QUESTIONS and ANSWERS 23 FEB 2024.pdf
PDF 166 KB Posted
- Attached to
- SCAFFOLDING SERVICES (BREMERTON & SAN DIEGO)
- Solicitation number
- W51AA124Q0044
- Issued by
-
Department of the Army
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0001_SF30.pdf | ||
| Attachment 1 - PWS_CVN-68_v2.pdf | ||
| Attachment 2 - PWS_LHD-8_v2.pdf | ||
| W51AA124Q0044.pdf | ||
| Attachment 2 - PWS_LHD-8.pdf | ||
| Attachment 1 - PWS_CVN-68.pdf | ||
| TE 2_A1-49349D.pdf | ||
| TE 1_A1-49348D.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W51AA1-24-Q-0044
Scaffolding (Sea Sparrow) CVN-68 / LHD-8
(RFQ Ques�on and Answers)
Q: Is it possible for a site visit to perform scaffolding services in San Diego? How should one go about reques�ng one?
A: CVN-68 is in Bremerton WA not San Diego, Ca.
We do not have personnel sta�oned at that naval base in San Diego. The contractor would have to coordinate with the port engineer responsible for that ship as well as have the proper security clearance to gain entry for an unsupervised visit.
The PWS under Clinn 0001 page 2 of 6 (i) states “ Heat ventilated into the enclosures is required to maintain a 60-degree temperature. Heater source needs to be positioned a minimum of 20ft from the enclosure.”
Q: (a) Is the scaffold KTR expected to provide these heater/s? (currently the “objec�ve” appears to be strictly pertaining to access scaffold and containment) (b) If the answer is “yes” for ques�on (a) will the government be providing the electrical power at/near the loca�on to support the equipment?
A: The government can provide power as long as the contractors provides heater power requirements to the government so the ship can coordinate.
Q: Will the government be providing the crane and rig services needed to load the equipment on/off the ship (the PWS is absent of language to this extent)
A: Port crane and li�ing services will be at the port but the contractor will need to coordinate with the onsite crane and li�ing services.
File details come from the government source that posted it. Updated .