuant to the requirements listed in:

SECTION E_________

- E.6.: Production Lot Testing (Conformance

Inspection) - Contractor

ADDENDA_______

- Exhibit A: Contract Data Requirements List - DD

Form 1423, A008

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Destination ACCEPTANCE: Destination

DLVR SCH PERF COMPL

REL CD QUANTITY DATE ________ ______________ __________

001 1 SEE DD FORM 1423

12 68

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

C.1. TECHNICAL DATA PACKAGE INFORMATION

The following "X"d item applies to this solicitation:

[_ _] 1. There is no Technical Data Package (TDP) included with this solicitation.

[_X_] 2. The TDP for this solicitation resides within the System for Award Management (SAM) posting associated with solicitation number: W56HZV-23-R-0050. ________________

To access the data through SAM:

a. Log on to the SAM website: https://www.SAM.gov

b. Search for "W56HZV-23-R-0050"

c. Click on the attachment you would like to view.

d. If the attachment is restricted, request access to the document.

(1) TDPs that have an Export Control Warning Notice are subject to the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et.seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C, App. 2401 et. seq..

(2) Further dissemination must be in accordance with provisions of DoD Directive 5230.25. This also applies to distribution __________________________________ of the TDP to all SUBCONTRACTORS at every level._______________________________________________

(3) To obtain these TDPs, contractors must have a current DD 2345, Militarily Critical Technical Data Agreement on file with

Defense Logistics Information Service (DLIS). To obtain certification, go to:

https://public.logisticsinformationservice.dla.mil/jcp/search.aspx

(4) Upon completion of the purposes for which Government Technical Data has been provided, the Contractor is required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed by the Contractor.

Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.

e. If technical data is otherwise restricted, select Request Explicit Access. This will generate an email to the Contract

Specialist and Procuring Contracting Officer at Army Contract Command - Detroit Arsenal (DTA) with all the information needed to grant contractor access to restricted documents. SAM will automatically generate an email stating when the requesting contractor has ____________________________________________________________________________________ permission to view or download TDP items.________________________________________

f. If multiple individuals in the contractors organization need access to the Technical Data Package (TDP) for a solicitation and an explicit access request is required, each individual MUST submit an explicit access request to be granted approval to view the TDP.

Those same individuals MUST be registered in SAM. Any individuals no longer with the company should be deleted. Questions related to registration in SAM should be directed to:

https://www.SAM.gov

The SAM helpdesk phone number is (866) 606-8220. Vendors are responsible for placing correct information in SAM.

g. It is strongly suggested that contractors submit the explicit access request and provide the buyer with the completed Use and

Non-Disclosure Agreement at the same time if the solicitation requires both to gain access to view the TDP.

C.2. USE OF CLASS I AND CLASS II OZONE DEPLETING SUBSTANCES

(a) Definitions.

(1) Class I and Class II Ozone-Depleting Substances (CIODS) refers to the class of substances identified in Section 602(a) of the

Clean Air Act, (42 U.S.C. 7671a(a)), complete list provided at:

https://www.govinfo.gov/content/pkg/USCODE-2013-title42/html/USCODE-2013-title42-chap85-subchapVI-sec7671a.htm

13 68

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(2) Directly requires the use of CIODS means that the Government's specification or technical data package, at any tier, explicitly requires the use of any Class I Ozone-Depleting Substance (CIODS) in performance of the contract.

(3) Indirectly requires the use of CIODS means that the Government's specification or technical data package, while not explicitly requiring the use of any CIODS, does require a feature that the contractor can meet or produce only by the use of CIODS.

(b) Per Section 326 of Public Law 102-484, the Army cannot award any contract that directly or indirectly requires the use of CIODS without the approval of the Senior Acquisition Official, per current Army Policy the approval authority is the Army Acquisition

Executive. Thus, no CIODS shall be used in meeting the requirements of this contract. If the use of CIODS is required in the performance of this contract, please notify the Contracting Officer immediately in writing.

(c) No Class II Ozone Depleting Substances shall be required in the performance of this contract without government approval. If the use of Class II ODS is required in the performance of this contract, please notify the Contracting Officer immediately in writing.

C.3. START OF WORK MEETING

a. The contractor shall hold a Start of Work meeting via teleconference, unless some other location is designated in the contract, within 30 calendar days after contract award. The Start of Work meeting is to assure a clear and mutual understanding of the contract terms, conditions, line items, technical requirements and sequence of events needed for successful execution of the subject contract effort. The contractor shall participate with the Government to arrange a schedule and agenda for the meeting.

b. The contractor shall at a minimum invite Government contracting personnel (PCO/Contract Specialist). At the discretion of the PCO, other Government technical personnel may be invited to the meeting: Quality Assurance personnel, DCMA, etc. All Government invitees shall be given at least 14 calendar days advance notice of the time, date, and location of the start of work meeting. The preferred method of notification is by email. The Contractor shall provide the Government with Meeting Minutes, in accordance with CDRL A004, within 7 calendar days after the meeting is held.

C.4. CONFIGURATION MANAGEMENT DOCUMENTATION

a. The Configuration Change Management section of SAE EIA-649-1 Configuration Management Requirement for Defense Contracts, Paragraph

3.3, shall be used for configuration control of material with the following exclusions: paragraph 3.3(3); the second sentence of paragraph 3.3.1.8.1(1), and the General Note in paragraph 3.3.2.4(1) which reads as Generally, Minor RFVs address product changes that are temporary and do not impact the baseline.

b. Furnished item(s) shall conform to the approved configuration requirements/revision, unless a Request for Variance (RFV) is processed and approved as provided by Paragraph E. below. The term "Request for Variance" includes Requests for Deviations and Waivers.

c. Value Engineering Change Proposals (VECPs) for cost saving improvements to the Technical Data Package (TDP) should not be processed per SAE EIA-649-1 and should be referred to FAR Part 48 Value Engineering.

d. All Engineering Change Proposals (ECPs) submitted will be deemed routine. If an ECP is considered as an emergency or urgent; that justification for the rationale shall be included in the ECP submittal with all applicable supporting documentation.

e. For ECPs, RFVs, Notices of Revision (NORs) or Specification Change Notices (SCNs), the Contractor must submit the applicable documentation listed in sub-paragraphs e (i) through e (iv) to the Administrative Contracting Officer (ACO), with an information copy to the Procuring Contracting Officer (PCO). Failure to submit a complete legible package may result in return of the ECP/RFV/SCN/NOR without processing.

(i) Documentation or use of DD Form 1692 (current revision) and delivery of data per DI-SESS-80639 is detailed in paragraph 3.3.1 of EIA-649-1 for ECPs.

(ii) Documentation or use of DD Form 1694 (current revision) and delivery of data per DI-SESS-80640 is detailed in paragraph 3.3.2 of EIA-649-1 for RFVs.

(iii) Documentation or use of DD Form 169 (current revision) and delivery of data per DI-SESS-80642 is detailed in paragraph 3.3.4 of EIA-649-1 for NORs.

(iv) Documentation and delivery of data per DI-SESS-80643 is detailed in Paragraph 3.3.3 of EIA-649-1 for SCNs.

f. Questions regarding the status of previously submitted ECP or RFV should be directed to the PCO. Incorporation of an approved RFV and/or ECP will require a contract modification execution.

14 68

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

g. The submission of an ECP/RFV/SCN/NOR does not affect the required delivery date of the contract. If a delivery date change is needed, a contract modification is required.

h. The contractor shall electronically transmit copies of all ECPs, NORs, RFVs and VECPs to:

CCDC CBC Engineering Office

OFFICE: FCDD-CBE-M

EMAIL: usarmy.ria.devcom-cbc.mbx.cmaction@army.mil

FAX: (309) 782-4537

*** END OF NARRATIVE C0001 ***

15 68

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION D - PACKAGING AND MARKING

D.1. PACKAGING REQUIREMENTS / SPECIAL PACKAGING INSTRUCTION

(a) Military preservation, packing, and marking for this contract/order shall be accomplished in accordance with the specific requirements identified below, all the applicable requirements of MIL-STD-2073-1, and the Special Packaging Instruction indicated below.

(1) LEVEL OF PRESERVATION: Military

(2) LEVEL OF PACKING: B

(3) QUANTITY PER UNIT PACKAGE: 001

(4) SPECIAL PACKAGING INSTRUCTION NUMBER: SPI-P5-19-9118

(a) REVISION: C

(b) DATED: 04-Jan-2022

(c) THE REQUIRED SPECIAL PACKAGING INSTRUCTION (SPI) IS AVAILABLE ON THE WEB AT THE FOLLOWING URL: N/A

Note: You must have the Adobe Acrobat reader installed on your PC to view the SPI. See Adobes website (http://get.adobe.com/reader/

) for information on obtaining the latest version of the reader. If you're experiencing problems opening the SPI using Internet

Explorer, try the following: Go to "Tools", then "Internet Options". Click on the "Advanced" tab. Scroll down to the "Security" section.

Uncheck "Do not save encrypted pages to disk". Click "Apply". Click "OK".

(b) Unitization:

(1) Shipments of identical items going to the same destination shall be palletized if they have a total cubic displacement of 50 cubic feet or more unless skids or other forklift handling features are included on the containers. Pallet loads must be stable, and to the greatest extent possible, provide a level top for ease of stacking. A palletized load shall be of a size to allow for placement of two loads high and wide in a conveyance. The weight capacity of the pallet must be adequate for the load. The pallet shall be a 40 x

48 inch, 4-way entry pallet although variations may be permitted as dictated by the characteristics of the items being unitized. The load shall be contained in a manner that will permit safe handling during shipment and storage.

(c) Marking:

In addition to any special markings called out in the SPI:

(1) All unit packages, intermediate packs, exterior shipping containers, and, as applicable, unitized loads shall be marked in accordance with MIL-STD-129). The contractor is responsible for application of special markings as discussed in the Military Standard regardless of whether specified in the contract/order or not. Special markings include, but are not limited to, shelf-life markings, structural markings, and transportation special handling markings. The marking of pilferable and sensitive materiel will not identify the nature of the materiel.

(2) Passive RFID tagging is required in all contracts that contain Defense Federal Acquisition Regulation Supplement (DFARS) clause

252.211-7006. For details and the most recent information, see http://www.acq.osd.mil/log/sci/ait.html for the current DoD

Suppliers Passive RFID Information Guide and Supplier Implementation Plan. If the item has Unique Item Identifier (UII) markings then the concatenated UII needs to be 2D bar coded and applied on the unit package, intermediate and exterior containers, and the palletized unit load.

(d) Heat Treatment & Marking of Wood Packaging Materials (WPM):

(1) All non-manufactured wood used in packaging shall be heat treated to a core temperature of 56 degrees Celsius for a minimum of

30 minutes. The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall be affiliated with an inspection agency accredited by the board of review of the American Lumber Standard Committee. The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure tractability to the original source of heat treatment. Each box/pallet shall be marked to show the conformance to the International Plant Protection Convention Standard. Boxes/pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated. The quality mark shall be placed on both ends of the outer packaging, between the end cleats or end battens; on two sides of the pallet. Foreign manufacturers shall have the heat treatment of non-manufactured wood products verified in accordance with their National Plant Protection Organizations compliance program. In addition, wood used as dunnage for blocking and bracing, to include ISO containers, shall be ordered with ALSC certified marking for dunnage or the markings may be applied locally at two foot intervals.

(e) This SPI has been validated and the method of preservation/packing has proven successful in meeting the needs of the military

16 68

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

distribution system, including indeterminate storage and shipment throughout the world. Special instructions and/or tailoring of the

SPI is detailed in the Supplemental Instructions below. A prototype package is required to validate the sizes and fit requirements of the SPI. Minor dimensional and size changes are acceptable provided contractor provides the PCO and ACO with notification 60 days prior to delivery. Any design changes or changes in the method of preservation that provide a cost savings without degrading the method of preservation or packing or affecting the serviceability of the item will be considered and responded to within 10 days of submission to

PCO and ACO. Government reserves the right to require testing to validate alternate industrial preservation methods, materials, alternate blocking, bracing, cushioning, and packing.

(f) Hazardous Materials (as applicable):

(1) "Hazardous Materials" is defined as a substance, or waste which has been determined by the Secretary of Transportation to be capable of posing an unreasonable risk to health, safety, and property when transported in commerce and which has been so designated.

Note: This includes all items listed as hazardous in Titles 29, 40 and 49 CFR and other applicable modal regulations effective at the time of shipment.

(2) Unless otherwise specified, packaging and marking for hazardous material shall comply with the requirements herein for the mode of transport and the applicable performance packaging contained in the following documents:

- International Air Transport Association (IATA) Dangerous Goods Regulations

- International Maritime Dangerous Goods Code (IMDG)

- Code of Federal Regulations (CFR) Title 29, Title 40 and Title 49

- Joint Service Regulation AFJMAN24-204/TM38-250/NAVSUPPUB 505/MCO P4030.19/DLAM 4145.3 (for military air shipments).

(3) If the shipment originates from outside the continental United States, the shipment shall be prepared in accordance with the

United Nations Recommendations on the Transport of Dangerous Goods in a manner acceptable to the Competent Authority of the nation of origin and in accordance with regulations of all applicable carriers.

(4) When applicable, a Product Safety Data Sheet (SDS) is required to be included with every unit pack and intermediate container and shall be included with the packing list inside the sealed pouch attached to the outside of the package.

(g) Supplemental Instructions:

(1) PLACE A RED "X" AND THE WORDS "SHORT BOX" ON THE FRONT OF ANY BOX THAT HAS A SHORT QUANTITY, THEN PLACE THAT BOX/BOXES WITH THE

MARKINGS SHOWING ON THE TOP FRONT OF THE PALLET LOAD.

*** END OF NARRATIVE D0001 ***

17 68

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION E - INSPECTION AND ACCEPTANCE

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

E-1 52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE AUG/1996

E-2 52.246-16 RESPONSIBILITY FOR SUPPLIES APR/1984

E-3 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT DEC/2014

(a) The contractor shall comply with the higher-level quality standard(s) listed below.

(1) Quality Management System - ISO 9001:2015 Requirements, tailored by excluding paragraph 8.3.

(b) The contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts in--

(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or

(2) When the technical requirements of a subcontract require--

(i) Control of such things as design, work operations, in-process control, testing and inspection; or

(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.

(End of clause)

E.1. REQUIREMENTS FOR PRETREATMENTS AND CHEMICAL AGENT RESISTANT COATINGS LOCAL WARREN - PAINTED MATERIEL

(a) Scope

(1) This clause applies to contracts requiring Chemical Conversion Coatings and Pretreatments for Metallic Substrates, Chemical

Agent Resistant Coating (CARC), and their related materials. The requirements in this clause clarify and supplement those in the contract, unless nullified elsewhere in the contract or through an approved Request for Deviation.

(2) Coating qualification, spot paint repair, and MIL-DTL-16232 Phosphate Coating, Heavy, Manganese or Zinc Base coatings are not within the scope of this clause.

(b) Definitions

(1) The contracting agency, appropriate agency, procuring authority, engineering authority, procuring agency, and procuring activity is the PCO or designee.

(2) The prime contractor is the company awarded this contract, and the subcontractors comprise all companies involved in providing coated parts to the prime contractor, including companies that apply the coatings.

(c) General Requirements Clarifications

(1) The government retains the right for onsite verification of the prime contractors and its subcontractors products, processes, procedures, and test reports.

(2) The prime contractor shall be responsible for itself and its subcontractors to produce and maintain detailed process control plans, process control data, pre-production approval testing, ongoing quality control & quality control testing, and test reports. This information shall be available upon government request.

(3) The prime contractor shall immediately notify the PCO and the Defense Contract Management Agency (DCMA) of any failure to meet preproduction and production requirements.

(4) Each cleaning method shall be treated as a separate step in the process documentation.

(5) The Gage Repeatability and Reproducibility (Gage R&R) error shall be less than 30 percent for all process and product measurement systems.

(6) Products with hexavalent chromium, including but not limited to certain fastener finishes, shall not be used. Additionally, CARC topcoats containing siliceous additives to control gloss are prohibited.

18 68

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(7) CARC primer and CARC topcoat shall not be applied directly to bare metal or plastic, except as provided for in MIL-DTL-53072.

(8) If the contract specifies application of CARC materials over a non-CARC coating, then both CARC primer and CARC topcoat are required. The complete coating system shall meet the requirements for CARC defined in TT-C-490.

(9) Neutral salt spray (NSS) testing shall not be used to validate compliance with materiel life cycle requirements; NSS is a production quality test and does not predict field performance.

(d) Pre-Production Approval Clarifications

(1) Pre-production testing shall include:

(i) Thickness of each layer of the coating system;

(ii) Coating system adhesion;

(iii) Salt spray performance; and

(iv) For phosphate pretreatments, the phosphate coating weight, crystal size and shape, and scanning electron microscope photos of the phosphate coatings at 500x and 1000x magnification.

(2) Pre-production test samples shall be from the material used for production parts, pieces cut from production representative parts, or production representative parts. Standardized test coupons shall not be used.

(3) Nine samples shall be produced for the required testing and shall include: three cleaned and pretreated test samples, three samples with the complete paint system and, depending on the CARC paint system, either three samples with pretreatment plus primer or three samples with metal-rich primer plus primer.

(4) One or more ISO 17025 laboratories shall conduct pre-production testing on the nine test samples in accordance with (IAW) the applicable test method accreditations. The applicable ISO 17025 test method accreditations include ASTM B117 Salt Spray, ASTM B244

Thickness of Non-Conductive Coatings on Non-Magnetic Metals, ASTM B487 Measurement of Metal and Oxide Coating Thickness, ASTM B499

Thickness of Non-Conductive Coatings on Magnetic Metals, and ASTM D3359 Measuring Adhesion by Tape Test.

(5) Unless required elsewhere in the contract and specifications, the CARC coating system applied to hot and cold rolled steel shall meet a minimum of 336 hours neutral salt spray resistance IAW ASTM B117.

(6) Test procedures shall be submitted IAW the Contract Data Requirements List (CDRL) DI-NDTI-80603 documenting Pretreatment and

Chemical Agent Resistant Coating procedures when this CDRL is included in the contract.

(7) Test reports from the ISO 17025 accredited labs shall be submitted for Pretreatment and Chemical Agent Resistant Coating testing specified in paragraph (d)(4) of this clause IAW the Contract Data Requirements List (CDRL) DI-NDTI-80809 when this CDRL is included in the contract.

(e) Production Testing Clarifications

(1) At a minimum, ongoing production quality tests shall conducted and recorded daily for coating adhesion and coating thickness, and monthly for salt spray testing. Use of ISO accredited laboratories is optional for these ongoing tests of production parts.

(2) Production parts or pieces cut from production parts shall be used for ongoing production quality testing. Standardized test coupons shall not be used.

(3) Unless specified elsewhere in the contract and specifications, the CARC coating system applied to hot and cold rolled steel shall meet a minimum of 336 hours neutral salt spray resistance IAW ASTM B117.

E.2. FIRST ARTICLE TEST - CONTRACTOR TESTING

(a) First Article Testing shall consist of the following three parts:

(1) For part 1, the first article test shall consist of four (4) Control Module Systems (PN 5-19-9118) to all testing and inspection requirements listed in paragraph 4.2 of DTL EA-C-1469B and on drawing 5-19-9118.

(2) For part 2, three (3) samples of all other subcomponents shall be inspected and tested for all requirements listed in their

19 68

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

respective drawing, QAP and/or specification unless the technical documents requires more than 3 samples.

(3) For part 3, a packaging FAT is required. The FAT shall consist of 3 packed units and shall be inspected to all the requirements of SPI P5-19-9118.

(b) The contractor is responsible for all testing regardless of who conducts the testing. ___

(c) A First Article Test Report shall be completed by the contractor, in accordance with CDRL A005, documenting the results of all inspections and test (including suppliers and vendors inspection records and certifications, when applicable). The report shall include actual inspection and test results to include measurements, recorded test data, and certifications, if applicable, keyed to each drawing, QAP and specification requirement and identified by each individual drawing/specification/QAP characteristic.

E.3. SUPPLEMENTAL REQUIREMENTS TO FIRST ARTICLE APPROVAL - CONTRACTOR TESTING

(a) In accordance with the requirements under FAR clause 52.209-3, found in Section I of this document, the first article approval item(s) shall be examined and tested as required by the item specification(s), Quality Assurance Provisions (QAPs) and all drawings listed in the Technical Data Package.

(b) The first article shall be representative of items to be manufactured using the same processes and procedures and at the same facility as contract production. All parts and materials, including packaging and packing, shall be obtained from the same source of supply as will be used during regular production. All components, subassemblies, and assemblies in the first article sample shall have been produced by the Contractor (including subcontractors) using the technical data package applicable to this procurement.

(c) The first article shall be inspected and tested by the contractor for all requirements of the drawing(s), the QAPs, and specification(s) referenced thereon, except for:

(1) Inspections and tests contained in material specifications provided that the required inspection and tests have been performed within the last year and the results are submitted with the Certificates of Conformance are submitted with the First Article Test

Report.

(2) Inspections and tests…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .