W564KV22R0003A0001 SF30 Amendment.pdf

PDF 439 KB Posted

Attached to
OCONUS Security Guards Services
Solicitation number
W564KV22R0003
Issued by

About this file

This performance work statement outlines requirements for providing uniformed armed contract security guard services at a communications site in Israel. Key details include:

  • The contractor shall provide all necessary security guard personnel, supervision, equipment, supplies, and transportation to perform duties including static security, access control, patrols and operating security systems.

  • Minimum qualifications for security guards and supervisors include citizenship, age, English proficiency, medical/physical requirements, training, security clearances and reliability screening. The contractor must demonstrate experience providing similar overseas security services.

  • The contractor shall develop plans and standard operating procedures addressing phase-in, training, weapons qualification, operations, emergencies, property management and quality control. Comprehensive individual and site-specific training requirements are specified.

  • Specific deliverables and deadlines are identified for submitting plans, reports, personnel records, certifications and other documentation to the contracting officer's representative. The performance period and option terms are defined in the schedule.

  • The document provides extensive requirement details to ensure the contractor is properly equipped and prepared to assume security responsibilities at this sensitive communications site in accordance with applicable laws and regulations.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

0011732119

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Refer to the Continuation Page for amendment chage details.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 67

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 12-Apr-2022

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W564KV22R0003

X 9B. DATED (SEE ITEM 11)

24-Mar-2022

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

12-Apr-2022

CODE

TCC-KAISERSLAUTERN

KLEBER KASERNE MANNHEIMER STRASSE 238

BLDG 3233

67657 KAISERSLAUTERN

GERMANY

W564KV 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W564KV22R0003

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

A0001 SUMMARY OF CHANGES

The purpose of this amendment is to incorporate the following changes to the solicitation to address questions from contractors:

1. PWS, dated 08 April 2022, paragraph 1.3(c) has been revised to clarify that shift changes described under this paragraph are only authorized by the Contracting Officer after coordination with COR.

2. FAR 52.212‐1 has been revised to‐

a. Exclude the Performance Management Plan (PMP), resume, letter of commitment, and documentation illustrating an active security clearance from page limitations, section (b)4.B.

b. Move section defining “Experience” to (b)5(C)ii(3) and made part of the main Subfactor 3 paragraph.

c. Replace instruction to use DUNS with instruction to use Unique Entity ID (SAM) in paragraph

(b)5(C)iii(3)(a)(i) instead.

3. Attachment 03 ‐ Price Matrix, dated 08 April 2022 has been revised to‐

a. Correct several formulas

b. Change the unit of issue for Option Period 2, Info WSC‐ Phase I Fluctuation (Est) from Each to

Month.

c. Provide additional pricing spaces for Within Scope Changes (WSCs) for Life Support and DBA

Insurance for each of the Option Periods as applicable.

4. Add Attachment 05 – RFP Questions and Answers

///End of changes///

SECTION SF 1449 - CONTINUATION SHEET

The following have been modified:

52.212-1 ADDENDUM

Addendum to FAR 52.212-1, Instructions to Offerors—Commercial Items (NOV 2021)

***OFFEROR SHALL HAVE A SECRET FACILITY CLEARANCE AT THE TIME THE PROPOSALS

ARE DUE***

Paragraph (b) of FAR 52.212-1 is supplemented as follows:

(b) Submission of Offers. The following instructions are provided to offerors to ensure sufficient information necessary for the Government to fully understand and evaluate the proposal. The Government intends to award a single Firm Fixed-Price (FFP) contract for this requirement.

1. General. A representative of the firm authorized to commit the firm to contractual obligations must sign the proposal.

2. Proposal Submission Requirements.

A. A representative of the firm authorized to commit the firm to contractual obligations must sign the offeror’s proposal. Blocks 12 (if applicable), 17a, 30a (signature), 30b, and 30c on page 1 of the SF 1449 must be filled in and signed by such a representative. In doing so, the contractor agrees to the contract terms and conditions as written in the Solicitation with attachments.

B. Submission of proposals shall be sent via email to Mr. Carlos Mayorga, Contract Specialist, carlos.a.mayorga.civ@army.mil AND Mr. Labinot Shabani, Contracting Officer, Labinot.shabani.civ@army.mil. The subject of the email shall be: “W564KV-22-R-0003 – NEGEV Guards Proposal.

C. Offers are due as stated in block 8 of the “OFFER DUE DATE” block on page 1 of this document by the

Local Time (Local Time means Central European Time). Any portion of the proposal that is changed (as a result of negotiations or proposal revisions) should be annotated and dated. Proposals received after the required time on the due date will be handled in accordance with 52.212-1(f).”

D. All offers, questions, and correspondence, shall be submitted in English. The government will not evaluate offers submitted in languages other than English.

E. Contractors shall insert their proposed total price for each CLIN in the SF 1449 Pricing Schedule for all CLINs. Offerors shall submit all pricing in US Dollars only. Proposals submitted in a currency other than US Dollars may not be evaluated.

F. The Government will evaluate the proposal using the information provided with the proposal. Failure of an offeror to submit information sufficient to evaluate the offer, or submitting information that does not follow the guidelines as stipulated herein, may render the proposal ineligible for award.

3. QUESTIONS PERTAINING TO THE REQUEST FOR PROPOSAL (RFP)/ SOLICITATION.

Offerors shall submit all questions to the Contracting Officer AND the Contract Specialist no later than the 10th calendar day after the issuance of this solicitation, 1600 Local Central European Time (CET). The subject of the email shall be: “W564KV-22-R-0003 –Questions.” Questions shall annotate a reference to the specific solicitation element to which they pertain. The Government is not required to provide responses to all questions submitted by Offerors, but will consider them and incorporate changes into the solicitation via amendment, as deemed necessary in the business judgement of the Contracting Officer. Questions received after the cut-off date may not receive a response. Offerors are responsible to watch the System for Award Management website, SAM.gov, for postings of amendments, answers to questions, and other instructions or information, if any.

4. DETAILED PROPOSAL INSTRUCTIONS.

A. All proposals, questions, and correspondence, SHALL BE submitted in the ENGLISH language and in US DOLLARS only. Offers submitted in a language other than English and a currency that is not in U.S.

Dollars will not be evaluated. The use of hyperlinks in proposals is prohibited. Offeror’s proposal information shall be confined to the appropriate volume to facilitate independent evaluation. Proposals that do not follow these guidelines or that do not include the requested minimum information may be eliminated from further consideration for award.

B. Page Limitation: If the page limits are exceeded, the pages in excess of the limit will be removed and not evaluated. The following are excluded from the page limitations: Resume, letter of commitment, documentation illustrating an active security clearance, Property Management Plan (PMP), covers for volumes, tables of contents, glossary of abbreviations and acronyms, indices, title pages, cross reference indexes, and section dividers if they are inserted solely to provide ease to the reader in locating parts/sections of the proposal. Additionally, pages marked “This page intentionally left blank” will not be counted. Page limitations are listed in the table below.

Volume Title Digital Copies

Format Maximum Pages

I General Documents (Solicitation, Offer and Award Documents, and Certifications / Representations)

1 PDF document No page limit

II Technical 1 Electronic MS Excel, Word or PDF

III Past Performance 1 PDF document No page limit

IV Price 1 PDF document No page limit

5. Proposal Format and Content The Government will evaluate the proposal using only the information provided with the proposal. Failure of an offeror to submit detailed information sufficient to evaluate the offer, as stipulated herein, may render your proposal unacceptable and therefore may not be evaluated.

A. PROPOSAL FILES

i. Format. The submission shall be clearly indexed, logically assembled, and clearly identified. A page, for purposes of this request for proposal, is defined as one side of standard 8 1/2" x 11" sheet of paper, font size (12), proportional spacing permissible, 1 inch margin on all sides, single spaced. All pages of each volume shall be appropriately numbered and identified by solicitation number in the header and/or footer, do not include company identifying information. Each paragraph shall be separated by at least one blank line. A Table of Contents shall be created, which outlines the contractor’s proposal submission. Information printed on charts and graphs may be a smaller font; however, the information must be legible. For ease of reference, consecutive page numbering with tabs is requested. Only the price proposal shall contain price information. All other proposal parts shall be void of price information. Any charts or graphs must be clearly legible, regardless of font size. Pages without information (blank pages) do not need to be numbered and shall not be reflected as page count.

ii. File Packaging. WINZIP (.zip) or self-extracting exe files are not acceptable as they are routinely blocked by the domain firewall. Electronic proposals provided via e-mail shall be submitted in the formats specified above.

Maximum size limitation for e-mail receipt for the contracting office is 20 MB (including all attachments).

Proposals that are sent in multiple e-mails shall be numbered to include the total sent, for example “2 of 6.”

Alternatively, an offeror may email the Contract Specialist and Contracting Officer to request a “Drop Off” via Department of Defense (DoD) Secure Access File Exchange (SAFE) https://safe.apps.mil/. Prior to the closing date of the solicitation, a prudent offeror should verify with the Contract Specialist or the Contracting Officer that the Government has received all of the emails and files that comprise the offeror’s electronic proposal.

B. Company Identifying Information. Contractors should limit company identifying information to the cover of the submitted proposal of each section with the exception of SF 1449.

C. Content Requirement. All information shall be confined to the appropriate file. The offeror shall confine submissions to essential matters, sufficient to define the proposal in a concise manner, to permit a complete and accurate evaluation of each proposal. Each file of the proposal shall consist of a Table of Contents, Summary Section, and the Narrative discussion. The Summary Section shall contain a brief abstract of the file. Proprietary information shall be clearly marked. The following shall be included in the Narrative discussion:

i. VOLUME I – General Documents. The volume shall include the following completed documents:

(1) Filled, signed, and dated Standard form 1449, Solicitation/Contract/Order.

(2) Acknowledgement of all RFP/Solicitation amendments

(3) List of persons authorized to negotiate or conduct discussions

(4) A completed copy of the representations and certifications at FAR 52.212-3 or a confirmation of the contractor’s SAM representations and certifications. In addition, contractors shall complete the provisions incorporated within this solicitation.

ii. VOLUME II – Technical Proposal / Technical Approach. In order for the Government to determine a proposal to be acceptable, the following technical information shall be submitted and be organized into the following sections:

(1) Subfactor 1 Facility Clearance. Offerors shall demonstrate they are enrolled in the National Industrial Security Program (NISP) (http://www.dss.mil/about_dss/fact_sheets/nisp_faqsheet.html), by providing their Industrial Cage Code Key and documentation showing their current facility clearance level.

(2) Subfactor 2 Phase-In Plan. The offeror shall provide a Phase-In Plan that aligns with the requirements of the PWS. The offeror shall include in the Phase-In Plan an approach that provides for a seamless transition from the incumbent to the new contractor (hereafter referred to as the offeror).

The Phase-In Plan shall identify the roles and responsibilities of the offeror including proposed schedule(s) and milestones to ensure no disruption of service. The Phase-In Plan shall also identify and discuss the roles and responsibilities of the incumbent contractor and information expected from the incumbent. The offeror shall also identify any actions contemplated on the part of the Government.

The phase-in plan shall detail the milestones and address how the offeror will achieve the proposed milestones within the Phase-In period for each of the following categories: mobilizing personnel, equipment and supplies, life support/housing, and Host Nation (HN) Implementing Agreement.

(3) Section 3 – Subfactor 3 Management and Staffing Plan. Offerors shall describe the events demonstrating how they will hire and retain all required personnel, perform all the requirements of the PWS, and demonstrate experience performing similar services at OCONUS locations that required secret or higher clearance. The Management and Staffing Plan shall also address, in detail, its personnel screening processes.

Experience: is defined as having previously supported the Department of Defense (DoD) or other U.S. Government Agency requirements for same or similar services performed at OCONUS locations, within the last five (5) years from the issuance date of the solicitation, and at a value of at least $1,000,000.00 annually. Same or similar means provision and supervision of uniformed armed CSG services to include the necessary supplies, equipment, vehicles, and transportation, performed OCONUS and requiring secret clearance, at military installations; public facilities such as airports, railroads; or any other sensitive locations such as banks which involve at a minimum one (1) contract with forty (40) armed guards (total staffing).

For personnel screening, offerors shall address the requirements below.

(a) Project Manager and Alternate Project Manager:

- Provide the resume and letter of commitment for the Project Manager and Alternate Project Manager

- Provide, in narrative format, a description of how the Project Manager and Alternate Project

- Manager meet the requirements as provided at PWS 1.6.1.1.

- Provide documentation illustrating an active security clearance in accordance with PWS 4.2

(b) Individual Reliability Program (IRP):

(i) Drug Testing. All contract security guard personnel employed under this contract must undergo drug testing IAW AR 190-56, and paragraph 1.6.37 of the PWS. Offeror shall provide details on how they anticipate administering the urinalysis testing required for employment under this contract. Additionally, offerors shall provide detailed information as to how screening will be accomplished for all employees prior to full performance.

(ii) Medical Screening. All contractor personnel under this contract shall be physically and mentally able to perform the assigned duties IAW AR 190-56, paragraphs 3-10, and paragraph 1.6.36 of the PWS. Offeror shall describe in detail how medical screening will be accomplished prior to full performance as required for employment under this contract (i.e., contract deployment facility with contracted physician. If applicable, provide physician (names) and location of facility, and provide contracted physician (or in house) name that will conduct annual physicals after contract award).

(iii) Security Clearance/Background Checks. All contractor personnel under this contract shall submit information required to perform a background check IAW with the requirements of paragraphs 1.6.38 of the PWS. Offeror shall provide details on how checks will be performed on its employees and reported to the Government prior to full performance of contract services.

(iv) Individual Training: Offerors shall provide a Training Plan that describes in detail how training will be accomplished prior to full performance IAW PWS paragraph 1.6.20 through 1.6.25. Plan must include the following:

- 1.6.20.3 Physical Agility Testing (PAT).

- 1.6.20.4 Weapons Qualification/Training.

- 1.6.20.5 Access Control.

- 1.6.20.6 Chemical Protective Ensemble.

- 1.6.20.7 First Aid.

- 1.6.21 Site Specific Training

- 1.6.22 Contractor Training

- 1.6.23 Use of Force/Rules of Engagement

- 1.6.24 Antiterrorism/Force Protection Training (AT/FP) and Operational Security (OPSEC) Awareness.

- 1.6.25 Army Training Certification Tracking System (ATCTS)

(c) Government Property Management: This is a competitive acquisition in which the contractor is responsible for all costs related to making Government Property available for use from other Government contracts, this includes payment of all transportation, installation or rehabilitation costs.

(i) The offeror shall submit with their offers a summary level Property Management Plan (PMP) containing voluntary consensus standards and industry leading practices (if applicable) and standards to be used in the management of Government Property or existing property management plans, methods, practices, or procedures for accounting for property. The PMP shall include a strategic level summary of each of the following (if applicable):

- Description of the contractor’s Property Management System (PMS)

- Purpose of the contractor’s PMS

- Applicable laws, regulations, and/or instructions for PMS compliance

- How the contractor will manage different property types (i.e. Government Property, Contractor Owned Property, Subcontractor Owned Property, etc.)

- How the ten (10) outcomes of Government Property will be addressed in the contractor’s PMS.

1. Acquisition of Property

2. Receipt of Government Property / Identification

3. Records

4. Physical Inventory

5. Subcontractor Control

6. Reports

7. Relief of Stewardship Responsibility and liability

8. Utilization (Utilize / Movement / Storage / Consumption)

9. Maintenance

10. Contract Close-Out Property Close Out)

- Applicable standards (e.g. voluntary consensus standards, industry leading practices) used in the contractor’s PMS

- Plan to meet special solicitation requirements (e.g. Item Unique Identifying Device (IUID), reporting)

(ii) This solicitation and will include Government Property related evaluation procedures to be followed which may include rental charges or equivalents and other cost or savings to be evaluated. The offeror shall submit the following information with their offers:

- A list or description of all Government Property that the offeror or its subcontractors propose to use on a rent-free basis. This list shall identify the accountable contract under which the property is held and the authorization for its use (from the Contracting Officer having cognizance of the property) (written advance notifications shall accompany this submittal);

- The dates during which the property will be available for use (including the first, last, and all intervening months) and, for any property that will be used concurrently in performing two or more contracts, the amounts of the respective uses in sufficient detail to support prorating the rent;

- The amount of rent that would otherwise be charged in accordance with FAR 52.245-9 Uses and Charges (written rental equivalent appraisals shall accompany this submittal within Volume IV, Price).

iii VOLUME III – Past Performance.

(1) This volume shall contain a list of applicable contract references to be recent and relevant. Recent past performance is defined as work performed within the last five (5) years from the issuance date of the solicitation.

Relevant past performance is defined as present/past performance which involved the same or similar scope and magnitude of effort and complexities this solicitation requires. Same or similar means provision and supervision of uniformed armed CSG services to include the necessary supplies, equipment, vehicles, and transportation, performed OCONUS at military installations; public facilities such as airports, railroads; or any other sensitive locations such as banks which involve at a minimum one (1) contract with forty (40) armed guards (total staffing).

The Government reserves the right to determine relevancy of submitted past performance.

(2) The Government will not evaluate and will not give the offeror credit for the past performance of proposed personnel or proposed subcontractors. The Government will use information submitted by the offeror and other sources such as other Federal Government Offices and commercial sources as necessary, to assess performance.

(3) This part shall be organized in the following sections:

(a) Section 1 – Contract Descriptions. The offeror shall include the following information for each contract reference submitted in the following format:

(i) Contractor/offeror’s CAGE Code and Unique Entity ID Number (SAM). If the work was performed as a subcontractor, also provide the name of the prime contractor and Point of Contact (POC) within the prime contractor organization (name, and current address, e-mail address, telephone and fax numbers).

(ii) Government/commercial contracting activity, current address, POC name, e-mail address and telephone number.

(iii) Contract number and, in the case of Indefinite Delivery type contracts, GSA contracts, and Blanket Purchase Agreements, include Task and Delivery Order Numbers.

(iv) Contract Type (specific type such as Fixed Price (FP), Cost Reimbursement (CR), Time & Materials (T&M), etc…) In the case of Indefinite Delivery contracts, indicate specific type (Requirements, Definite Quantity, and Indefinite Quantity) and secondary contract type (FP, CR, T&M, etc).

(v) Awarded price/cost.

(vi) Period of Performance and Place of Performance.

(b) Section 2 – Performance. Offerors shall provide a brief but thorough narrative explanation of each contract description detailing how the effort is relevant to the requirements of this solicitation.

iv VOLUME IV – Price.

The offeror shall provide all proposed prices using Attachment 03, Price Matrix for the base, all option years, and GFP related charges. Attachment 03 will be used to calculate the total evaluated price. The price proposal will be evaluated for completeness, reasonableness, and balance. The burden of proof for the credibility of all proposed prices rests with the Offeror. All prices shall be in U.S. DOLLARS.

All FFP CLINs shall include all personnel, management, equipment, transportation, and other suppliers/services necessary to perform the requirements of the PWS. The FFP CLINs shall include any materials and equipment not provided by the Government necessary to perform the requirements of the PWS.

The TEP also requests pricing for within scope changes (WSCs), dependent on a separate construction project requirement at site 512, which may occur during the period of performance of the contract. The construction project is supposed to occur in two phases and the future service level may fluctuate affecting the number of Entry Controllers (ECs). The pricing requested for the WSCs is to be used as basis for the actual pricing to be submitted during post award and negotiated bilaterally. Pricing should reflect the total personnel required by the WSCs, per RFP Attachment 04, Estimated Fluctuation Timeline.

Paragraph (c) is replaced as follows:

Period for Acceptance of Proposals/Offers. The suppliers/offeror agrees to hold the prices in its proposal firm for 180 calendar days from the date specified for receipt of proposals/offers.

Paragraph (f) is supplemented as follows:

Late submissions, modifications, revisions, and withdrawals of offers: Offerors are responsible for submitting offers, and any modifications, revisions, or withdrawals, so as to reach the Government office designated in the solicitation by the time specified in the solicitation in accordance with FAR 15.208, Submission, Modification, Revision, and Withdrawal of Proposals. The time specified in the solicitation for receipt of offers is local time, Kaiserslautern, Germany (Central European Time).

Paragraph (h) is replaced as follows:

Multiple Awards. Only one award will be made and multiple awards will not be considered.

(End of provision addendum)

ATTACHMENTS:

Attachment 01 – DD254 DoD Contract Security Classification Specification Attachment 02 – Government Furnished Property List Attachment 03 – RFP Price Matrix Attachment 04 – Estimated Fluctuation Timeline Attachment 05 – RFP Questions and Answers

PERFORMANCE WORK STATEMENT

PERFORMANCE WORK STATEMENT (PWS)

Contract Security Guard (CSG) Services at the Communications Site in Israel

08 April 2022

Part 1 General Information

1. Introduction: This is a non-personal services contract to provide uniformed armed contract security guard (CSG) services. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.

1.1 Background: Security System Level A (SSL-A) Resources. SSL-A security must result in the greatest practical deterrence against, and effective response to, hostile acts. In-place security measures must provide an effective means to achieve detection, interception, and defeat of a hostile force before it is able to seize, damage, or destroy resources. The contractor occupies all security positions at the site. In addition, the contractor operates the Integrated Electronic Security System (IESS) and shall monitor alarms. Operator-level training will be provided by the U.S. Government (Site Commander) as necessary, approximately two (2) days duration. The contractor interfaces daily with the military and civilian DoD contractor personnel who occupy the site. The dimensions of the site, locations of equipment, numbers and locations of security system components are subject to change.

1.2 Responsibilities: The Contractor shall assume total responsibility for all requirements stated herein on the commencement date of the performance period. The Contractor shall perform as specified in this Contract and under the direction of the Contracting Officer (KO).

1.2.1 Work Responsibility: The Contractor shall perform all work and assume responsibility for planning, programming, administering, managing, and executing all functions necessary to provide the services specified in this PWS. The Contractor shall conduct work in accordance with this PWS and all applicable United States (U.S.), German, and Israeli laws, regulations, standards, provisions, and directives to include applicable publications in Section C-6. The Contractor shall ensure that all work meets the level of service, performance standards, or tolerances specified in the PWS or in applicable referenced documents. Some services under this Contract may be performed at designated facilities, or portions of installations, by in-house Government personnel or by other contractors.

1.2.2 Administrative Responsibility: The Contractor shall perform all related administrative actions required to provide services or perform work such as material requisitioning, quality control (QC), financial control, meetings, and correspondence. The Contractor shall also maintain accurate and complete records, files, and libraries of documents to include all U.S. and local regulations, standards, provisions, codes, laws, technical manuals, and manufacturers’ instructions and recommendations that are necessary and related to the functions being performed. The Contractor shall compile historical data, prepare required reports, and submit information as specified by the Deliverable List presented in this PWS.

1.3 Objectives: This contractor requirement is for the provision and supervision of uniformed armed contract security guard (CSG) services within the designated location of the Communications Site within Israel. The contractor shall provide physically fit, properly trained, and highly qualified CSG personnel in accordance with (IAW) PWS, and all supplies, equipment, vehicles, and transportation necessary to perform services specified this Performance Work Statement (PWS).

a. A Pre-Performance Conference (PPC) will be held approximately seven (7) days after contract award.

b. Contract Security Guard (CSG) services. The contractor shall provide the necessary physical security measures required to secure equipment and personnel at the site IAW the PWS. On-site security forces constitute an effective means to detect, deter, and delay an adversarial force before it is able to seize, damage, or destroy resources.

c. CSG personnel employed under this contract shall provide static installation access control, static perimeter security, roving security patrols, operate the Integrated Electronic Security System (IESS) or perform any other security related functions associated with the protection of the Communications Site, existing materials, property, and personnel. Security guards may not work longer than 8 hours within a 24 hour period of time and only the Contracting Officer, after coordinating the change with the COR, can approve a change on a temporary basis to this requirement so as to meet changes or temporary increases in operational requirements, short term recruitment issues, or other emergency situations. The normal 8 hour duty period shall be automatically extended (without need for prior approval) when replacement personnel fail to report for duty since the on duty guard must remain on post until a replacement is identified and reports for duty. Additionally, guards shall not work more than 192 hours within a 30 day period. These 192 hours also include any quarterly or annual training conducted during said 30 day period. This equals 24 duty days per month and provides a minimum of 6 days off for rest, recovery, and quality of life issues.

d. The contractor is responsible for providing necessary logistical support for living off Site/Post. This may include things such as billeting, postal, subsistence, laundry, recreational facilities, transportation, miscellaneous equipment and supplies and routine first aid. The contractor shall only use lodging approved by the Site Security Manager.

e. Based on planned or unforeseen operational requirements, the U.S. Government reserves the right to change the function, location, and operating hours of CSG positions to meet both permanent, immediate, and temporary (on short-notice) changes in security operational requirements.

f. Upon completion of the mobilization period, the contractor shall be capable of assuming full security operations on site. This means that all required personnel, supervisors, guards, and security support personnel shall be hired, on site, trained, and equipped to assume the security mission at Communications Site at the end of the mobilization period.

g. Medical Support. The contractor shall provide routine first aid care Medical requirements that go beyond the level of basic first aid such as resuscitative care, stabilization, hospitalization at Israel medical treatment facilities, and assistance with patient movement in emergencies where loss of life, limb, or eyesight could shall be coordinated with the Site Commander (SC).

The contractor is responsible for reimbursing any costs associated with such medical treatment or transportation. Emergency evacuation by ground or air shall be provided by Israel military or civilian agencies.

h. The contractor will maintain and account for GFP medical equipment to include Individual First Aid Kits (IFAKs) for each CSG on duty. The Government will provide replacement expendable class VIII resupply to maintain CSG IFAKs.

i. The SC in coordination with (ICW) Israel defense forces and the U.S. Embassy shall provide protection to contractor personnel as appropriate in the event of civil unrest or natural disaster(s) to implement non- combatant evacuation operations to extract contractor personnel.

j. The contractor is required to possess and maintain a Secret Facility Clearance throughout the duration of the contract. Contractor employees are required to maintain, at a minimum, an Interim Secret Security Clearance throughout performance on this contract.

1.4 Functional Areas: Due to existing security classifications and mission sensitivity, the precise location shall remain unspecified for this PWS. The location shall be referred to as Communications Site, Israel.

1.5 Period of Performance: See Schedule

1.6 Management and Administration: The contractor shall provide overall contract management and performance oversight of this contract directly from the site location. Bi-weekly Activity Reports (Deliverable Item A.003) shall be submitted to the COR during the first six (6) months of the contract and the frequency shall be reviewed thereafter. The format for these reports shall be developed by the contractor and submitted to the COR for review and approval within 30 days of contract award and should address at a minimum: Work accomplishment summaries, planned activities (i.e. recurring training, certification, weapon qualification), and staffing availability and changes (current staffing list. includes: name, current clearance status, leave, projected leave, etc.). The contractor shall ensure all employees comply with and abide by all regulations, directives, manuals, and circulars indicated at Appendix B – Publications of the PWS. At no time shall a guard post be left unattended unless directed by authorized COR/Site Commander. The contractor shall ensure each employee is thoroughly familiar with General and Special Guard Orders or instructions before being assigned to the guard post. The contractor shall comply with all provisions of the U.S./Israel Implementing Agreement (IA) in Appendix D.

1.6.1 Key Personnel

1.6.1.1 Project Manager/Site Manager (PM/SM)

The PM/SM is responsible for the overall contract mobilization, management, supervision, training, and coordination of all contract requirements and is the primary point of contact for the U.S. Government. The PM/SM shall possess prior experience of at least 3 years of military and or civilian security guard operations, management and training. The PM/SM shall be available 24 hours a day via cellular phone, and shall be at the site within ninety (90) minutes of recall during normal Contract workdays and work hours. The PM/SM shall augment the Response Force (RF) in the PWS as required.

1.6.1.2 Shift Supervisor

Shift Supervisors implement applicable regulations and SS-SOP, and carry out operations and procedures necessary to meet the requirements of the guard contract. Shift Supervisors shall possess prior experience of at least 3 years of military and or civilian security guard supervisory duties, operations, management and training. Shift Supervisors immediately report violations of security procedures to the COR. Shift supervisors shall have access to a vehicle and radio communications. This is a 24/7 position. The Shift Supervisor, when on duty, shall remain on site during his/her entire shift. The Shift Supervisor shall issue and receive weapons and ammunition. Shift Supervisor shall augment the Response Force (RF) in PWS paragraph as required.

1.6.2 Available Facilities: In addition to office and operation facilities, the contractor has access to the following shared facilities: male/female latrine buildings with showers, classroom space, U.S. Army Post Office (APO), a break room, and a supply/storage room for contractor equipment.

1.6.3 Use of Force: CSGs shall be trained in both lethal and non-lethal Use of Force measures IAW this PWS. Contractor developed Use of Force/ Standing Rules for the Use of Force (SRUF) instructions shall be included in each Guard Post Order.

1.6.4 Post Award Personnel Fluctuations

1.6.4.1 Surge Capability: In conjunction with (ICW) Force Protection Condition (FPCON) Requirements; the contractor shall be able to adjust work schedules for increased personnel of up to four (4) Interior Response Guards (Roving Guards), not to exceed 10 days per each CLIN's period of performance, 8 hours per day. This surge is part of the awarded Armed Security Guards services.

1.6.4.2 Within Scope Changes (WSC’s): Dependent on a separate construction project requirement at site 512, that is supposed to be in two phases, the future service level may fluctuate affecting the number of Entry Controllers (EC’s). Each construction phase will require a different number of guards. These changes will require bilateral agreement(s).

1.6.4.2.1 Phase I: Estimated increased personnel of four (4) EC's per shift, three (3) shifts per day. This will increase the number of EC’s from two (2) to six (6) per shift, per day for an estimated duration of 18 months.

1.6.4.2.2 Phase II: Decreased personnel of two (2) EC's per shift, three (3) shifts per day, from Phase I. This will decrease the number of EC’s from six (6) to four (4) per shift, per day. This personnel level will remain for the rest of the period of performance.

1.6.5 Phase In /Phase Out Period: See Contract Line Item Number (CLIN) Schedule.

1.6.6 Contractor Management: The Contractor shall perform continual management of the functional areas contained in this PWS and shall provide a Project Manager physically present on-site during normal duty hours. The Project Manager shall conduct overall management coordination and shall be the central point of contact (POC) with the Government for performance of all work under the PWS. At the Post Award conference, the Contractor shall submit to the COR, in writing, the name, title, office, home and mobile telephone number of the Project Manager (Deliverable A.006). A Contractor employee shall be designated to act as a Site Manager for the Project Manager when work is being performed outside of duty hours, or during the Project Manager’s absence (Deliverable A.006). Both the Project Manager and the Contractor employee/Site Manager filling in for the Project Manager, shall have full authority to act for the contractor on all Contract matters relating to daily operation of this Contract. In the event of any change to Project Manager or Site Manager, the Contractor must designate a replacement, in writing, NLT seven (7) days prior to the change.

1.6.7 Contractor Responsiveness: The Project Manager or designated alternate shall be available for telephone communication or site attendance, with the COR, as required by the COR, 24 hours a day, 7 days a week. A personal answering service is permitted at other than normal Contract workdays and work hours for receipt of COR emergency response work requirements, provided that the Project Manager or designee responds to all calls within a time not to exceed two hours after notification of the call by the answering machine and/or service. The Project Manager and any individuals designated to act in that capacity shall have full authority to contractually bind the Contractor for prompt action on matters pertaining to execution of the

PWS.

1.6.8 Meetings, Conferences, and Briefings: The Contractor shall attend, participate in, and furnish input to scheduled and unscheduled meetings, conferences, and briefings that relate to the functions and services herein as required by the Government to provide effective communication and impart necessary information. The Project Manager or designated representative shall attend meetings as requested by the Government. Meeting attendees shall at times include Contractor managerial, supervisory, and other personnel knowledgeable of the subject matter. Meetings may start or end outside of regular duty hours.

1.6.9 Hours of Operation: The contractor is responsible for conducting business, 24 hours a day, 7 days a week, 365 days a year. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.

1.6.10 Recognized Holidays: N/A

1.6.11 Training Holidays: N/A

1.6.12 Quality Control: The contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s quality control program is the means by which the contractor assures itself that its work complies with the requirement of the contract. Within 30 days after contract award, a copy of the contractor’s Quality Control Plan (Deliverable Item A.027) shall be submitted to the Contracting Officer Representative and within five (5) working days when changes are made thereafter. After acceptance of the Quality Control Plan the contractor shall receive the contracting officer’s acceptance in writing of any proposed change to his QC system.

1.6.13 Quality Assurance: The government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).

1.6.14 Place of Performance: The work to be performed under this contract will be performed at the Communications Site in Israel.

1.6.15 Type of Contract: See Schedule

1.6.16 Security Program: Contractor personnel performing work under this contract must have an Interim Secret Security Clearance prior to performance of guard services, and must maintain the level of security required for the life of the contract. The security requirements are in accordance with the attached DD254. The unit security monitor is responsible for initiating this form.

1.6.17 Physical Security: The contractor shall be responsible for safeguarding all government equipment, information and property provided for contractor use. At the close of each work period, government facilities, equipment, and materials shall be secured.

1.6.18 Key Control: The Contractor shall establish and implement methods of making sure all keys/key cards issued to the Contractor by the Government are not lost or misplaced and are not used by unauthorized persons. NOTE: All references to keys include key cards. No keys issued to the Contractor by the Government shall be duplicated. The Contractor shall develop procedures covering key control that shall be included in the Quality Control Plan (Deliverable A.027). Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas. The Contractor shall immediately report any occurrences of lost or duplicate keys/key cards to the Contracting Officer. In the event keys, other than master keys, are lost or duplicated, the Contractor shall, upon direction of the Contracting Officer, re-key or replace the affected lock or locks; however, the Government, at its option, may replace the affected lock or locks or perform re- keying. When the replacement of locks or re-keying is performed by the Government, the total cost of re-keying or the replacement of the lock or locks shall be deducted from the monthly payment due the Contractor. In the event a master key is lost or duplicated, all locks and keys for that system shall be replaced by the Government and the total cost deducted from the monthly payment due the Contractor. The Contractor shall prohibit the use of Government issued keys/key cards by any persons other than the Contractor’s employees. The Contractor shall prohibit the opening of locked areas by Contractor employees to permit entrance of persons other than Contractor employees engaged in the performance of assigned work in those areas, or personnel authorized entrance by the Contracting Officer. The Contractor shall establish and implement methods of ensuring that all lock combinations are not revealed to unauthorized persons. The Contractor shall ensure that lock combinations are changed when personnel having access to the combinations no longer have a need to know such combinations. These procedures shall be included in the Contractor’s Quality Control Plan. In addition, the contractor shall develop and implement a Key Control Plan as required by AR 190-11 and Appendix D of AR 190-51, Security of Unclassified Army Property (Sensitive and Non-sensitive), for accountability and security of all sensitive keys and locks in use under provisions of the PWS. The contractor shall submit the Key Control Plan to the COR NLT 30 days after contract award, and five (5) days after any changes have been made (Deliverable Item A.014). Under no circumstances shall keys be duplicated by the contractor. Master Key systems are prohibited. Any lost, stolen, and damaged keys shall be reported to the COR as soon as possible.

1.6.19 Specific Site Provisions

1.6.19.1 Site Commander’s (SC) Authority and Jurisdiction DoD Directive 5200.8, 25 Apr 91, Security of DOD Installations and Resources, and Section 797 of Title 50, United States Code, Section 21 of the Internal Security Act of 1950, requires DOD Site Commanders to take reasonably necessary and lawful measures to maintain law and order and to protect installation personnel and property. Based on this authority, the Site Commander (SC) has the authority to direct security activities at Communications Site.

1.6.19.1 CSG authority to perform duties under this contract (e.g., search, detain, protect human/property assets, use appropriate levels of force) exists and is limited to that specifically authorized by the SC. CSG authority, jurisdiction, and/or use of force shall be prescribed in writing by the SC to be integrated into the Contract Guard General Orders and Special Orders.

The SC ICW the COR has operational control, within the scope of this contract, for all CSG.

The PM/SM consistent with AR 190-14, AR 190-56, CJCSI 3121.01B SRUF/Use of Force, and Israel laws shall develop written SRUF/Use of Force for CSGs. During the two (2) months contractor mobilization period, the SC shall provide (NLT 14 days after mobilization period start) the contractor with Israel Rules of Engagement/SRUF to facilitate the PM/SM development of CSG SRUF/Use of Force at Communications Site. PM/SM shall provide the contractor SRUF/Use of Force (Deliverable Item A.010) to the COR fourteen (14) days prior to full performance. The SC has command and control authority, as exercised through the COR and the contractor PM/SM, regarding the operational employment of the guard force.

1.6.19.2 Contractor employees’, as authorized by the SC, are authorized to bear and use firearms to perform duties at Communications Site, IAW the PWS. While CSGs shall not be delegated authority to perform law enforcement functions, there is necessarily a very limited overlap in the activities performed by the CSG and law enforcement personnel (which is the authority to detain and the use of deadly force). CSGs may only detain subjects until the arrival of Israel Authorities.

1.6.20 Special Qualifications

1.6.20.1 Standards of Conduct: Contractor employees performing security guard duties shall meet the standards described in the Individual Reliability Program (IRP) AR 190-56. In addition to any other U.S. Government right or remedy under this contract, the U.S. Government reserves the right to remove, at the contractor’s expense, a contractor employee from performing duties under this contract. Contractor shall submit rebuttals for employee removals to the COR. The following circumstances shall be used as justification for removal and/or criminal prosecution:

a. Deliberate falsification, misrepresentation, or omission of significant facts or information on the employment application or any other employment documents produced or signed by the individual.

b. Falsification, unlawful concealment, willful omission, removal, mutilation, or destruction of any official U.S. Government or contractor documents or records.

c. Mental illness of a nature that, in…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .