Exhibit_A_Contract_Data_Requirements_List_-M72.pdf
PDF 416 KB Posted
- Attached to
- M70 Series Cable Assemblies
- Solicitation number
- W52P1J-18-R-0153
About this file
Exhibit A Contract Data Requirements List -M72
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST
CABLE ASSEMBLY, FUZE CONTROL, M72
ADL 7542966 REV AC
FY 2020
SEQUENCE TITLE OF DATA ITEM DATA ITEM
NUMBER
(1) QUALITY PROGRAM PLAN (QPP) A001
(2) STATISTICAL PROCESS CONTROL (SPC) PLAN A002
(3) INSPECTION AND TEST PLAN A003
(4) MEASUREMENT SYSTEM EVALUATION (MSE) – A004
MEASUREMENT AND INSPECTION ERQUIPMENT
SYSTEM DESIGN DOCUMENTATION FOR ACCEPTANCE
OF PRODUCT – ACCEPTANCE INSPECTION EQUIPMENT
(5) REQUEST FOR VARIANCE (RFV) A005
(6) ENGINEERING CHANGE PROPOSAL (ECP) A006
(7) NOTICE OF REVISION (NOR) A007
(8) TEST/ INSPECTION REPORT – A008
FIRST ARTICLE TEST REPORT (FATR)
(9) TEST/ INSPECTION REPORT – A009
LOT ACCEPTANCE TEST REPORT
(10) AMMUNITION DATA CARD A010
(11) FAILURE ANALYSIS AND CORRECTIVE ACTION REPORT A011
(FACAR)
(12) OPERATIONS SECURITY (OPSEC) PLAN A012
CONTRACT DATA REQUIREMENTS LIST Form Approved (1 Data Item) OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP ___________ TM ___________ OTHER ________________________
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
CABLE ASSEMBLY, FUZE CONTROL,
M72
R19E09I5HI
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A001 QUALITY PROGRAM PLAN (QPP)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-QCIC-81722 SECTION E (SEE BLK 16) AMSJM-QAP
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY 14. DISTRIBUTION
LT ONE/R (SEE 16)
12. DATE OF FIRST SUBMISSION
120 DAC (SEE 16)
a. ADDRESSEE
b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
Draft Final
A N/A ASREQ (SEE 16) Reg Repro
AMSJM-QAP 0 1 0 16. REMARKS
BLK 5: THE QUALITY PROGRAM PLAN (QPP) SHALL DOCUMENT THE
CONTRACTOR'S IMPLEMENTATION OF A QUALITY SYSTEM IN
ACCORDANCE WITH THE QUALITY ASSURANCE PROVISION (QAP).
BLK 10, 12: THE QPP SHALL BE SUBMITTED NO LATER THAN 120
CALENDAR DAYS AFTER CONTRACT AWARD. THE GOVERNMENT
REQUIRES 30 DAYS FOR REVIEW. DISPOSITION OF THE QPP WILL BE
PROVIDED THROUGH THE PROCURING CONTRACTING OFFICER (PCO).
IF FURTHER REVISIONS ARE NECESSARY, THE CONTRACTOR SHALL
HAVE 15 DAYS TO PROVIDE REVISIONS AND THE GOVERNMENT
SHALL REVIEW AND PROVIDE DISPOSITION WITHIN 15 DAYS OF
RECEIPT. THE QPP SHALL BE APPROVED PRIOR TO FAT, IF FAT IS
REQUIRED, OR PRIOR TO INITIATION OF PRODUCTION.
BLK 13: SUBMIT UPDATES/REVISIONS FOR REVIEW AND APPROVAL
PRIOR TO IMPLEMENTATION.
BLK 14: SUBMIT IN ACCORDANCE WITH ATTACHMENT 0004 VIA
EMAIL OR SAFE ACCESS FILE EXCHANGE (SAFE) (https:// safe.amrdec.army.mil/safe/).
NAWCWD (685200D) 0 1 0
NAWCWD (QA) 0 1 0
DCMA-MCWB (QAR) 0 1 0
CCRC-AR 0 1 0
SFAE-AA-JB 0 1 0
(SEE BLK 16)
15. TOTAL 0 6 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Jennifer Diaz DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 12 Pages
QCIC
16 AUG 2018
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP ___________ TM ___________ OTHER ________________________
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
CABLE ASSEMBLY, FUZE CONTROL,
M72
R19E09I5HI
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A002 STATISTICAL PROCESS CONTROL (SPC) PLAN
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-MGMT-81987 SECTION E AMSJM-QAP
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY 14. DISTRIBUTION
LT ONE/R (SEE 16)
12. DATE OF FIRST SUBMISSION
120 DAC (SEE 16)
a. ADDRESSEE
b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
Draft Final
A N/A ASREQ (SEE 16) Reg Repro
AMSJM-QAP 0 1 0 16. REMARKS
BLK 10, 12: THE GENERAL PLAN SHALL BE SUBMITTED NO LATER
THAN 120 CALENDAR DAYS AFTER CONTRACT AWARD. THE FINAL
DETAILED PLAN SHALL BE SUBMITTED 30 DAYS AFTER FAT
APPROVAL, IF FAT IS REQUIRED, OR 30 DAYS AFTER INITIATION OF
PRODUCTION. THE GOVERNMENT REQUIRES 30 DAYS FOR REVIEW.
DISPOSITION OF THE GENERAL AND DETAILED SECTIONS WILL BE
PROVIDED THROUGH THE PROCURING CONTRACTING OFFICER (PCO).
IF FURTHER REVISIONS ARE NECESSARY, THE CONTRACTOR SHALL
HAVE 15 DAYS TO PROVIDE REVISIONS AND THE GOVERNMENT
SHALL REVIEW AND PROVIDE DISPOSITION WITHIN 15 DAYS OF
RECEIPT.
BLK 13: SUBMIT UPDATES/REVISIONS FOR REVIEW AND APPROVAL
PRIOR TO IMPLEMENTATION.
BLK 14: SUBMIT IN ACCORDANCE WITH ATTACHMENT 0004 VIA
EMAIL OR SAFE ACCESS FILE EXCHANGE (SAFE) (https:// safe.amrdec.army.mil/safe/).
NAWCWD (685200D) 0 1 0
NAWCWD (QA) 0 1 0
DCMA-MCWB (QAR) 0 1 0
CCRC-AR 0 1 0
SFAE-AA-JB 0 1 0
(SEE BLK 16)
15. TOTAL 0 6 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Jennifer Diaz DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 2 of 12 Pages
MGMT
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP ___________ TM ___________ OTHER ________________________
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
CABLE ASSEMBLY, FUZE CONTROL,
M72
R19E09I5HI
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A003 INSPECTION AND TEST PLAN
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-QCIC-81110 SECTION E (SEE BLK 16) AMSJM-QAP
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY 14. DISTRIBUTION
LT ONE/R (SEE 16)
12. DATE OF FIRST SUBMISSION
120 DAC (SEE 16)
a. ADDRESSEE
b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
Draft Final
A N/A ASREQ (SEE 16) Reg Repro
AMSJM-QAP 0 1 0 16. REMARKS
BLK 5: THE INSPECTION AND TEST PLAN (ITP) SHALL BE IN
ACCORDANCE WITH THE QUALITY ASSURANCE PROVISION (QAP).
BLK 10, 12: THE ITP SHALL BE SUBMITTED NO LATER THAN 120
CALENDAR DAYS AFTER CONTRACT AWARD. THE GOVERNMENT
REQUIRES 30 DAYS FOR REVIEW. DISPOSITION OF THE ITP WILL BE
PROVIDED THROUGH THE PROCURING CONTRACTING OFFICER (PCO).
IF FURTHER REVISIONS ARE NECESSARY, THE CONTRACTOR SHALL
HAVE 15 DAYS TO PROVIDE REVISIONS AND THE GOVERNMENT
SHALL REVIEW AND PROVIDE DISPOSITION WITHIN 15 DAYS. THE ITP
SHALL BE APPROVED PRIOR TO FAT, IF FAT IS REQUIRED, OR PRIOR
TO INITIATION OF PRODUCTION.
BLK 13: SUBMIT UPDATES/REVISIONS FOR REVIEW AND APPROVAL
PRIOR TO IMPLEMENTATION.
BLK 14: SUBMIT IN ACCORDANCE WITH ATTACHMENT 0004 VIA
EMAIL OR SAFE ACCESS FILE EXCHANGE (SAFE) (https:// safe.amrdec.army.mil/safe/).
NAWCWD (685200D) 0 1 0
NAWCWD (QA) 0 1 0
DCMA-MCWB (QAR) 0 1 0
CCRC-AR 0 1 0
SFAE-AA-JB 0 1 0
(SEE BLK 16)
15. TOTAL 0 6 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Jennifer Diaz DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 3 of 12 Pages
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP ___________ TM ___________ OTHER ________________________
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
CABLE ASSEMBLY, FUZE CONTROL,
M72
R19E09I5HI
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A004 MEASUREMENT SYSTEM EVALUATION (MSE) –
MEASUREMENT AND INSPECTION EQUIPMENT
SYSTEM DESIGN DOCUMENTATION FOR
ACCEPTANCE OF PRODUCT
ACCEPTANCE INSPECTION EQUIPMENT
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-QCIC-81960 SECTION E (MSE CLAUSE) NSWC (MS-21)
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY 14. DISTRIBUTION
LT ONE/R (SEE 16)
12. DATE OF FIRST SUBMISSION
120 DAC (SEE 16)
a. ADDRESSEE
b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
Draft Final
A N/A ASREQ (SEE 16) Reg Repro
NSWC (MS-21) 0 1 0 16. REMARKS
BLK 10, 12: THE CONTRACTOR SHALL SUBMIT A COMPLETED
ACCEPTANCE INSPECTION EQUIPMENT (AIE) PACKAGE NO LATER
THAN 120 CALENDAR DAYS AFTER CONTRACT AWARD. THE
GOVERNMENT WILL PROVIDE DISPOSITION WITHIN 30 DAYS AFTER
FINAL AIE PACKAGE RECEIPT.
BLK 13: IF FURTHER REVISIONS ARE NECESSARY, THE
CONTRACTOR SHALL HAVE 15 DAYS TO GENERATE REVISIONS AND
THE GOVERNMENT SHALL HAVE 15 DAYS TO REVIEW AND
RESPOND. THE APPROVED AIE SHALL BE AVAILABLE FOR FAT, IF
FAT IS REQUIRED, PRODUCTION, AND/OR ALL ACCEPTANCE OF
PRODUCT UNDER THE CONTRACT.
IF CONTRACTOR REVISES A PREVIOUSLY GOVERNMENT-ACCEPTED
AIE FOR THIS CONTRACT, THE REVISED AIE MUST BE SUBMITTED
TO THE GOVERNMENT FOR REVIEW AND APPROVAL. GOVERNMENT
APPROVAL MUST BE GRANTED BEFORE AIE IS USED FOR
ACCEPTANCE OF PRODUCT. THE GOVERNMENT WILL RESPOND
WITHIN 30 DAYS AFTER RECEIPT OF AIE.
THE CONTRACTOR SHALL NOTIFY THE RESPONSIBLE GOVERNMENT
TECHNICAL AGENCY WITHIN A MINIMUM OF 30 DAYS PRIOR
TO ACCEPTANCE (PROVE OUT) TESTING.
BLK 14: SUBMIT IN ACCORDANCE WITH ATTACHMENT 0004 VIA
EMAIL OR SAFE ACCESS FILE EXCHANGE (SAFE) (https:// safe.amrdec.army.mil/safe/).
AMSJM-QAP 0 1 0
NAWCWD (685200D) 0 1 0
NAWCWD (QA) 0 1 0
DCMA-MCWB (QAR) 0 1 0
CCRC-AR 0 1 0
SFAE-AA-JB 0 1 0
(SEE BLK 16)
15. TOTAL 0 7 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Jennifer Diaz DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 4 of 12 Pages
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP ___________ TM ___________ OTHER ________________________
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
CABLE ASSEMBLY, FUZE CONTROL,
M72
R19E09I5HI
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A005 REQUEST FOR VARIANCE (RFV)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-SESS-80640D (SEE BLK 16) SECTION C NAWCWD (685200D)
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT ASREQ ASREQ
a. ADDRESSEE
b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
Draft Final
A N/A ASREQ Reg Repro
NAWCWD (685200D) 0 1 0 16. REMARKS
BLK 4: DELETE PARAGRAPH 2B AND 2C AND INCLUDE ADEQUATE
DATA/ANALYSIS/TESTING TO SUPPORT THE REQUEST IN THE
CONTENT OF THE RFV. THE CONTRACTOR SHALL PREPARE AND
SUBMIT A RFV FOR EACH VARIANCE ON DD FORM 1694, LOCATED AT:
http://www.dtic.mil/whs/directives/forms/dd/ddforms1500-1999.htm
BLK 14: SUBMIT IN ACCORDANCE WITH ATTACHMENT 0004 VIA
EMAIL OR SAFE ACCESS FILE EXCHANGE (SAFE) (https:// safe.amrdec.army.mil/safe/).
NAWCWD (QA) 0 1 0
CCRC-AR 0 1 0
SFAE-AA-JB 0 1 0
(SEE BLK 16)
15. TOTAL 0 4 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Jennifer Diaz DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 5 of 12 Pages
SESS
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP ___________ TM ___________ OTHER ________________________
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
CABLE ASSEMBLY, FUZE CONTROL,
M72
R19E09I5HI
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A006 ENGINEERING CHANGE PROPOSAL (ECP)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-SESS-80639D (SEE BLK 16) SECTION C NAWCWD (685200D)
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT ASREQ ASREQ
a. ADDRESSEE
b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
Draft Final
A N/A ASREQ Reg Repro
NAWCWD (685200D) 0 1 0 16. REMARKS
BLK 4: DELETE PARAGRAPH 2B AND 2C. SUBMIT TEXT FILES IN
GOVERNMENT COMPATIBLE MICROSOFT WORD AND VIEW FILES IN
GOVERNMENT COMPATIBLE ADOBE ACROBAT. FOR DRAWINGS,
SUBMIT PDF VIEW FILES IN GOVERNMENT COMPATIBLE ADOBE
ACROBAT.
THE CONTRACTOR SHALL PREPARE AND SUBMIT AN ECP ON DD
FORM 1692, LOCATED AT:
http://www.dtic.mil/whs/directives/forms/dd/ddforms1500-1999.htm
BLK 14: SUBMIT IN ACCORDANCE WITH ATTACHMENT 0004 VIA
EMAIL OR SAFE ACCESS FILE EXCHANGE (SAFE) (https:// safe.amrdec.army.mil/safe/).
NAWCWD (QA) 0 1 0
CCRC-AR 0 1 0
SFAE-AA-JB 0 1 0
(SEE BLK 16)
15. TOTAL 0 4 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Jennifer Diaz
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 6 of 12 Pages
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP ___________ TM ___________ OTHER ________________________
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
CABLE ASSEMBLY, FUZE CONTROL,
M72
R19E09I5HI
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A007 NOTICE OF REVISION (NOR)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-SESS-80642D (SEE BLK 16) SECTION C NAWCWD (685200D)
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT ASREQ ASREQ
a. ADDRESSEE
b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
Draft Final
A N/A ASREQ Reg Repro
NAWCWD (685200D) 0 1 0 16. REMARKS
BLK 4: DELETE PARAGRAPH 2B AND 2C. SUBMIT IN CONJUNCTION
WITH CDRL A006 (ECP).
FOR EACH DRAWING, ASSOCIATED LIST, OR OTHER REFERENCED
DOCUMENT WHICH REQUIRES REVISION, THE CONTRACTOR SHALL
PREPARE AND SUBMIT NOR ON DD FORM 1695, LOCATED AT:
http://www.dtic.mil/whs/directives/forms/dd/ddforms1500-1999.htm
BLK 14: SUBMIT IN ACCORDANCE WITH ATTACHMENT 0004 VIA
EMAIL OR SAFE ACCESS FILE EXCHANGE (SAFE) (https:// safe.amrdec.army.mil/safe/).
NAWCWD (QA) 0 1 0
CCRC-AR 0 1 0
SFAE-AA-JB 0 1 0
(SEE BLK 16)
15. TOTAL 0 4 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Jennifer Diaz
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 7 of 12 Pages
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP ___________ TM ___________ OTHER ________________________
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
CABLE ASSEMBLY, FUZE CONTROL,
M72
R19E09I5HI
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A008 TEST/INSPECTION REPORT FIRST ARTICLE TEST REPORT (FATR)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-NDTI-80809B SECTION E AMSJM-QAP
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY 14. DISTRIBUTION
LT ONE/R (SEE 16)
12. DATE OF FIRST SUBMISSION
ASREQ (SEE 16)
a. ADDRESSEE
b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
Draft Final
A N/A ASREQ (SEE 16) Reg Repro
AMSJM-QAP 0 1 0 16. REMARKS
BLK 10, 12: THE FIRST ARTICLE TEST (FAT) REPORT SHALL BE
SUBMITTED WITH QAR FINDINGS ON DD FORM 1222. FAT REPORT
SHALL BE SUBMITTED 30 DAYS AFTER FAT. THE GOVERNMENT
REQUIRES 30 DAYS FOR REVIEW. DISPOSITION OF THE FAT REPORT
WILL BE PROVIDED THROUGH THE PCO. FAT MUST BE APPROVED
PRIOR TO PRODUCTION.
BLK 13: IF FURTHER REVISIONS ARE NECESSARY, THE CONTRACTOR
SHALL HAVE 15 DAYS TO GENERATE REVISIONS AND THE
GOVERNMENT SHALL HAVE 15 DAYS TO REVIEW AND RESPOND.
BLK 14: SUBMIT IN ACCORDANCE WITH ATTACHMENT 0004 VIA
EMAIL OR SAFE ACCESS FILE EXCHANGE (SAFE) (https:// safe.amrdec.army.mil/safe/).
NAWCWD (685200D) 0 1 0
NAWCWD (QA) 0 1 0
DCMA-MCWB (QAR) 0 1 0
CCRC-AR 0 1 0
SFAE-AA-JB 0 1 0
(SEE BLK 16)
15. TOTAL 0 6 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Jennifer Diaz
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 8 of 12 Pages
NDTI
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP ___________ TM ___________ OTHER ________________________
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
CABLE ASSEMBLY, FUZE CONTROL,
M72
R19E09I5HI
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A009 TEST/INSPECTION REPORT LOT ACCEPTANCE TEST REPORT
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-NDTI-80809B (SEE BLK 16) SECTION E DCMA-MCWB (QAR)
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT ASREQ (SEE 16) ASREQ (SEE 16)
a. ADDRESSEE
b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
Draft Final
A N/A ASREQ (SEE 16) Reg Repro
16. REMARKS DCMA-MCWB (QAR) 0 1 0
BLK 4: LOT ACCEPTANCE TEST (LAT) REPORTS SHALL CONTAIN ALL
INSPECTION RECORDS OF CLASSIFIED CHARACTERISTIC SAMPLES
AND ANY OTHER TESTS REQUIRED FOR EACH LOT PER THE
CONTRACT.
BLK 10, 12, 13: SUBMISSION OF LAT REPORTS AND PRODUCTION
ACCEPTANCE TEST REPORTS SHALL BE NO LATER THAN 30 DAYS
AFTER LAT. THE QAR WILL PROVIDE DISPOSITION OF
LOT/PRODUCTION ACCEPTANCE TEST REPORTS.
BLK 14: LAT REPORTS SHALL BE SUBMITTED BY ACCESSING THE
WORLDWIDE AMMUNITION DATA CARD REPOSITORY PROGRAM
(WARP) WHICH IS LOCATED ON THE MUNITIONS HISTORY PROGRAM
(MHP) WEBSITE AT: https://mph.redstone.army.mil/. SUBMIT
ELECTRONICALLY UNLESS OTHERWISE SPECIFIED.
WARP 0 1 0
CCRC-AR 0 1 0
0 1 0
(SEE BLK 16)
15. TOTAL 0 4 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Jennifer Diaz
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 9 of 12 Pages
NDTI
SFAE-AA-JB
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP ___________ TM ___________ OTHER ________________________
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
CABLE ASSEMBLY, FUZE CONTROL,
M72
R19E09I5HI
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A010 AMMUNITION DATA CARD
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-MISC-80043B SECTION C, MIL-STD-1168 AMSJM-QAP
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
NO ASREQ (SEE 16) ASREQ (SEE 16)
a. ADDRESSEE
b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
Draft Final
N/A N/A ASREQ (SEE 16) Reg Repro
16. REMARKS DCMA-MCWB (QAR) 0 1 0
BLK 10, 12, 13: AMMUNITION DATA CARDS (ADC) SHALL BE
PREPARED IAW MIL-STD-1168, SECTION C, AND BY ACCESSING THE
WORLDWIDE AMMUNITION DATA REPOSITORY PROGRAM (WARP),
WHICH IS LOCATED AT https://mhp.redstone.army.mil.
BLK 14: SUBMIT VIA THE INTERNET OR MAIL A CD ROM (PC FORMAT)
IN ACCORDANCE WITH ATTACHMENT 0004.
*HARD COPY ADC PROVIDED WITH LOT SHIPMENTS SHALL BE
GENERATED FROM THE WARP PROGRAM AND SIGNED AND DATED
BY THE GOVERNMENT AGENCY RESPONSIBLE FOR ACCEPTANCE
(GARA).
**WHEN BALLISTIC TESTS ARE REQUIRED, ONE HARD COPY
GENERATED FROM THE WARP PROGRAM SIGNED AND DATED BY THE
GARA SHALL BE SENT TO THE PROVING GROUND WITH SAMPLE
SHIPMENT, PLUS AN ADDITIONAL SIGNED HARD COPY PROVIDED TO
THE PROVING GROUND BY MAIL.
WARP 0 1 0
LOT SHIPMENT* 0 2 0
MAIL TO DEST** 0 2 0
(SEE BLK 16)
15. TOTAL 0 6 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Jennifer Diaz
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 10 of 12 Pages
MISC
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP ___________ TM ___________ OTHER ________________________
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
CABLE ASSEMBLY, FUZE CONTROL,
M72
R19E09I5HI
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A011
FAILURE ANALYSIS AND CORRECTIVE ACTION
REPORT (FACAR)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-SESS-80255A Attachment 0008 - QAP 923AS900 AMSJM-QAP
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT ASREQ (SEE 16) ASREQ (SEE 16)
a. ADDRESSEE
b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
Draft Final
A N/A ASREQ (SEE 16) Reg Repro
AMSJM-QAP 0 1 0 16. REMARKS
BLK 5: THE FAILURE ANALYSIS AND CORRECTIVE ACTION REPORT
(FACAR) SHALL BE IN ACCORDANCE WITH THE QUALITY ASSURANCE
PROVISION (QAP).
BLK 10, 12, 13: CONTRACTOR SHALL NOTIFY NAWCWD (QA),
NAWCWD (685200D), AMSJM-QAP, AND THE PCO VIA EMAIL WITHIN 24
HOURS AFTER THE OCCURRENCE OF A FAILURE DURING
ACCEPTANCE TESTING; INCLUDING, BUT NOT LIMITED TO, ANY
FAILURES DURING FAT/LAT AND ANY DESTRUCTIVE OR
NONDESTRUCTIVE TEST FAILURES. FORMAL SUBMITTAL SHALL BE
NO LATER THAN 10 DAYS AFTER REPORTED FAILURE. FINAL REPORT
SHALL BE SUBMITTED NO LATER THAN 30 DAYS AFTER
DETERMINING/CONDUCTING ROOT CAUSE FAILURE ANALYSIS.
BLK 14: SUBMIT IN ACCORDANCE WITH ATTACHMENT 0004 VIA
EMAIL OR SAFE ACCESS FILE EXCHANGE (SAFE) (https:// safe.amrdec.army.mil/safe/).
NAWCWD (685200D) 0 1 0
NAWCWD (QA) 0 1 0
DCMA-MCWB (QAR) 0 1 0
CCRC-AR 0 1 0
SFAE-AA-JB 0 1 0
(SEE BLK 16)
15. TOTAL 0 6 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Jennifer Diaz
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 11 of 12 Pages
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP ___________ TM ___________ OTHER ________________________
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
CABLE ASSEMBLY, FUZE CONTROL,
M72
R19E09I5HI
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A012 OPERATIONS SECURITY (OPSEC) PLAN
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-MGMT-80934C SECTION H AMSJM-OPP
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT ONE/R ASREQ (SEE 16)
a. ADDRESSEE
b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
Draft Final
A N/A ASREQ (SEE 16) Reg Repro
AMSJM-OPP 0 1 0 16. REMARKS
BLK 10: GOVERNMENT REQUIRES 10 CALENDAR DAYS REQUIRED
FOR REVIEW AND APPROVAL. IF REVISIONS ARE REQUIRED,
RESUBMIT 10 CALENDAR DAYS AFTER RECEIPT OF GOVERNMENT
COMMENTS.
BLK 12: CONTRACTOR SHALL SUBMIT OPSEC PLAN 30 CALENDAR
DAYS AFTER THE CONTRACTING OFFICER PROVIDES THE LIST OF
KNOWN CRITICAL INFORMATION (CI)/THREAT INFORMATION.
BLK 13: ANNUAL SELF-ASSESSMENT AND CHECKLIST ARE DUE ON
THE ANNIVERSARY OF THE CONTRACT AWARD DATE.
BLK 14: SUBMIT IN ACCORDANCE WITH ATTACHMENT 0004 VIA
EMAIL OR SAFE ACCESS FILE EXCHANGE (SAFE) (https:// safe.amrdec.army.mil/safe/) IN ADDITION TO usarmy.ria.jmc.mbx.opsec-fd@mail.mil.
AMSJM-QAP 0 1 0
NAWCWD (685200D) 0 1 0
NAWCWD (QA) 0 1 0
DCMA-MCWB (QAR) 0 1 0
CCRC-AR 0 1 0
SFAE-AA-JB 0 1 0
(SEE BLK 16)
15. TOTAL 0 7 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Jennifer Diaz
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 12 of 12 Pages
MGMT
| A001 - QUALITY PROGRAM PLAN |
| A002 - STATISTICAL PROCESS CONTROL PLAN (SPC) |
| A003 - INSPECTION AND TEST PLAN (ITP) |
| A004 - ACCEPTANCE INSPECTION EQUIPMENT (AIE) |
| A005 - REQUEST FOR VARIANCE (RFV) |
| A006 - ENGINEERING CHANGE PROPOSAL (ECP) |
| A007 - NOTICE OF REVISION (NOR) |
| A008 - FIRST ARTICLE TEST REPORT (FATR) |
| A009 - LOT ACCEPTANCE TEST REPORT (LAT) |
| A010 - AMMUNITION DATA CARD (ADC) |
| A011 - FAILURE ANALYSIS AND CORRECTIVE ACTION REPORT (FACAR) |
| A012 - OPERATIONS SECURITY (OPSEC) PLAN |
File details come from the government source that posted it.