W52P1J17R0006-0005.pdf

PDF 14 KB Posted

Attached to
7. 62mm M172 Inert Cartridges
Solicitation number
W52P1J-17-R-0006
Issued by

About this file

RFP W52P1J-17-R-0006 Amendment 5

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of

2. Amendment/Modification No.

3. Effective Date

4. Requisition/Purchase Req No.

5. Project No. (If applicable)

6. Issued By Code 7. Administered By (If other than Item 6) Code

8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code)

9A. Amendment Of Solicitation No.

9B. Dated (See Item 11)

10A. Modification Of Contract/Order No.

10B. Dated (See Item 13) Code Facility Code

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. Accounting And Appropriation Data (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS

It Modifies The Contract/Order No. As Described In Item 14.

A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In

The Contract/Order No. In Item 10A.

B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set

Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).

C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:

D. Other (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.

14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. Name And Title Of Signer (Type or print)

16A. Name And Title Of Contracting Officer (Type or print)

15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed

By (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITIONS UNUSABLE

30-105-02 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

SEE SCHEDULE

X

Firm Fixed Price

0005 2017MAR22

W52P1J

ARMY CONTRACTING COMMAND - RI

ROCK ISLAND, IL 61299-8000

BLDGS 60 & 62

MARK D. STEVENS

EMAIL: MARK.D.STEVENS.CIV@MAIL.MIL

W52P1J-17-R-0006

2017FEB10

X

X

/SIGNED/

2 signed

SEE SECOND PAGE FOR DESCRIPTION

1 3

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION A - SUPPLEMENTAL INFORMATION

Buyer Name: MARK D. STEVENS

Buyer Office Symbol/Telephone Number: CCRC-AF/(309)782-2082

Type of Contract 1: Firm Fixed Price

Kind of Contract: Supply Contracts and Priced Orders

*** End of Narrative A0000 ***

1. The purpose of this Amendment 0005 to Solicitation W52P1J-17-R-0006 is to provide Government responses to Contractor questions regarding various requirements contained in the subject Solicitation. These are above and beyond the questions and answers provided in

Amendment 0002.

2. The Contractor questions (Q) and Government responses (R) are grouped into two categories; General Solicitation and Technical.

3. General Solicitation Questions ______________________________

Q: Reference Page 60 of 68, Factor 1: Technical Factor - Subfactor 2: Management. Paragraph b. ii. states the Offeror should include

"...the date on the letter of commitment for the delivery of each product and subcomponent." Since these dates will now be sometime after submittal (see Amendment 0002), and not known at time of submittal, should this requirement now be removed?

R: The Offeror does not have to include dates on the letters of commitment.

4. Technical Questions ___________________

Q: Reference MIL-STD-1168C question from Amendment 0002 regarding lot numbering. Does this mean that the cartridge case, bullet, and link do not require MIL-STD-1168C lot numbering? If this information is included on the Ammo Data Card (ADC), would this not be required?

R: The cartrige case, bullet, and link do require MIL-STD-1168C style lot numbering as per Section 3.2.7 (Component lot number). If this information is included on the ADC, the MIL-STD-1168C lot numbering will still be required for all components and cartridge lots.

Q: Reference Critical defect questions from Amendment 0002. Please confirm as long as there is no primer present, there is no Critical defect?

R: The Government accepts the inspection of the primer as the inspection method for Critical defects. However, consider the course of action if a combat round was found with propellant and no primer.

Q: Reference Critical defect questions from Amendment 0002. If there was a primed case present in the manufacturing process; however, it was detected and removed prior to the product being packed into the carton, was there an escape in the process?

R: It depends on where the Designated Point of Inspection (DPoI) for 100% Critical defects is located. If a Critical is found after the

DPoI, at or after packing, then it will be considered an escapement.

Q: Reference Critical defect questions from Amendment 0002. If a 7.62mm x 51 cartridge was found at Lot Acceptance Test (LAT) that was black oxide coated, no primer; however, with a different headstamp, what would this be considered?

R: If a 7.62mm x 51 cartridge was found at LAT that was black oxide coated, no primer; however, with a different headstamp, this would be considered a Major defect (in accordance with MIL-DTL-60573A Table V Major 102 and MIL-STD-636A Case Section Number 18).

Q: Reference Cartridge Weight questions from Amendment 0002. The Revision P of Drawing Number 10522688 does not have the 362-385 grains weight on the drawing. Also, the Inspection version Revision C appears to be missing from the Technical Data Package Listing (TDPL).

R: Revision P of Drawing Number 10522688 has the 362-385 grains weight on the drawing. Check the Unit Weight on Drawing Number 10522688 in Zone A1 (385-23 Grains). The Inspection version Revision C (Inspection Equipment List Number 10522688) was included in the TDPL

("07.pdf" in the downloadable file located: 10542365-4A5A15KZM2.zip\4A5A15KZM2_00\IMAGES\00\00 8654165).

Q: Reference Profile Gage questions from Amendment 0002. Drawing Numbers 8648501 and 8654165 referenced in the Government response do not appear to be in the Technical Data Package Listing. Can the Government claify the location in the TDPL and re-supply the drawings?

R: The Profile Gage drawing is located on the M172 Inspection Equipment List. The Profile Gage that needs to be used is from the Gaging

Inspection Equipment List (Drawing Number 8654165). The Gaging Inspection Equipment List contains the Profile Gage Drawing Number

8648501 (Gage, Receiver, Profile and Alignment, 7.62mm Cartridge). These two drawings were not contained in the TDPL and downloadable

TDP. The TDPL and downloadable TDP have been updated to include the two drawings and will be posted to the FBO website for access.

5. All other terms and conditions of Solicitation W52P1J-17-R-0006 remain unchanged.

6. There is no change to the proposal receipt date/time as a result of this Amedment 0002.

2 3

W52P1J-17-R-0006 0005

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

*** END OF NARRATIVE A0006 ***

3 3

W52P1J-17-R-0006 0005

SECTION A

File details come from the government source that posted it. Updated .