Amendment 0001 to Solicitation # W560MY-17-R-0005 dated 6 March 2018

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of

2. Amendment/Modification No.

3. Effective Date

4. Requisition/Purchase Req No.

5. Project No. (If applicable)

6. Issued By Code 7. Administered By (If other than Item 6) Code

8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code)

9A. Amendment Of Solicitation No.

9B. Dated (See Item 11)

10A. Modification Of Contract/Order No.

10B. Dated (See Item 13) Code Facility Code

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. Accounting And Appropriation Data (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS

It Modifies The Contract/Order No. As Described In Item 14.

A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In

The Contract/Order No. In Item 10A.

B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set

Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).

C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:

D. Other (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.

14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. Name And Title Of Signer (Type or print)

16A. Name And Title Of Contracting Officer (Type or print)

15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed

By (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITIONS UNUSABLE

30-105-02 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

SEE SCHEDULE

X

Firm Fixed Price

0001 2018MAR06

W560MY

ARMY CONTRACTING COMMAND - RI-C3

BLDG 60 RODMAN AVENUE

ROCK ISLAND , IL 61299-8000

DAVID FIELDS

EMAIL: DAVID.S.FIELDS16.CIV@MAIL.MIL

W560MY-17-R-0005

2018FEB09

X

X 2018MAR26 02:00pm

/SIGNED/

2 signed

SEE SECOND PAGE FOR DESCRIPTION

1 6

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION A - SUPPLEMENTAL INFORMATION

Buyer Name: DAVID FIELDS

Buyer Office Symbol/Telephone Number: CCRC-VB/(309)782-4513

Type of Contract 1: Firm Fixed Price

Type of Contract 2: Cost No Fee

Kind of Contract: Other

*** End of Narrative A0000 ***

A. \*.The purpose of Amendment 0001 against Solicitation # W560MY-17-R-0005 is to:

1. \*.Extend the solicitation close date from 2:00 P.M. Central Time 13 March 2018 to 2:00 P.M. Central Time 26 March 2018.

2. Incorporate a revised version of Attachment 0001, PWS, dated 1 March 2018. This version replaces the previous version. Please read the updated document in its entirety to account for all changes.

3. Incorporate a revised version of Attachment 0004, Clause Addendum, dated 21 February 2018. This version replaces the previous version. Please read the updated document in its entirety to account for all changes.

4. Incorporate a revised version of Attachment 0005, Price Matrix, dated 1 March 2018. This version replaces the previous version. Please read the updated document in its entirety to account for all changes.

5. Incorporate a revised version of Attachment 0006, Instructions to Offerors Section L, dated 6 March 2018.

This version replaces the previous version. Please read the updated document in its entirety to account for all changes.

6. Incorporate a revised version of Attachment 0007, Evaluation of Offerors Section M, dated 1 March 2018.

This version replaces the previous version. Please read the updated document in its entirety to account for all changes.

7. Provide the following contractor questions and answers:

Q1: The language in Paragraph L.2.1(c) refers to "a single submission". To ensure that we do not exceed any file size restrictions of the network, is it acceptable for offerors to break the proposal up into multiple email submissions of the proposal, i.e. 1 of 3, 2 of 3, etc. or does the Government require a single email with all volumes and attachments?

A1: It is acceptable for offerors to break the proposal up into multiple email submissions when submitting.

Q2: When sending the proposal, if an offeror requests a Delivery and a Read receipt via email and also requests the receiver noted in the RFP to acknowledge receipt of the proposal and the proposal is otherwise timely, is this sufficient to ensure that the Government has received the proposal?

A2: Yes

Q3: Referencing Attachment 0006 Instructions to Offerors, Section L2.1d., Sentence 2 states: "Contractor shall submit its proposal via e-mail to David Fields and Rock Woodstock." Please provide email address for Mr. Woodstock.

A3: The proposal only needs to be sent via e-mail to David Fields. Attachment 006 has been revised to annotate this change.

Q4: Referencing Attachment 0006 Instructions to OFferors, Section L4.r., sentence 1 states: "The volume is limited to no more than 50 pages." Subsequent sentences 4 and 5 state the page limit is 60 pages.

A4: The page limit for Volume I Technical Capability Factor is 50 pages. Attachment 0006 has been corrected to annotate this change.

Q5: Referencing Attachment 0006 Instructions to Offerors, Section L1.b. states that a small part of the Contract will consist of Other Direct Costs (ODCs) for Mobilization, Demobilization, Defense Base Act (DBA) Insurance, Travel, and other miscellaneous items further addressed in Sections L5.4 and M5.3 which will be procured as cost-reimbursement no fee. However, Section L5.4.e. states that For CLINs 0001, 0002, 0003, 0004, and 0005, the offeror shall enter firm-fixed-prices for each period. These CLINs will encompass the OPSCEN labor, DBA Insurance, and any other direct labor component such as uplifts and hazard pay. Can the Government confirm that DBA Insurance is to be priced as part of the FFP CLINs?

A5: The Government confirms that DBA Insurance shall be priced as part of the FFP CLINs. Attachment 0006 has been corrected to annotate this change.

Q6: Referencing Attachment 0006 Instructions to Offerors, Section L5.4.g. does not mention the necessary medical costs that incur prior to sending an employee through CRC. Can the Government confirm that all offerors must price in the required medical costs associated with being stationed in Iraq?

A6: The Government confirms that all offerors must price in the required medical costs associated with being stationed in Iraq.

The Government is not responsible for primary medical care. The contractor will be required to provide routine medical coverage for its employees.

Q7: Referencing Attachment 0006 Instructions to Offerors, Section L5.4.f. states For cost reimbursable-no fee CLIN 0006, the

Government has provided a surrogate amount. The surrogate includes R&R inclusive of necessary VISAs and hotel accommodations, helicopter by Embassy Air, any billeting and OCONUS lodging costs. Is the airline cost for R&R inclusive in the plug number provided for CLIN 0006 or should the offeror price that cost in either the Mobilization or Demobilization CLINs?

2 6

W560MY-17-R-0005 0001

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

A7: The airline cost for R&R is included in CLIN 0006.

Q8: Could you kindly verify an award date?

A8: The Government cannot verify an award date at this time. The Government will perform due dilligence and contract award will not occur until all necessary reviews and approvals are accomplished.

Q9: How many hours in a shift/how many days a week/any unusual times for shift?

A9: The Contractor will need to be prepared to work 12 hour shifts/7 days a week, including holidays, as necessary to accomplish the mission.

Q10: How many people need to be on a station at any time? What is the rotation? The Statement of Work says that there cannot be a break in services, so how will we backfill if somebody gets sick, has an emergency or goes on vacation?

A10: The Contractor will be responsible to ensure there is no lapse in requirements as outlined in PWS if someone is sick, on emergency leave or vacation. Rotation (R&R) must be coordinated through the site lead with the COR to ensure the minimum number of personnel are on station.

Q11: For vacation, is it once a 12-month? What is vacation period? Statement of work states 1 trip every 12 months. Are we taking on the cost? If so, are we taking on the cost of flying in a replacement?

A11: The Governments intent is usual and customary R&R policy. If an employee is on a 12-month contract, they would mobilize in and then work for 6-months, take R&R for up to two weeks, work for another 6-months and then demobilize. The Government is responsible for the travel reimbursement costs for one R&R trip per 12 month period. The Government is responsible for the costs of flying in a replacement.

Q12: Has there been an agreement on accommodations? Per Diem? Travel? Life Support DBA?

A12: Information is provided in the PWS section 9.0. Government will provide life support (living quarters, food, security) as part of the Department of State ICASS. If Embassy Air is required then the vendor must pay using pay.gov and will be reimbursed upon KO approval.

Q13: In the excel spreadsheet, you have ODC and the cost of $76,000 do you have a breakdown of those numbers?

A13: Yes, please reference Attachment 0006, Section L5.4.f.

Q14: What G&A rate will you be using? Do we share in those numbers?

A14: No, G&A will vary from offeror to offeror.

Q15: What are the percentages for Hazardous Duty Pay? Post Differential?

A15: The labor portion of this requirement is firm-fixed-price. Defense Base Act (DBA) Insurance will cover employees for

Hazardous Duty Pay and Post Differential. DBA Insurance is a requirement for all employees that will be working under this contract.

Q16: Please verify contract type. Firm-Fixed Price? Cost Plus?

A16: Referencing Attachment 0006, Section L1.b., the contract will be firm-fixed-price and cost-reimbursable no fee.

Q17: I do see here on Price sheet and on the blue boxes we must add the salary only which not include other fees or visas cost, or emergency leave or mobilization from US to Iraq or transportation from Baghdad Airport to IZ or transportation of employees from IZ to somewhere else, Am I correct? If yes, then the other expenses will be paid per approval and invoice or how? If no, then do you want me to add the other expenses also to the blue boxes?

A17: Yes, the other expenses will be paid using all of the CLINs reference in Attachment 0005, Price Matrix. Please reference

Attachment 0006, Section L5.4, Instructions for completion of the Pricing Matrix for further instructions. Please reference

Question and Answer # 5 above for information concerning how to price DBA Insurance.

Q18: Referencing Attachment 0006 Instructions to Offerors, Section L4.r, please confirm no other volume, except volume I is to have a second copy (a redacted version) submitted.

A18: The Government confirms that no other volume other than Volume I is to have a second copy (A redacted version) submitted.

Q19: The Government states in Attachment 0006, The contractor shall submit with its proposal an OCI Mitigation Plan\'85

Attachment 0004 states, The Contractor shall provide a detailed OCI Mitigation Plan within 30 calendar days of contract award.

Attachment 0001 states, Therefore it is in the Governments and offerors best interest to allow potential offerors the opportunity to provide an OCI Mitigation Plan, if the offeror so desires. Is the OCI mitigation plan a requirement of the proposal or due 30 days after award?

A19: An OCI Mitigation Plan is required at time of proposal submission. Attachment 0001 and Attachment 0004 have been corrected to reflect this language.

Q20: Referencing Attachment 0001 PWS, Sections 8.1.2 and 8.2.2, the Government states, Must be familiar with the various operational support systems utilized by the Office of Security Cooperation-Iraq. Please include a list of all relevant systems knowledge the Government would like industry to capture in their recruitment efforts.

3 6

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

A20: Requirements are outlined. Contractor must have basic computer skills and skills as outlined in PWS 7.1. PWS Sections

8.1.2 and 8.2.2 further outline specific programs.

Q21: Referencing Attachment 0001 PWS, Section 10.7, the Government states, Mobilization is paid only once per person. Please clarify if this cost per person is paid once over the life of the contract, paid once per year, etc.?

A21: This cost is per person per year depending how long the person is on the contract.

Q22: Referencing Attachment 0005 Price Matrix, Mobilization/Demobilization costs per person may vary depending on the

Governments approval and accepted frequency. Request the Government provide an estimate of PAX mobilized/demobilized or plug for both Mobilization and Demobilization to keep evaluation consistent among industry. The requirement for industry would be to develop the cost per person mobilized with detail and supporting documentation.

A22: Plug numbers have been added for CLINs 0007 and 0008. Please reference Attachment 0006 as well as the Price Matrix for the changes.

Q23: Referencing Attachment 0006 Instructions to Offerors, Section L4.1, please clarify whether the Introduction explanation provided in L5.2.1) is the same requirement in all volumes (Introductory, Past Performance, and Pricing).

A23: Yes the Introduction explanation provided in Attachment 0006, Section L5.2.1 can be the same for all volumes referenced in

Attachment 0006, Section L4.1.

Q24: Does the bidder need to be registered with the Iraq Ministry of Trade and General Commission for Taxation (GCT)?

A24: Yes, however vendors are tax exempt because this requirement falls under the Department of Defense (DoD).

Q25: Is the bidder required to have a business office and life support function in Baghdad?

A25: No

Q26: For visa purposes, who is the sponsor of the OPSCEN personnel (USG or vendor)?

A26: USG

Q27: Referencing Attachment 0001 PWS Section 4.2, can prospective bidders visit the end user (OSC-I) COR and conduct a site visit?

A27: No

Q28: Referencing Attachment 0001 PWS Section 9.9, will OPSCEN personnel be moved to the USE-Baghdad compound via the existing security provider to the embassy?

A28: Yes, secure transfer from commercial airport will be available. Personnel will be required to fly on Embassy Air from

Baghdad International Airport to the Embassy Helicopter Port (EHP). Flights must be paid using pay.gov, booked by OSC-I and are a claimable travel expense by the vendor.

Q29: Referencing Attachment 0001 PWS Section 10.6, when will the existing contractor phase-out plan be available for review?

A29: The existing contractor phase-out plan would be available for review within 7 days of contract award.

Q30: Referencing Attachment 0006 Instructions to Offerors, Section L4.r, please confirm Volume 1 should be an electronic copy submitted via email.

A30: The Government confirms that Volume I should be an electronic copy submitted via email.

Q31: Referencing Attachment 0006 Instructions to Offerors, Paragraph L4.1, the section numbering for Volume I starts as 4.1.2, with Section A as 4.1.2.1. However, the Introduction and Table of Contents are numbered 4.1.1.2.1 and 4.1.1.2.2, respectively.

This is not consistent with the main section numbering (4.1.2). Is this correct or should the Introduction section be

4.1.2.1.1, and the Table of Contents be 4.1.2.1.2?

A31: This numbering issue has been corrected. Attachment 0006, Section L4.1 has been updated.

Q32: Referencing Attachment 0006 Instructions to Offerors, Paragraph L4.1, the section numbering for Volume I starts as 4.1.3, with Section A as 4.1.3.1. However, the Introduction and Table of Contents are numbered 4.2.3.1.1 and 4.2.3.1.2, respectively.

This is not consistent with the main section numbering (4.1.3). Is this correct or should the Introduction section be

4.1.3.1.1, and the Table of Contents be 4.1.3.1.2?

A32: This numbering issue has been corrected. Attachment 0006, Section L4.1 has been updated.

Q33: Referencing Attachment 0006 Instructions to Offerors, Paragraph L4.1, the section numbering for Volume I starts as 4.1.4, with Section A as 4.1.4.1. However, the Introduction and Table of Contents are numbered 4.2.4.1.1 and 4.2.4.1.2, respectively.

This is not consistent with the main section numbering (4.1.4). Is this correct or should the Introduction section be

4.1.4.1.1, and the Table of Contents be 4.1.4.1.2?

A33: This numbering issue has been corrected. Attachment 0006, Section L4.1 has been updated.

Q34: Referencing Attachment 0006 Instructions to Offerors, Paragraph L5.3.5, the solicitation requires offerors to provide a copy of any Corrective Action Report (CAR) and corrective actions taken to avoid reoccurrence. Since Level I and II CARs are

4 6

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

both not uncommon and also not reportable, will the Government please clarify this requirement if it is intended to be Level

III CARs or above?

A34: Attachment 0006, Section L.5.3.5e) remains unchanged. The Offeror is required to provide a copy of any CAR.

B. All other terms and conditions remain unchanged.

C. The point of contact is David Fields, email: david.s.fields16.civ@mail.mil.

*** END OF NARRATIVE A0002 ***

5 6

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION J - LIST OF ATTACHMENTS

List of Number List of Number

Addenda Title Date of Pages Transmitted By Addenda Title Date of Pages Transmitted By________________ ____________________________________________________________ _______________ ____________ _______________________________ ____________________________________________________________ _______________ ____________ _______________

Attachment 0001 PWS 01-MAR-2018 019 DATA

Attachment 0004 CLAUSE ADDENDUM 21-FEB-2018 042 DATA

Attachment 0005 PRICE MATRIX 01-MAR-2018 001 DATA

Attachment 0006 INSTRUCTIONS TO OFFERORS SECTION L 06-MAR-2018 019 DATA

Attachment 0007 EVALUATION OF OFFERS SECTION M 01-MAR-2018 005 DATA

6 6