Amendment 0001_SF30.pdf

PDF 142 KB Posted

Attached to
SCAFFOLDING SERVICES (BREMERTON & SAN DIEGO)
Solicitation number
W51AA124Q0044
Issued by

About this file

This modification amends the solicitation for scaffolding services at two Navy locations. The Performance Work Statements for Carrier Vessel Nuclear 68 in Bremerton, Washington and Landing Helicopter Dock 8 in San Diego, California have been replaced with updated versions. The start dates for period of performance at each location remain as March 1, 2024 for CVN-68 and April 5, 2024 for LHD-8. The solicitation may result in multiple awards for scaffolding services to support maintenance and repair activities. Responses are due via email to the point of contact listed by the Department of the Army no later than the amended date.

View the file

Other files

File Type Posted
QUESTIONS and ANSWERS 23 FEB 2024.pdf PDF
Attachment 1 - PWS_CVN-68_v2.pdf PDF
Attachment 2 - PWS_LHD-8_v2.pdf PDF
W51AA124Q0044.pdf PDF
Attachment 2 - PWS_LHD-8.pdf PDF
Attachment 1 - PWS_CVN-68.pdf PDF
TE 2_A1-49349D.pdf PDF
TE 1_A1-49348D.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE SCHEDULE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to update the security section in the Performance Work Statement (PWS) for both CLINs.

As a result:

Attachment 1 – PWS_CVN-68 is replaced by Attachment 1 - PWS_CVN-68_v2 Attachment 2 – PWS_LHD-8 is replaced by Attachment 2 - PWS_LHD-8_v2

See follow ing pages for Addendum revision.

All other items, terms, and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 22-Feb-2024

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W51AA124Q0044

X 9B. DATED (SEE ITEM 11)

21-Feb-2024

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

22-Feb-2024

CODE

ACC-APG TOBYHANNA DIVISION

11 HAP ARNOLD BLVD

TOBYHANNA PA 18466

W51AA1 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W51AA124Q0044

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

(End of Summary of Changes)

The following items are applicable to this modification:

SECTION SF 1449 - CONTINUATION SHEET

ADDENDUM REVISION

AMENDMENT 1

Paragraph 2 of the Addendum (Instructions to Offerors) is hereby replaced by:

2. RFQ ATTACHMENTS: The following list of documents, though not physically attached to this SF1449 document, are hereby incorporated as part of this RFQ and resultant award(s), as applicable.

Attachment 1 – PWS_CVN-68_v2 (Performance Work Statement for CLIN 0001) Attachment 2 – PWS_LHD-8_v2 (Performance Work Statement for CLIN 0002) TE 1 – A1-49348D (Technical Exhibit 1 – Applies to both PWSs/CLINs)) TE 2 – A1-49349D (Technical Exhibit 2 – Applies to both PWSs/CLINs))

File details come from the government source that posted it. Updated .