AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of
2. Amendment/Modification No.
3. Effective Date
4. Requisition/Purchase Req No.
5. Project No. (If applicable)
6. Issued By Code 7. Administered By (If other than Item 6) Code
8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code)
9A. Amendment Of Solicitation No.
9B. Dated (See Item 11)
10A. Modification Of Contract/Order No.
10B. Dated (See Item 13) Code Facility Code
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. Accounting And Appropriation Data (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS
It Modifies The Contract/Order No. As Described In Item 14.
A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In
The Contract/Order No. In Item 10A.
B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set
Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).
C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:
D. Other (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.
14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. Name And Title Of Signer (Type or print)
16A. Name And Title Of Contracting Officer (Type or print)
15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed
By (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITIONS UNUSABLE
30-105-02 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
SEE SCHEDULE
X
Firm Fixed Price
0006 2017MAR23
W52P1J
ARMY CONTRACTING COMMAND - RI
ROCK ISLAND, IL 61299-8000
BLDGS 60 & 62
MARK D. STEVENS
EMAIL: MARK.D.STEVENS.CIV@MAIL.MIL
W52P1J-17-R-0006
2017FEB10
X
X
/SIGNED/
2 signed
SEE SECOND PAGE FOR DESCRIPTION
1 8
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
Buyer Name: MARK D. STEVENS
Buyer Office Symbol/Telephone Number: CCRC-AF/(309)782-2082
Type of Contract 1: Firm Fixed Price
Kind of Contract: Supply Contracts and Priced Orders
*** End of Narrative A0000 ***
1. The purpose of this Amendment 0006 to Solicitation W52P1J-17-R-0006 is to provide Government responses to Contractor questions regarding various requirements contained in the subject Solicitation. These are above and beyond the questions and answers provided in
Amendments 0002 and 0005.
2. The Contractor questions (Q) and Government responses (R) are outlined below and relate to Technical.
3. Technical Questions ___________________
Q: The First Article Test (FAT) requirement for the M172 Inert acquisition consists of five (5) component FATs to include Cartridge, Link, Bandoleer, Ammunition Can, and Wirebound Box. The Government has already stated in Amendment 0002 of the subject Solicitation that previously approved FATs cannot be rolled-over from other Government contracts to the subject acquisition. Would the Government consider breaking out the five (5) component FATs so that if any of the component FATs could eventually be waived, it is easier to remove the cost associated with the waived component FAT?
R: The Offeror shall propose the costs for all component level First Article Tests (FATs) by completing the attached spreadsheet
(incorporated as Solicitation Attachment 0006, Proposal First Article Price Matrix, dated March 23, 2017). There are five (5) component ___________________________________ level FATs listed to include Cartridge, Link, Bandoleer, Ammunition Can, and Wirebound Box). The total price for all component level
FATs shall equal the total FAT price in both Attachment 0006 and CLIN 0001 in Section B. The Offeror shall not assume a waiver will be granted for any of the five (5) component level FATs. The total evaluated price for the Government evaluation will remain the total FAT price entered for CLIN 0001 in Section B (which should match the total FAT price in Attachment 0006) and the extended unit price for
CLIN 0002 (proposed unit price multiplied by quantity of 200,000 EA). However, the Government, at their discretion, may waive any of the five (5) component level FATs and award the required FATs as priced in Attachment 0006.
Section L under Volume II - Price Factor (page 61 of 68): Paragraph a. is hereby revised to include submission of Attachment 0006 above for the breakdown of the CLIN 0001 FAT cost. Section B CLIN 0001 has also been updated to reference Attachment 0006 as part of the CLIN
0001 unit price submission.
Q: Is the Government aware of any issues/concerns with Black Oxide scratching off?
R: The Government is not aware of any issues/concerns with Black Oxide scratching off during the manufacturing process.
4. All other terms and conditions of Solicitation W52P1J-17-R-0006 remain unchanged.
5. There is no change to the proposal receipt date/time as a result of this Amendment 0006. (NOTE: Amendment 0005 inadvertently referred to Amendment 0002 for this particular statement about no change to proposal receipt date/time. Amendment 0005 should have been referenced instead).
*** END OF NARRATIVE A0007 ***
2 8
W52P1J-17-R-0006 0006
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
0001 FIRST ARTICLE ACCEPTANCE TEST REPORT (FAATR) ____________________________________________
NOUN: FIRST ARTICLE ACCEPTANCE TEST REPORT(FAATR)
CLIN: 0001
DODIC: A159
NSN: 1305-00-926-4009
NOMENCLATURE: CRTG, 7.62MM, INERT, M172:PK 100 CRTG
Quantity________
One (1) Lot (LO)
*** UNIT PRICE SHALL BE SUBMITTED IN THIS SECTION ***
*** SEE SOLICITATION ATTACHMENT 0006, PROPOSAL FIRST _______________
ARTICLE PRICE MATRIX. THIS ATTACHMENT SHALL BE____________________
COMPLETED AND SUBMITTED AS PART OF THE CLIN 0001 UNIT
PRICE SUBMISSION ***
Delivery Schedule_________________
FAATR shall be submitted within 240 days after award.
Inspection and Acceptance_________________________
FAATR Inspection at Source / FAATR Acceptance at
Destination
See Clauses 52.209-4512, First Article Test ___________________
(Contractor Testing) and 52.209-3, First Article____________________ ______________
Approval -- Contractor Testing -- Alternate I for all_____________________________________________ requirements associated with FAAT/FAATR.
(End of narrative A001)
3 8
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION J - LIST OF ATTACHMENTS
List of Number List of Number
Addenda Title Date of Pages Transmitted By Addenda Title Date of Pages Transmitted By________________ ____________________________________________________________ _______________ ____________ _______________________________ ____________________________________________________________ _______________ ____________ _______________
Attachment 0006 PROPOSAL FIRST ARTICLE PRICE MATRIX 23-MAR-2017 001 EMAIL
4 8
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
FACTORS AND SUBFACTORS TO BE EVALUATED______________________________________
The following evaluation factors and subfactors will be used to evaluate each proposal. The Lowest Priced Technically Acceptable (LPTA) source selection determination will be based on an integrated assessment of the offeror's proposal to meet the solicitation requirements and the evaluation criteria to determine how well the proposal meets the following evaluation factors which are listed in descending order of importance.
1. Technical Factor
The Technical factor has three subfactors.
Subfactor 1: Production
Subfactor 2: Management
Subfactor 3: Quality
Each subfactor will be evaluated separately and assigned a rating of Acceptable or Unacceptable. If an offeror receives an Unacceptable in any of the three subfactors, an Unacceptable will be received for the overall Technical factor.
2. Price Factor
There are no subfactors under the Price factor. The resulting award will be a Firm-Fixed Price contract. Price reasonableness will be utilized in the evaluation of the Price factor.
PROPOSAL SUBMISSION____________________
1. Introduction
a. The offeror's proposal shall be submitted in digital format as set forth below.
Proposals shall be submitted to:
Army Contracting Command - Rock Island
CCRC-AF
Attn: Mark D. Stevens
3055 Rodman Avenue Bldg. 60, 3rd Floor
Rock Island, IL 61299-8000
b. Offerors are cautioned that "parroting" of the technical requirements with a statement of intent to perform does not reflect an understanding of the requirement or capability to perform. Each offeror is responsible for including concise and sufficient details
(e.g., drawings, test data, etc.) to permit a complete and accurate evaluation of the proposal. All information shall be confined to the appropriate volume/factor/subfactor. The Government will not assume the duty to search for data or information to cure problems it finds in a proposal. The burden of providing complete and thorough information, to address the factors, subfactors, and elements below, remains with the offeror. Any proposal that does not contain the information requested risks being determined Unacceptable by the
Government. Proprietary information shall be clearly marked. Files shall not contain classified data.
c. The Government intends to evaluate proposals and award a contract without discussions with offerors (except clarifications as described in FAR 15.306(a)). The Government reserves the right to conduct discussions if the Cognizant Contracting Officer later determines them to be necessary. Therefore, the offeror's initial proposal should contain the offeror's best terms in response to this solicitation.
2. Proposal Submission Requirements
a. The offeror's proposal shall consist of the following three volumes submitted as follows.
Volume I: Technical Factor; Two (2) Digital Copies; Maximum of Fifty (50) Pages*
Volume II: Price Factor; Two (2) Digital Copies; No Page Limit
Voume III: Solicitation, Offer and Award Documents, Certifications/Representations; Two (2) Digital Copies; No Page Limit
* The following are excluded from the page count: volume title pages, table of contents pages, cross-referencing pages, acronym lists, page dividers (used to separate proposal parts), offeror's current Quality Manual, Letters of Commitment, Failure Mode Effect Analysis
(FMEAs), and completed Component Suppliers Template.
5 8
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
NOTE: Pages that exceed the required page limitations will not be evaluated. Additional pages over the maximum allowed will not be read and will not be evaluated by the Government.
b. Printing shall be single spaced. Each paragraph shall be separated by at least one blank line. Arial 12 pt. minimum font with one
(1) inch margins on all sides is required. Tables and illustrations may use a reduced font size no less than 8-point and may be landscape. The offeror shall include its company name and page numbers on all documents of its proposal.
c. The submission shall be clearly indexed and logically assembled. Each volume shall have a table of contents which contains narrative titles and page numbers. Each volume shall be clearly identified and shall begin at the top of a page. All pages of each volume shall be appropriately numbered and identified by the complete company name, date and RFP number in the header and/or footer.
Files shall use the following page setup parameters.
Top, Bottom, Left, Right Margins: 1"
Gutter: 0"
Header and Footer from Edge: 0.5"
Page Size, Width: 8.5"
Page Size, Height: 11 "
NOTE: 11x17 folded pages are acceptable for tables/graphic representations; however, each 11x17 page counts as two pages.
d. The number of digital copies is detailed above in paragraph 2.a. The digital copies shall be submitted on Digital Video Disc (DVD) and shall be formatted for an International Business Machine compatible computer. Files shall be provided in read only format using
Portable Document Format (.pdf) format. All price breakdown information to aide in the Price evaluation shall be submitted in Microsoft
Office Excel 2013 Compatible Read/Write format. Self-extracting exe files are not acceptable. The use of hyperlinks in proposals is prohibited. Only one volume shall be included per DVD. Each disc shall be externally labeled with the volume number, date, and the offerors name.
3. Volume Organization
Volumes I through III shall be organized into the sections as detailed below.
Volume I - Technical Factor___________________________
The offeror shall include sufficient information to complete an accurate evaluation from a technical standpoint. The offeror shall provide a detailed narrative that addresses each subfactor and element as described below.
The following subfactors are included in the Technical factor.
Factor 1: Technical Factor - Subfactor 1: Production____________________________________________________
The offeror's proposal shall contain detailed evidence that demonstrates the offeror's capability and capacity to produce according to the requirements of the solicitation. Offeror's proposal shall provide a detailed manufacturing plan, which shall clearly demonstrate the ability to produce 200,000 EA M172 Cartridges and the capability to meet the requirements of the solicitation. This includes, but is not limited to, the offeror providing a description of the proposed facilities, equipment, specifications / standards, processes and process controls, and the essential skills necessary to produce and deliver a quality M172 Cartridge. The offeror's manufacturing plan shall include an operational flow chart and a description of each operation and procedure that details how the M172 Cartridge will be produced. The offeror's plan shall identify any process/part that is manufactured or procured from a subcontractor. All subcontracted work shall be discussed by the offeror at the same level of detail as the in-house production.
The proposal shall include:
a. Information that would demonstrate the offeror's understanding of the drawing and specification requirements, and technical expertise in the areas of manufacturing processes pertinent to the production of the M172 Cartridge. The offeror shall identify personnel required, with a description of abilities and assigned duties and responsibilities. The training program should also be described by the offeror along with certifications as required.
b. Detailed information on the materials that will be used by the offeror during the manufacturing of the M172 Cartridge. Information shall include specifications, material property certification information, along with procurement, receipt, and storage plans.
c. Details demonstrating an in-depth understanding of the black oxide coating process, as it pertains to the application onto copper alloys/cartridge brass, including, but not limited to:
i. Surface preparation of cartridge/components.
ii. Chemical or electrochemical treatment.
6 8
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
iii. Rinsing operation process.
iv. Method for testing coating thickness.
v. Method for testing coating adhesion.
vi. Periodic test plan for cleaning and processing solution.
d. Any other details necessary for the offeror to meet the requirements of MIL-A-2550, ASME Y14.5-2009, MIL-DTL-60573A, and associated drawings.
e. Information regarding metal component forming processes including, but not limited to, machining, forming, extrusion, and stamping.
f. Detailed information on the offeror's proposed facilities, gages, and equipment which will be utilized for the testing and verification of M172 Cartridge production. This shall include, but is not limited to, information on the facilities and equipment necessary to perform dimensional inspections, destructive or non-destructive testing, First Article Testing (FAT), and Lot Acceptance
Testing (or LAT). All subcontracted work shall be discussed by the offeror at the same level of detail as the in-house production.
Factor 1: Technical Factor - Subfactor 2: Management____________________________________________________
The offeror's proposal shall provide detailed evidence that demonstrates its ability to effectively plan, schedule and manage the production, as well as, execute an acceptable supply chain management system to include their suppliers/subcontractors to the level delineated in RFP W52P1J-17-R-0006, Section J, Attachment 0001 (Component Suppliers Template), to ensure all solicitation requirements are met. The proposal shall also contain the following:
a. Configuration Management: The offeror shall provide a description of how changes to the Government Technical Data Package (or TDP) will be tracked until implementation and then documented during the life of the contract. This description shall also include how the offeror would make recommendations to the Government in the form of Engineering Change Proposals (or ECPs) and/or Request for Variances
(or RFVs).
b. Supply Chain Management Plan: The offeror shall submit a detailed supply chain management plan that demonstrates compliance with the contract requirements with respect to the total quantity and the ability to obtain material and components. The offeror's supply chain management plan shall list the item (e.g., component, material, etc.) and whether the offeror will be procuring that item from a subcontractor or manufacturing in-house, supplier(s), source location(s), manufacturer(s), and locations of manufacture (if different than supplier/source location(s)). The offerors supply chain management plan shall also include a detailed plan that addresses the production or supplier capacity for meeting the production quantity as well as:
i. Letters of commitment from each supplier/source and for any additional parties identified within the supply chain. The offeror shall submit these letters for each supplier within the supply chain. Letters of commitment from supplier/source shall include: name and address of the company providing the commitment, solicitation number, item of commitment, quantity of item, production schedule/rate/capacity/availability of each item, length of commitment, and signature of individual from supplier/source that is authorized to bind the company and demonstrates a firm commitment.
ii. The offeror shall provide a detailed breakdown for the M172 Cartridge to the level delineated in RFP W52P1J-17-R-0006, Section J, Attachment 0001 (Component Suppliers Template). The offeror shall provide the following information within this attachment: supplier, supplier capacity, supplier capacity dedicated to M172 Cartridge production, components/subcomponents that will be manufactured in-house, and the date on the letter of commitment for the delivery of each product and subcomponent.
Factor 1: Technical Factor Subfactor 3: Quality________________________________________________
The offeror shall provide detailed evidence that demonstrates the offeror has a Quality Management System (QMS) in place, along with their plans to control material flow, ensure proper and complete failure analysis procedures, and ensure that all required testing assets are available to enable the offeror to produce a quality product in accordance with the requirements of the solicitation. The proposal shall include the following:
a. Quality Management Approach. The offeror shall include a description detailing the effectiveness and suitability of their QMS, including their quality assurance plan to determine the offerors ability to meet applicable contract quality requirements.
b. Material Control System. The offeror shall submit a detailed description of their material control system including Statistical
Process Control (or SPC), the tools and plans the offeror will use to maintain control of its material system (to include raw materials through delivery), through all stages of production and acceptance, and how the offeror identifies, tracks and segregates non-conforming material. The offeror's proposal shall include a description for implementing and maintaining a material control system at its suppliers and formal follow-up process to ensure information is received, understood, and appropriately implemented in a timely basis, as well as identification of any initiatives to be used to minimize quality problems.
c. Failure Analysis. The offeror shall submit a detailed description of their methodology for conducting failure analysis in the event of product deficiencies and test failures. The offeror shall describe how they will document and provide completed failure analyses to the Government. The offeror shall submit two examples (one product and one process) of a Failure Mode Effect Analysis (or FMEA) of a
7 8
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
small caliber cartridge production defect.
Volume II - Price Factor________________________
a. The offeror will enter unit prices in Section B of the RFP for Contract Line Item Number (CLIN) 0002 for the quantity of 200,000 EA
M172 Cartridges and CLIN 0001 for the FAT. Offeror shall include Attachment 0006 (Proposal First Article Price Matrix) as part of the submission for CLIN 0001 pricing. All unit prices will be limited to two decimal places and will be binding.
b. The Government reserves the right to require the submission of any data necessary to validate the reasonableness of an offer.
Volume III Solicitation, Offer, and Award__________________________________________
The offeror shall submit a signed and completed copy of the Standard Form 33 (SF 33) and continuation sheets (Sections A through M).
The SF33 shall be signed by a person authorized to enter into the proposed contract on behalf of the offeror. Continuation sheets are to be filled in as directed, e.g., any fill-ins required, Certifications and Representations in Section K, etc. The subcontracting plan, if other than a small business, shall be submitted in this volume.
*** END OF NARRATIVE L0001 ***