(Attachment 1)OSRP SOW CVN 68.pdf

PDF 303 KB Posted

Attached to
Scaffolding Services Federal contract opportunity
Solicitation number
W51AA124Q0041
Issued by
Department of the Army

About this file

This statement of work outlines the requirements for providing life-cycle maintenance support for the Rolling Airframe Missile on-ship refurbishment program on CVN 68. The contractor shall secure, disassemble, clean, sand, prime, and overcoat the RAM guided missile launcher and accessible areas of the launcher foundation on a level-of-effort basis. The document specifies preparation and coating procedures in accordance with WS 33226D for fiberglass, aluminum, steel and non-slip areas. This includes requirements for solvent cleaning, abrasive blasting, hand tool cleaning, power tool cleaning, application of pretreatment, primer and topcoat, and inspection steps. Adherence to specifications such as SSPC, ASTM and MIL standards is required.

View the file

Other files for this federal contract opportunity

Other files attached to Scaffolding Services, newest first.
File Type Posted
W51AA124Q00410002.pdf PDF
W51AA124Q00410001.pdf PDF
(Attachment 3) Scaffolding Requirements CVN 68 .pptx PPTX presentation
(Attachment 2) SCAFFOLDING FRAME CVN 68.pdf PDF
(Attachment 5) Scaffolding Requirememts LPD 24_ LPD 23.pptx PPTX presentation
W51AA124Q0041.pdf PDF
(Attachment 4) SCAFFOLDING FRAME LPD 24_LPD 23.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

FOR THE

ON-SHIP REFURBISHMENT PROGRAM (OSRP)

1. PURPOSE

The Contractor shall provide Life-Cycle maintenance support for the Rolling Airframe

Missile (RAM) On-Ship Refurbishment Program (OSRP) on a level of effort basis. OSRP tasking applies to the Guided Missile Launcher (GML), Unit 4, and LSMU of the RAM Guided Missile Launching System (GMLS) and the accessible areas of the Launcher Foundation. All other GMLS associated units are not included in the scope of OSRP.

2. SCOPE

This Statement of Work (SOW)sets the specific tasks required for the coating maintenance of the RAM Guided Missile Launcher (GML, Unit 4 of the Guided Missile Launcher System GMLS) and the RAM GML Barbette. This SOW specifies the procedures for the coating of the GML and the RAM GML Barbette in accordance with the production procedure/requirements of the WS 33226D. These efforts require the Contractor to secure, disassemble, clean, sand, prime bare metal, and overcoat the Launcher, LSMU and foundation.

3. REFERENCE DOCUMENTS

3.1 WS 33226D Process Specification coating, organic, weapon systems, control of.

3.2 The Society for Protective Coating – Surface Preparation Specification:

3.2.1 SSPC-SP1 Solvent Cleaning:

Remove all visible oil, grease, soil, drawing and cutting compounds, and other soluble contaminants from steel surfaces with solvent, vapor, cleaning compound, alkali, emulsifying agent, or steam.

3.2.2 SSPC-SP2 Hand Tool Cleaning (ISO 8501-1, St2 or St3):

Removal of all rust scale, mill scale, loose rust and loose paint to the degree specified by hand wire brushing, hand sanding, hand scraping, hand chipping or other hand impact tools or by a combination of these methods. The substrate should have faint metallic sheen and also be free of oil, grease, dust, soil, salts and other contaminates.

3.2.3 SSPC-S10/ NACE2 Near-White Blast Cleaning (ISO 8501-1, Sa 2 1/2):

When viewed without magnification, the surface shall be free of all visible oil, grease, dust, dirt, mill scale, rust, coating, oxides, corrosion products and other foreign matter of at least 95% of each unit area. Staining shall be limited to no more than 5 percent of each unit area, and my consist of light shadows, slight streaks, or minor discolorations caused by stains of rust, stains of mill scale, or stains of previously applied coatings. Unit area shall be approximately 3 in. x 3 in. (9 sq. in.).

Caution:

Blasted surface metal must be degreased following walnut shell blasting. Even traces of residual oil will degrade paint adhesion. Appropriate safety precautions for working with flammable solvents must be enforced. Alternate procedure is a vigorous soap and water wash followed by pressurized fresh water rinse. Do not use a detergent and fresh water wash-down when using aluminum oxide as an abrasive blast medium.

3.2.4 SSPC-S11 Power Tool Cleaning to bare metal:

When viewed without magnification, the surface shall be free of all visible oil, grease, dirt, dust, mill scale, rust, paint, oxides, corrosion products, and other foreign matter.

Slight residues of rust and paint may be left in the lower portion of pits if the original surface is pitted. The surface profile shall not be less than 1 mil (25 microns).

3.3 NAVSEA ITEM NO: 009-32 FY-16 or newer

3.4 MIL-DTL-24441 Epoxy-Polyamide Coating System

3.5 MIL-DTL-24441/20 Green Primer Epoxy-Polyamide Paint Formula 150

3.6 MIL-PRF-24635 Coating System, Weather-Resistant, Exterior Use

3.7 MIL-PRF-24647 Paint System, Anticorrosive and Antifouling, Ship Hull

3.8 CID A-A-59166 Walkway Compound, Nonslip, and walkway mating Type II

3.9 MRC U-E4 Touch-Up Launcher, Mk19 Loader and Mk 406 LOTA Paint

3.10 MIL-PRF-23236 Coating Systems for ship structures

3.11 29 CFR 1915, Occupational Safety and Health Standards for Shipyard Employment, Subparts C and Z

All documents and specifications have to be in the newest version.

4. MATERIALS

4.1 Primer/Paint

4.1.1 Epoxy coating kit, MIL-DTL-24441/20 Type III 150 Formula, Green Primer, Hazardous Material User’s Guide (HMUG) Group 12, Disposal Method 1

4.1.2 MIL-PRF-24635, Type V or VI, Class 2, Grade B, Polysiloxane, Color 26270 LSA Haze Gray

4.1.3 MIL-PRF-24635 , Type V or VI, Class 2, Grade B, Polysiloxane, Color 26373 LSA Light Gray

4.1.4 MIL-PRF-23236, Type V or VI, Class 5 or 7, Grade A to D (depends on the environmental conditions)

4.1.5 Non-slip coating CID A-A-59166 Type II, 26270 LSA Haze Gray

4.1.6 Pretreating material: SurTec 650 ChromitAL TCP or Safeguard CC-6100)

4.1.7 MIL-P-85891 Type V acrylic plastic media

4.1.8 MIL-PRF-24647 Type II, Gray

Caution:

Topcoat: Only International Intergard 264 may be used with International Interfine

979SG Polysiloxane.

Primer coat shall be from the same manufacturer as the other coats in the system.

5. GENERAL REQUIREMENTS

5.1 Must be able to attain base and ship access for personnel, subcontractors and equipment to accomplish work.

5.2 Secure RAM Launchers for preservation via ship WAF (Work Authorization Form) system.

5.3 Must have experience in refurbishment of ship board weapon systems.

6. RAM GML BARBETTE

The coating maintenance for the RAM GML Barbette shall be performing according to the following tasks in section i. or ii. depending on the base material used to fabricate the barbette.

6.1 GML Barbettes fabricated from Aluminum:

Perform all tasks IAW Section 10.4 Aluminum Areas without non-slip.

6.2 GML Barbettes fabricated from Steel:

Perform all tasks IAW Section 10.5 Steel Areas without non-slip

7. GML CONDITIONS:

The In-Service GML provides different status of coatings. For that case the procedure of the GML coating is depended by the condition of the coating and from the type of painting (Type II, Type III, Type V, and Type VI). US systems will only use Type V and Type VI. As follow you will see an overview of the different steps in the different conditions.

7.1 Inspection and general preparation

7.1.1 Documentary check:

Check for the current coating Existing RAM Launcher coating system on each substrate (fiberglass, aluminum, non-slip areas and steel) to confirm the best possible corrective surface preparation and coating system for the launcher.

7.1.2 Visual check:

Check the conditions of the current coating existing RAM Launcher coating system on each substrate (fiberglass, aluminum, non-slip areas and steel) to confirm the best possible corrective surface preparation and coating system for the launcher. Factors to take into consideration are as follows.

7.1.2.1 Amount of coating failure:

7.1.2.1.1 Spot preservation is acceptable, if less than 30% of the coating failure is present on the launcher.

7.1.2.1.2 Full coating removal would be recommended if more than 30% coating failure is present on the launcher.

7.1.2.2 Location and severity of the corrosion:

7.1.2.2.1 Location: RAM Launchers are located on various parts of each class vessel which expose it to various types of conditions (excessive heat, wind, salt water, etc. …).

7.1.2.2.2 Assessing the severity of the existing corrosion (minor spot corrosion or severe corrosion).

7.1.2.3 Determine the proper coating system:

7.1.2.3.1 Since the new coating system (Polysiloxane) meeting MIL- PRF-24635E, Type V / VI, Class 2, Grade B can be applied directly over certain epoxy primer coats or existing Type II or III LSA Coatings, the above factors all play a role on applying a single coat of Polysiloxane or if an epoxy primer is necessary.

7.1.2.4 Determine the proper surface preparation for the coating system:

7.1.2.4.1 See following paragraphs.

Note:

Experience has shown that brushing and rolling application methods will not produce an adequate surface finish.

8. GENERAL ISSUES / GENERAL PREPARATIONS / PRELIMINARY

REQUIREMENTS

8.1 Containment

Erect scaffolding and containment around the RAM Launcher in order to protect from the weather and prevent overspray damage to surrounding areas. See Attachment A.

8.2 Facilities

Make sure that all the facilities are secure and safe for the preparation and coating procedure.

8.3 Environmental

Make sure that the environmental situation is optimized for the further steps. The dry time of the primers and coatings increases with lower temperature. A good primer and coating needs a good surface preparation and a clean surface. It is difficult or impossible to provide a clean surface in a dirty environment.

8.4 Non-Painting of all RAM/RCMS/PCMS material

Mask all areas of RAM/RCMS/PCMS material to ensure to be free of primer and paint/coat prior to performing preparation and painting operations. Ensure all areas of RAM/RCMS/PCMS are not damaged or removed and are not coated.

8.5 Safety

Accomplish safety precautions as specified in the 29 CFR 1915, Occupational Safety and Health Standards for Shipyard Employment, Subparts C and Z or other national/government safety regulations/Work Items or task order during surface preparation and the application or removal of marine paints. All hazards materials have to be used AW the manufacturer requirements.

9. MATERIALS, METHODS AND PROCESSES

Ensure thorough mixing of paints and primer pre manufacturer specifications. Also ensure proper cure times and overcoat times are adhered per manufacturer specifications. Unless otherwise specified, all materials, methods and processes shall conform to industry standard practices and the requirements specified on the applicable drawing or manufacturer specifications.

10. TYPE V/VI COATING

10.1 Non-Slip Areas Aluminum

Figure 1: Non-Slip/Walkway Compound Application

10.1.1 Preparation/Cleaning

10.1.1.1 Accomplish SSPC-SP1 Solvent Cleaning IAW SSPC-SP10.

10.1.1.2 Accomplish SSPC-SP10 Near White Metal Blast to remove 100% of the non-slip.

10.1.1.3 Accomplish SSPC-SP1 Solvent Cleaning IAW SSPC-SP10. Let the surface dry.

Steel shot, steel grit, and SSPC-AB 4 media containing steel abrasive shall not be used for non-slip/-skid surface preparation on LHA, LHD, LPD, and LSD Class ships.

10.1.2 Pretreatment for bare aluminum

The pretreatment increase the coating adhesion significantly (over 200%) and is recommended.

10.1.2.1 Prior to the pretreatment of the aluminum surface must be cleaned and deoxidized thoroughly. The surface must be water-break free.

10.1.2.2 Apply pretreatment product to all bare metal areas (e.g. SurTec 650 ChromitAL TCP or Safeguard CC-6100) IAW to the manufacturer requirements/introductions.

10.1.3 Primer/Painting Non-Slip

10.1.3.1 For Areas that are difficult to access for sanding operation, a mist coat of primer (.0005” - .001”/0.013 – 0.025mm) is needed. (e.g. Guide Assembly side support plates, LSMU).

10.1.3.2 If non-slip was removed apply proprietary non-slip Primer MIL- PRF-23236 Type V or VI, Class 5 or 7, 4-8 Mils DFT to the bare/prepared metal (aluminum). Let the primer dry IAW the manufacturer requirements. Do not coat before the primer is ready to be over coated.

10.1.3.3 Apply a stripe coat for all welds, edges etc.: Non-slip Primer MIL- PRF-23236 Type V or VI, Class 5 or 7, 4-8 Mils DFT. Let the primer dry IAW the manufacturer requirements. Do not coat before the primer is ready to be over coated.

10.1.3.4 Apply a coat of Non-slip coating CID A-A-59166 Type II Color 26270 LSA Haze Gray 5-8 Mils DFT. Let the coat dry IAW the manufacturer requirements. Let the coat dry IAW the manufacturer requirements.

10.2 Non-Slip Areas Steel

10.2.1 Preparation/Cleaning

10.2.1.1 Accomplish SSPC-SP1 Solvent Cleaning IAW SSPC-SP10.

10.2.1.2 Accomplish SSPC-SP10 Near White Metal Blast to remove 100% of the non-slip.

10.2.1.3 Accomplish SSPC-SP1 Solvent Cleaning IAW SSPC-SP10. Let the surface dry.

10.2.2 Primer/Painting

10.2.2.1 For Areas that are difficult to access for sanding operation, a mist coat of primer (.0005” - .001”/0.013 – 0.025mm) is needed. (e.g. Guide Assembly side support plates, LSMU).

10.2.2.2 If non-slip was removed apply proprietary non-slip Primer MIL- PRF-23236 Type V or VI, Class 5 or 7, 4-8 Mils DFT to the bare metal (steel). Let the primer dry IAW the manufacturer requirements. Do not coat before the primer is ready to be over coated.

10.2.2.3 .Apply a stripe coat for all welds, edges etc.: Non-slip Primer MIL- PRF-23236 Type V or VI, Class 5 or 7, 4-8 Mils DFT Let the primer dry IAW the manufacturer requirements. Do not coat before the primer is ready to be over coated.

10.2.2.4 Apply a coat of Non-slip coating CID A-A-59166 Type II Color 26270 LSA Haze Gray 5-8 Mils DFT. Let the coat dry IAW the manufacturer

10.3 Fiberglass Areas

10.3.1 Preparation

10.3.1.1 Remove existing topcoat by: a) light abrasive blasting with Sponge- Jet system using White Plastic Sponge, dry abrasive media using a MIL-P- 85891 Type V acrylic plastic media, color (white or light grey), dry starch abrasive media, or walnut shell media, - or – b) hand sanding, - or – c) pneumatic tool sanding.

10.3.1.2 Accomplish SSPC-SP1 Solvent Cleaning.

10.3.1.3 Verify the primer of defective of damaging areas. If the primer is intact measure the high of the primer go forward to step 10.3.2.1 and ensure that the primer high fulfilled.

10.3.1.4 If primer is defective, remove defective primer by followed by accomplish SSPC-SP 11 as well without damaging fiberglass substrate. If most of the primer is defective, remove all primer by accomplish SSPC-SP10 without damaging fiberglass substrate.

10.3.1.5 Verify the fiberglass substrate of defective or damaging areas and replace them.

10.3.1.6 Accomplish SSPC-SP1 Solvent Cleaning IAW SSPC-SP10 or SSPC-SP11. Let the surface dry.

10.3.2 Primer/Painting

10.3.2.1 Apply (ensure) one coat primer MIL-PRF-23236 Primer, Type V or VI, Class 5 or 7, 4 to 6 Mils DFT. Let the primer dry IAW the manufacturer requirements. Do not coat before the primer is ready to be over coated.

10.3.2.2 Apply topcoat Polysiloxane, MIL-PRF-24635, Type V or Type VI, Class 2, Grade B, 2 to 3 Mils DFT. Let the coat dry IAW the manufacturer requirements.

10.3.2.3 Use 26373 LSA Light Gray for top and slants areas.

10.3.2.4 Use 26270 LSA Haze Gray for all areas without top and slants areas.

10.4 Aluminum Areas without non-slip

10.4.1 Preparation

10.4.1.1 Intact Primer

10.4.1.1.1 Accomplish SSPC-SP1 Solvent Cleaning IAW SSPC-

SP2.

10.4.1.1.2 Accomplish SSPC-SP2: Hand tool cleaning. Try to avoid removing intact primer and exposing the aluminum substrate.

10.4.1.1.3 Accomplish SSPC-SP1 Solvent Cleaning. Let the surface dry.

10.4.1.2 Partly primer damage / Spot preservation

10.4.1.2.1 Remove existing topcoat.

10.4.1.2.2 Accomplish SSPC-SP1 Solvent Cleaning the

affected/damaged areas.

10.4.1.2.3 Accomplish SSPC-SP11 Power tool cleaning the

affected/damaged areas without damaging intact primer.

10.4.1.2.4 Inaccessible areas will be prepared/accomplish to SSPC- SP2 Hand Tool Cleaning.

10.4.1.2.5 Accomplished SSPC-SP1 Solvent Cleaning. Let the

surface dry.

10.4.1.3 Completed recoating at bad conditions

10.4.1.3.1 Accomplish SSPC-SP1 Solvent Cleaning IAW SSPC-

SP10.

10.4.1.3.2 Accomplish SSPC-SP10 Near-White Blast Cleaning.

10.4.1.3.3 Accomplish SSPC-SP1 Solvent Cleaning IAW SSPC-

SP10. Let the surface dry.

10.4.2 Pretreatment for bare aluminum

The pretreatment increase the coating adhesion significantly (over 200%) and is recommended.

10.4.2.1 Prior to the pretreatment of the aluminum surface must be cleaned and deoxidized thoroughly. The surface must be water-break free.

10.4.2.2 Apply pretreatment product to all bare metal areas (e.g. SurTec 650 ChromitAL TCP or Safeguard CC-6100) IAW to the manufacturer equirements/introductions.

10.4.3 Primer/Painting

10.4.3.1 None complete recoating preparation: For areas that are difficult to access for sanding operation, a mist coat of primer (.0005” - .001”/0.013 – 0.025mm) is needed. (e.g. Guide Assembly side support plates, LSMU).

10.4.3.2 Apply one stripe coat epoxy base MIL-PRF-23236 Primer, Type V or VI, Class 5 or 7, 4 to 8 Mils DFT –or– one stripe coat MIL-PRF-24635, Type V or VI, Class 2, Grade B, 5-8 Mils DFT Deck Gray. Let the primer dry IAW the manufacturer requirements. Do not coat before the primer is ready to be over coated.

10.4.3.3 Apply coating Polysiloxane, MIL-PRF-24635E, Type V or Type VI, Class 2, Grade B, 5 to 8 Mils DFT. Let the coat dry IAW the manufacturer

10.4.3.4 Use 26270 LSA Haze Gray.

10.5 Steel Areas without non-slip

10.5.1 Preparation

10.5.1.1 Intact Primer of Type V/VI MIL-PRF-24635 coating

10.5.1.1.1 Accomplish SSPC-SP1 Solvent Cleaning IAW SSPC-

SP2.

10.5.1.1.2 Accomplish SSPC-SP2 Hand tool cleaning.

10.5.1.1.3 Accomplish SSPC-SP1 Solvent Cleaning. Let the surface dry.

10.5.1.2 Partly primer damage of Type V/VI MIL-PRF-24635 coating / Spot preservation

10.5.1.2.1 Accomplish SSPC-SP1 Solvent Cleaning IAW SSPC-

SP11.

10.5.1.2.2 Accomplish SSPC-SP11 Power tool cleaning.

10.5.1.2.3 Inaccessible areas will be prepared to accomplish SSPC- SP2 Hand Tool Cleaning.

10.5.1.2.4 Accomplish SSPC-SP1 Solvent Cleaning IAW SSPC-

SP11. Let the surface dry.

10.5.1.3 Completed recoating at bad conditions or no current Type V/VI MIL-PRF-24635 coating

10.5.1.3.1 Accomplish SSPC-SP1 Solvent Cleaning IAW SSPC-

SP10.

10.5.1.3.2 Accomplish SSPC-SP10 Near-White Blast Cleaning.

10.5.1.3.3 Accomplish SSPC-SP1 Solvent Cleaning IAW SSPC-

SP10. Let the surface dry.

10.5.2 Primer/Painting

10.5.2.1 For Areas that are difficult to access for sanding operation, a mist coat of primer (.0005” - .001”/0.013 – 0.025mm) is needed. (e.g. Guide Assembly side support plates, LSMU).

10.5.2.2 Apply one coat MIL-PRF-23236 Type V or VI, Class 5 or 7, 4-8 Mils DFT. Let the primer dry IAW the manufacturer requirements. Do not coat before the primer is ready to be over coated.

10.5.2.3 Apply one stripe coat MIL-PRF-23236 Type V or VI, Class 5 or 7, 4-8 Mils DFT. Let the primer dry IAW the manufacturer requirements. Do not coat before the primer is ready to be over coated.

10.5.2.4 Apply one topcoat MIL-PRF-24635 Type V or VI, Class 2, Grade B, 5-8 Mils DFT, Haze Gray 26270 LSA. Let the coat dry IAW the manufacturer

11. INSPECTION AND ACCEPTANCE

11.1 The Government shall conduct onsite Quality Assurance (QA) with the following steps:

11.1.1 After conducting prep, clean, and mask all specified areas.

11.1.2 After applying each single coat of primer/ paint.

11.1.3 Apply Polysulfide to RAM launcher/hardware.

11.1.4 Final inspection

12. ABBREVIATIONS:

GML(S) =Guided Missile Launcher (System) IAW= In accordance with LSA= low solar absorbency Mils DFT 1 Mils DFT = 0.0254 mm NACE =National Association of Corrosion Engineers International RAM =Rolling Airframe Missile RAM/RCMS/PCMS= Radar Absorbing Material SSPC =Standard Specification for Preparation and Coating WS 33226 =Weapon Specification 33226

13. CONTRACT PERIOD OF PERFORMANCE:

TBD

ATTACHMENT A

NOTES:

1. NO PART OF THE SCAFFOLDING CAN BE ANCHORED TO THE LAUNCHER OR

FOUNDATION.

2. DIMENSION SHALL BE IN ACCORDANCE WITH HEIGHT OF THE LAUNCHER AND

SHIP DECK.

3. WORKMANSHIP SHALL FOLLOW GUIDELINE 9 OF