Solicitation - W50S8Z25BA010 Amendment 2.pdf

PDF 869 KB Posted

Attached to
ADAL Communications Bldg 210 Construction Federal contract opportunity
Solicitation number
W50S8Z25BA010
Issued by
Department of the Army Oregon Army National Guard

About this file

This is a 57-page solicitation document (W50S8Z25BA010) for the construction of ADAL Communications Building 210 at Kingsley Field ANG Base in Klamath Falls, Oregon. The project involves renovating an existing 3,428 SF single-story communications facility built in 1955 and adding 6,217 SF of new single-story space for offices, break rooms, and equipment maintenance/storage areas. The project will consolidate Communications Flight functions currently spread across multiple buildings and include a COMSEC office compliant with AT/FP requirements.

The solicitation is a 100% small business set-aside with an anticipated value between $5M-$10M, using NAICS code 236220 with a $45M size standard. Bids are due January 29, 2025 at 1:00 PM, with a mandatory pre-bid conference scheduled for January 7, 2025. The contract will require completion within 450 calendar days after notice to proceed, with performance bond required within 10 days of award. The Department of the Army Oregon National Guard will award a firm-fixed-price contract based on price and price-related factors only. A bid bond is required with proposals, and five option items are included covering items like ITEC storage racks, patio canopy, insulated metal panels, and paving work. While funds are not currently available, they are anticipated prior to award.

View the file

Other files for this federal contract opportunity

Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(See ).

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair) IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

9. FOR

INFORMATION CALL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".

SOLICITATION

1. SOLICITATION NUMBER

5. REQUISITION/PURCHASE REQUEST NUMBER

CODE

6. PROJECT NUMBER

8. ADDRESS OFFER TO

4. CONTRACT NUMBER

7. ISSUED BY

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)

11. The contractor shall begin performance within

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES", indicate within how many calendar days after award in Item 12b.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and

b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d. Offers providing less than

STANDARD FORM 1442 (REV. 12/2022)

Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

is, is not required.

local time containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.

calendar days and complete it within calendar days after receiving

a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

12b. CALENDAR DAYS

2. TYPE OF SOLICITATION

SEALED BID (IFB)

INVITATION FOR BID

NEGOTIATED (RFP)

REQUEST FOR PROPOSAL

3. DATE ISSUED PAGE OF PAGES

Created On:

15 Jan 2025, 16:13 PM Central Standard Time

AWARD (To be completed by Government)

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

OFFER (Must be fully completed by offeror)

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT

NUMBER

DATE

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)

CODE FACILITY CODE

15. TELEPHONE NUMBER (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14.)

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)

21. ITEMS ACCEPTED:

22. AMOUNT

26. ADMINISTERED BY

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)

31c. DATE

STANDARD FORM 1442 (REV. 12/2022) BACK

31b. UNITED STATES OF AMERICA

BY

31a. NAME OF CONTRACTING OFFICER (Type or print)

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30b. SIGNATURE 30c. DATE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

copies to issuing office.) Contractor agrees to furnish

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

23. ACCOUNTING AND APPROPRIATION DATA

ITEM

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED STATES

CODE AT

27. PAYMENT WILL BE MADE BY

10 U.S.C. 3204(a) ( ) 41 U.S.C. 3304(a) ( )

20b. SIGNATURE 20c. OFFER DATE

Section A - Solicitation/Contract Form

ADAL Communications Bldg 210 Construction

TABLE OF CONTENTS

SOLICITATION, OFFER, AND AWARD SF 1442 and SF 1442 BACK

SECTION A - TABLE OF CONTENTS AND NOTES

SECTION B - BID SCHEDULE

SECTION C - STATEMENT OF WORK

SECTION D - PACKAGING AND MARKING

SECTION E - INSPECTION AND ACCEPTANCE

SECTION F - DELIVERIES AND PERFORMANCE

SECTION G - CONTRACT ADMINISTRATION DATA

SECTION H - SPECIAL CONTRACT REQUIRMENTS

SECTION I - CONTRACT CLAUSES

SECTION J - LIST OF ATTACHMENTS

SECTION K - REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS

SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

Notes

1. All information relating to this IFB, including pertinent changes/amendments and information will be posted on web site: http://www.SAM.

gov.

2. Facsimile transmission of bid is not authorized. Electronic submission of bids be accepted. will/will NOT

3. All information relating to this IFB, including pertinent changes/amendments and information will be posted on web site: http://www.SAM.

gov. For security reasons, all potential offerors, plan rooms and printing companies are required to be registered in the GSA System for Award Management (SAM) database. Firms can register via the SAM internet site at . Interested bidders are https://www.sam.gov/portal/public/SAM/ required to submit their representations and certifications at the same site.

4. A complete bid package must contain the following:

(a) Offer, Standard Form (SF) 1442 front and back signed

(b) Section B Bid Schedule - all items must be priced

(c) A Bid Bond and Power of Attorney is required along with the bid on the due date. In accordance with DoD Deviation 2020- O0016, electronic signatures and electronic, mechanically-applied, or printed dates may be used and shall be considered original

The bid bond must be on a SF24 form. Rejection of a bid bond shall be in accordance with FAR 28.101-4 signatures and dates.

Noncompliance with bid guaranteere quirements.

(d) Section K, Representations and Certifications, completed and return only additional certifications found in this section In addition, the offeror must have entered current and complete data within the past year in Online Representations and Certifications at www.sam.

gov.

(a) When completing the "Offeror" portion of the SF 1442(Blocks 14 - 20), an official having the authority to contractually bind the company must sign the SF 1442 in accordance with FAR 4.102. One copy of the SF1442 is required to have an original signature.

W50S8Z25BA010

https://www.sam.gov/portal/public/SAM/

(b) All amendments to the solicitation must be acknowledged.

(c) Mark the front of the envelope with the following: "BID No. ",and the Name and Address of Bidder. See Block W50S8Z25BA010 13A of SF 1442 for required number of copies.

1. Joint Venture Requirements - Parties wishing to propose as a joint venture must submit, with the Pro Forma documents, an executed copy of the joint venture agreement. The joint venture agreement shall be executed in accordance with FAR4.102(d). Each joint venture partner shall submit evidence satisfactory to the Contracting Officer that its Board of Directors has approved its participation in the joint venture or by an instrument of similarly binding character in the case of an unincorporated entity. Offerors are reminded that to obtain an award the awardee, to include a joint venture, must be registered in the System for Award Management (SAM) database. Applicable to set-aside solicitations: Joint Ventures must meet applicable sizestandards (See FAR Subpart 19.1). Submit with the proposal any size determination for the Joint Venture entity received from the Small Business Administration. A Joint Venture where-in one party is not a small business may be referred to the Small Business Administration (IAW FAR 19.302 (b)) to determine eligibility. All questions regarding Joint Ventures must bedirected to the Small Business Administration (SBA) and not the ContractingOfficer.

A small business joint venture offeror must submit, with its offer, the representation required in paragraph (c) of FAR solicitation provision 52.212-3, Offeror Representations and Certifications-Commercial Products and Commercial Services, and paragraph (c) of FAR solicitation provision 52.219-1, Small Business Program Representations, in accordance with 52.204-8(d) and 52.212-3(b) for the following categories:

(A) Small business;

(B) Service-disabled veteran-owned smallbusiness;

(C) Women-owned small business (WOSB)under the WOSB Program;

(D) Economically disadvantaged women-ownedsmall business under the WOSB Program; or

(E) Historically underutilized businesszone small business.

W50S8Z25BA010

Section B - Supplies or Services & Prices or Costs

Additional Information/Notes

Item Supplies/Service Quantity Unit Unit Price Amount

BASE BID FOR PROJECT NUMBER

KJAQ199077

Non personal services:

Provide all plant, labor, new and current material, transportation, tools, equipment, appliances, supplies, services, permits, insurance and supervision necessary to ADD/ALTER communications facility in accordance with specs dated Septmber 2024 and drawings dated September 2024.

Product Service Code: Y1EB Pricing Arrangement: Firm Fixed Price

1 Job

Option Line Item

ITEC Storage Racks Description: Add ITEC Storage Racks as outlined in the specifications.

Product Service Code: Y1EB Pricing Arrangement: Firm Fixed Price

1 Job

Option Line Item

Patio Canopy Description: Add patio canopy as outlined in the specifications.

Product Service Code: Y1EB Pricing Arrangement: Firm Fixed Price

1 Job

Option Line Item

Insulated Metal Panel Roofing Description: Use insulated metal panel roofing as outlined in the specifications.

Product Service Code: Y1EB Pricing Arrangement: Firm Fixed Price

1 Job

Option Line Item

Insulated Metal Exterior Wall Panels Description: Use insulated metal exterior wall panels as oulined in the specifications.

Product Service Code: Y1EB Pricing Arrangement: Firm Fixed Price

1 Job

Option Line Item

Patio and ITEC Paving Description:

Pave the Patio and ITEC areas as outlined in the specifications.

Product Service Code: Y1EB Pricing Arrangement: Firm Fixed Price

1 Job

Section C - Description/Specifications/Statement of Work

STATEMENT OF WORK (SOW)

FOR

KJAQ199077 ADALCommunications B210

1.0 General:

1.1 Scope: The contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary, as defined in the plan drawings and specifications.

1.1.1 Objectives ADAL Communications B210

1.2 Background: The Communications Flight is short of space and currently located in multiple facilities, vastly impacting operations and efficiency.

The separate functions of the Communications Flight are located in Building's 210, 223, 239, and 570. Currently the Base Communications Security (COMSEC) Office, located in Building 223, can only process up to a certain level of secured material due to its location being too close to the base perimeter. A waiver request for higher security processing was denied. The current mission impact causes Kingsley Field personnel to travel to Portland (or other facilities) with higher rated COMSEC offices. This project will consolidate the main Communications functions within one facility and provides the adequate square footage for their requirements per the ANGH 32-1084. This project will include a COMSEC office incompliance with AT/FP requirements. This project will consolidate the main Communications functions within one facility and provides the adequate square footage for their requirements per the ANGH 32-1084.

1.2.1 This project seeks to renovate an existing 3,428 SF single-story communications facility constructed in 1955 and add 6,217 SF of new single-story space for offices, break rooms, and equipment maintenance/storage. The existing building's facade and roof will be replaced to match that of the additions. The project's sustainability goal is ANG Meritable per ANGETL15-01-01 and the project will pursue sustainability goals that fall within the scope and budget of the project. The facility is <10,000 SF and therefore an LCCA and Third-Party Certification (TPC) are not required per UFC 1- 200-02 Applicability Table 1-1. This is an occupied building within a secured perimeter and antiterrorism requirements of UFC 4-010-01 apply.

Codes &Standards

1.3 Upon approval and award of options, the contractor shall completework related to that option as outlined in the plans and specs.

1.4 Period ofPerformance (PoP): The Period of Performance shall be 450 Calendar days whichencompasses the required time for all options as outlined in the plans and specs.

1.5 General Information:

1.5.1 Place and Performance of Services: KingsleyField, Klamath Falls, OR 97603 The contractor shall provide services between the hours of 0630- 1700 Monday-Friday, except on recognized US holidays or when the Government facility/installation is closed due to local or national emergencies, administrative closings, or similar Government-directed facility/installation closings. Performance shall be at Communications Bldg 210. The contractor shall at all times maintain an adequate work force for the uninterrupted performance of all tasks defined within this PWS when the Government facility/installation is not closed for the above reasons. When hiring personnel, the contractor shall keep in mind that the stability and continuity of the work force are essential. Teleworking is not authorized.

1.5.1.2 Unscheduled gate closures by the Security Police may occur at any time causing all personnel entering or exiting a closed installation to experience a delay. This cannot be predicted or prevented. Contractors are not compensated for unexpected closures or delays. Vehicles operated by contractor personnel are subject to search pursuant to applicable regulations. Any moving violation of any applicable motor vehicle regulation may result in the termination of the contractor employee's installation driving privileges.

1.5.1.3 The contractor's employees shall become familiar with and obey the regulations of the installation; including fire, traffic, safety and security regulations while on the installation. Contractor employees should only enter restricted areas when required to do so and only upon prior approval. All contractor employees shall carry proper identification with them at all times and shall besubject to such checks as may be deemed necessary. The contractor shall ensure compliance with all regulations and orders of the installation, which may affect performance. The Government reserves the right to direct the removal of an employee from Government property or revoke access to Government systems for misconduct, security reasons, or any overt evidence of communicable disease. Removal of contractor employees for reasons stated above does not relieve the Contractor from responsibility for total performance of this contract.

1.5.2 Recognized Holidays: The following are recognized United States (US) holidays. The contractor will not perform services on these days:

1.5.2.1 New Year's Day: January 1st

1.5.2.2 Martin Luther King, Jr.'s Birthday

1.5.2.3 President'sDay

1.5.2.4 Memorial Day

1.5.2.5 Juneteenth National Independence Day: June 19th

1.5.2.6 Independence Day: July 4th

1.5.2.7 Labor Day

1.5.2.8 Columbus Day

1.5.2.9 Veteran's Day: November 11th

1.5.2.10 Thanksgiving Day

1.5.2.11 Christmas Day: December 25th

1.5.3 Quality Control(QC): The contractor shall develop and maintain an effective QC Plan (QCP) to ensure services are performed in accordance with specifications. A final QCP shall be submitted to the Contracting Officer Representative (COR) NLT 10 days after contract award. After acceptance of the QCP, the contractor shall obtain the Contracting Officer's (KO's) acceptance in writing of any proposed changes to its QCP.

1.5.4 Quality Assurance (QA): The Government will evaluate the contractor's performance under this contract in accordance with the Quality Assurance Surveillance Plan(QASP). This plan is primarily focused on what the Government will do to ensure that the contractor has performed in accordance with the performance standards.It defines how the performance standards will be applied, the frequency of surveillance, and acceptable quality level(s) or defect rate(s).

1.5.5 Access and General Protection/Security Policy and Procedures. The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the Contracting Officer's Representative (COR). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the local installation's Security Forces, Director of Emergency Services or local Security Office. The contractor shall ensure compliance with all personal identity verification requirements as directed by DoD, Headquarters Air Force(HAF) and/or local policy. Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.

1. The contractor shall obtain base identificationand vehicle passes, if required, for all contractor personnel who make frequent visits to or perform work on the Air Force installation(s) cited in the contract. Contractor personnel are required to wear or prominently display installation identification badges or contractor-furnished, contractor identification badges while visiting orperforming work on the installation.

2. The contractor shall submit a written request on company letterhead to the contracting officer listing the following: contract number, location of work site, start and stop dates, and names of employees and subcontractor employees needing access to the base. The letter will also specify the individual(s) authorized to sign for a request for base identification credentials or vehicle passes. The contracting officer will endorse the request and forward it to the issuing base pass and registration office or Security Forces for processing. When reporting to the registration office, the authorized contractor individual(s) should provide a valid drivers license, current vehicle registration, and valid vehicle insurance certificate to obtain a vehicle pass.

3. During performance of the contract, the contractor shall be responsible for obtaining required identification for newly assigned personnel and for prompt return of credentials and vehicle passes for any employee who no longer requires access to the work site.

4. When work under this contract requires unescorted entry to controlled or restricted areas, the contractor shall comply with the CORs direction.

5. Upon completion or termination of the contract or expirationof the identification passes, the prime contractor shall ensure that all base identification passes issued to employees and subcontractor employees are returned to the issuing office.

6. Failure to comply with these requirements may result in withholding of final payment.

1.5.5.1 Antiterrorism Awareness Level I Training (AT Level I). All contractor employees, to include subcontractor employees, requiring access to US Government installations, facilities and controlled access areas shall complete AT Level I training within 15 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. AT Level I may be accomplished by a Level I qualified instructor, completing the Force Protection computer-based training (CBT) course on the Advanced Distributed LearningSystem (ADLS) or Joint Knowledge Online at http://jko.jten.mil. Tracking for each contractor or subcontractor employee is the responsibility of the COR or unit AT Representative. The contractor shall submit certificates of completion for each affected contractor and subcontractor employee to the within 15 calendar days after completion of training by each employee or subcontractor personnel.

1.5.6 Project Superintendent (PM): The contactor shall designate a PM who shall ensure performance under this contract. The name of this person, and an alternate who shall act for the contractor when the PM is absent, shall be designated in writing to the KO. The PM or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The PM shall work through the COR, to resolve issues, receive technical instructions, and ensure adequate performance of services. The PM shall ensure that contractor employees do not perform any services outside the scope of the contract without an official modification issued by the KO. The PM shall ensure contractor employees understand that services performed outside the scope of the contract are performed wholly at the expenseof the contractor.

2.1 Quality Assurance: The Government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.

2.2 Quality Assurance Surveillance Plan (QASP): An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance per specifications.

2.3 Quality Control: All necessary measures taken bythe Contractor to ensure that the quality of an end product or service shall meet contract requirements.

3.0 Utilities: All utilities in the facility will beavailable for the contactor's use in the performance of this contract. The contractor shall instruct employees in utilities conservation practices. The contractor shall operate under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount.

4.0 General: Except for those items specificallystated in the plans and specifications to be Government-Furnished, the contractor shall furnish everything required to perform these services as indicated in on the plan drawings and specifications.

Service Contract Reporting:

5.0 Applicable Publications: Publications applicableto this PWS are listed in the plan drawings and specifications.

Requirements Bldg 210 alteration and construction

Section E - Inspection and Acceptance

FAR Clauses Incorporated by Reference

Number Title Effective Date

Alternate/ Deviation

Variation Effective Date

52.246-12 Inspection of Construction. Aug 1996

Overall Contract Inspection/Acceptance Locations

Inspection and Acceptance Location

Both Destination Instructions: See Statement of Work (SOW) or Plans and Specs for Acceptance/inspection criteria.

DoDAAC: F7K3MF CountryCode: USA

MISSION SUPPORT

AF BPN NO MILSBILLS PROCESSES, 223 ARNOLD AVE STE 47

KLAMATH FALLS, OR 97603-2111

UNITED STATES

Option Line Item

Inspection and Acceptance Location

Both Destination Instructions: See Statement of Work (SOW) or Plans and Specs for Acceptance/inspection criteria.

DoDAAC: F7K3MF CountryCode: USA

MISSION SUPPORT

AF BPN NO MILSBILLS PROCESSES, 223 ARNOLD AVE STE 47

KLAMATH FALLS, OR 97603-2111

UNITED STATES

Option Line Item

Inspection and Acceptance Location

Both Destination Instructions: See Statement of Work (SOW) or Plans and Specs for Acceptance/inspection criteria.

DoDAAC: F7K3MF CountryCode: USA

MISSION SUPPORT

AF BPN NO MILSBILLS PROCESSES, 223 ARNOLD AVE STE 47

KLAMATH FALLS, OR 97603-2111

UNITED STATES

Option Line Item

Inspection and Acceptance Location

Both Destination Instructions: See Statement of Work (SOW) or Plans and Specs for Acceptance/inspection criteria.

DoDAAC: F7K3MF CountryCode: USA

MISSION SUPPORT

AF BPN NO MILSBILLS PROCESSES, 223 ARNOLD AVE STE 47

KLAMATH FALLS, OR 97603-2111

UNITED STATES

Option Line Item

Inspection and Acceptance Location

Both Destination Instructions: See Statement of Work (SOW) or Plans and Specs for Acceptance/inspection criteria.

DoDAAC: F7K3MF CountryCode: USA

MISSION SUPPORT

AF BPN NO MILSBILLS PROCESSES, 223 ARNOLD AVE STE 47

KLAMATH FALLS, OR 97603-2111

UNITED STATES

Option Line Item

Inspection and Acceptance Location

Both Destination Instructions: See Statement of Work (SOW) or Plans and Specs for Acceptance/inspection criteria.

DoDAAC: F7K3MF CountryCode: USA

MISSION SUPPORT

AF BPN NO MILSBILLS PROCESSES, 223 ARNOLD AVE STE 47

KLAMATH FALLS, OR 97603-2111

UNITED STATES

Section F - Deliveries or Performance

Overall Contract Delivery Period

From 16 Apr 2025 to 20 Jul 2026

From date of lead time event to beginning of performance 30 Calendar Days Date of Notice to Proceed Receipt

From date of lead time event to completion of performance 450 Calendar Days Date of Notice to Proceed Receipt

Line Item Delivery Schedule Quantity Address and POC

Delivery Schedule From date of lead time event to completion of performance 450 Calendar Days Date of Notice to Proceed Receipt

Period of Performance From 16 Apr 2025 To 20 Jul 2026

1 Job Service Performance Site DoDAAC: F7K3MF CountryCode: USA

MISSION SUPPORT

AF BPN NO MILSBILLS PROCESSES, 223

ARNOLD AVE STE 47

KLAMATH FALLS, OR 97603-2111

UNITED STATES

Option Line Item

Delivery Schedule From date of lead time event to completion of performance 450 Calendar Days Date of Notice to Proceed Receipt

Period of Performance From 16 Apr 2025 To 20 Jul 2026

1 Job Service Performance Site DoDAAC: F7K3MF CountryCode: USA

MISSION SUPPORT

AF BPN NO MILSBILLS PROCESSES, 223

ARNOLD AVE STE 47

KLAMATH FALLS, OR 97603-2111

UNITED STATES

Option Line Item

Delivery Schedule From date of lead time event to completion of performance 450 Calendar Days Date of Notice to Proceed Receipt

Period of Performance

1 Job Service Performance Site DoDAAC: F7K3MF CountryCode: USA

MISSION SUPPORT

AF BPN NO MILSBILLS PROCESSES, 223

ARNOLD AVE STE 47

KLAMATH FALLS, OR 97603-2111

UNITED STATES

From 16 Apr 2025 To 20 Jul 2026

Option Line Item

Delivery Schedule From date of lead time event to completion of performance 450 Calendar Days Date of Notice to Proceed Receipt

Period of Performance From 16 Apr 2025 To 20 Jul 2026

1 Job Service Performance Site DoDAAC: F7K3MF CountryCode: USA

MISSION SUPPORT

AF BPN NO MILSBILLS PROCESSES, 223

ARNOLD AVE STE 47

KLAMATH FALLS, OR 97603-2111

UNITED STATES

Option Line Item

Delivery Schedule From date of lead time event to completion of performance 450 Calendar Days Date of Notice to Proceed Receipt

Period of Performance From 16 Apr 2025 To 20 Jul 2026

1 Job Service Performance Site DoDAAC: F7K3MF CountryCode: USA

MISSION SUPPORT

AF BPN NO MILSBILLS PROCESSES, 223

ARNOLD AVE STE 47

KLAMATH FALLS, OR 97603-2111

UNITED STATES

Option Line Item

Delivery Schedule From date of lead time event to completion of performance 450 Calendar Days Date of Notice to Proceed Receipt

Period of Performance From 16 Apr 2025 To 20 Jul 2026

1 Job Service Performance Site DoDAAC: F7K3MF CountryCode: USA

MISSION SUPPORT

AF BPN NO MILSBILLS PROCESSES, 223

ARNOLD AVE STE 47

KLAMATH FALLS, OR 97603-2111

UNITED STATES

FAR Clauses Incorporated by Reference

Number Title Effective Date

Alternate/ Deviation

Variation Effective Date

52.247-34 F.o.b. Destination. Nov 1991

Section G - Contract Administration Data

DFARS Clauses Incorporated by Reference

Number Title Effective Date

Alternate/ Deviation

Variation Effective Date

252.201-7000 Contracting Officer's Representative. Dec 1991 252.232-7003 Electronic Submission of Payment Requests and Receiving Reports. Dec 2018 252.236-7000 Modification Proposals--Price Breakdown. Dec 1991

DFARS Clauses Incorporated by Full Text

252.232-7006 Wide Area WorkFlow Payment Instructions. (Jan 2023)

As prescribed in 232.7004(b), use the following clause:

WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)

(a) Definitions. As used in this clause-

"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.

"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.

"Payment request" and "receiving report" are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall-

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the WAWF home page at https://wawf.eb.mil/

(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:

(1) Document type. The Contractor shall submit payment requests using the following document type(s):

(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.

(ii) For fixed price line items-

(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.

(Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.)

(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.

Invoice 2in1

(Contracting Officer: Insert either "Invoice 2in1" or the applicable invoice and receiving report document type(s) for fixed price line items for services.)

(iii) For customary progress payments based on costs incurred, submit a progress payment request.

(iv) For performance based payments, submit a performance based payment request.

(v) For commercial financing, submit a commercial financing request.

(2) ) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.

[Note: The Contractor may use a WAWF "combo" document type to create some combinations of invoice and receiving report in one step.]

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table*

Field Name in WAWF Data to be entered in WAWF Pay Official DoDAAC W50S8Z Issue By DoDAAC W50S8Z Admin DoDAAC W50S8Z Inspect By DoDAAC F7K3MF Ship To Code ____ Ship From Code ____ Mark For Code ____ Service Approver (DoDAAC) F7K3MF Service Acceptor (DoDAAC) F7K3MF Accept at Other DoDAAC ____ LPO DoDAAC ____ DCAA Auditor DoDAAC ____ Other DoDAAC(s) ____ (*Contracting Officer: Insert applicable DoDAAC information. If multiple ship to/acceptance locations apply, insert "See Schedule" or "Not applicable.")

(**Contracting Officer: If the contract provides for progress payments or performance-based payments, insert the DoDAAC for the contract administration office assigned the functions under FAR 42.302(a)(13).)

(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.

(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.

(g) WAWF point of contact.

(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.

Not Applicable

(Contracting Officer: Insert applicable information or "Not applicable.")

(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.

(End of clause)

Section H - Special Contract Requirements

1. INSURANCE - MINIMUM AMOUNTS

1.1. Reference Contract Clause titled, "Insurance - Work on a Government Installation (FAR 52.228-5). Types and minimum amounts are as follows:

TYPE AMOUNTS

Workmen's Compensation $100,000 (see paragraph 1.2, below)F

Comprehensive General Liability $500,000 per occurrence for bodily injury

Comprehensive Automobile Liability $200,000 per person and $500,000 per accident for bodily injury and $20,000 for property damage

(If applicable) $200,000 per person and $500,000 per occurrence

Aircraft Public and Passenger for bodily injury, other than passenger

Liability liability and $200,000 per occurrence for property damage; coverage for passenger liability bodily injury shall be at least $200,000 multiplied by the number of seats $200,000 multiplied by the number of seats or passengers, whichever is greater.

1.2. Except in states with exclusive or monopolistic funds that do not permit workers' compensation to be written by private carriers.

1.3. NOTE: Before commencing work under this contract, the Contractor shall certify to the Contracting Officer, in writing, that the required insurance has been obtained. The policies referenced in the certification (s) shall contain an endorsement to the effect that any cancellation or any material change adversely affecting the Government's interest shall not be effective (1) for such period as the laws of the state in which this contract is to be performed prescribe or (2) until 30 days after the insurer or the Contractor gives written notice to the Contracting Officer, whichever period is longer. The Contractor shall maintain a copy of proofs of required insurance and shall make copies available to the Contracting Officer upon request. The Contractor shall maintain a copy of all subcontractors' proofs of required insurance and shall make copies available to the Contracting Officer upon request.

2. Reserved.

3. SCHEDULING

3.1. Normal base work hours for the Contractor will be between the hours of 7:00 AM through 4:30 PM, excluding Saturdays, Sundays, and Federal Holidays. If the Contractor desires to work during periods other than above, he must notify the Contracting Officer's Representative (COR) five (5) working days in advance of his intention to work during other periods to allow assignment of additional inspection forces. When the COR determines that they are reasonably available, he may authorize the Contractor to perform work during periods other than normal duty hours/days. However, if inspectors are required to perform in excess of their normal duty hours/days solely for the benefit of the Contractor, the actual cost of the inspection, at overtime rates, will be charged to the Contractor and will be deducted from the final payment of the Contract amount.

3.2. Prior to commencing work on the job initially, resumption of work after prolonged interruption (7 calendar days or more), commencement of any warranty work, and upon completion of warranty work, the contractor must notify the Contracting Officer (or the Contracting Officer's Representative). When relocating to new sites, returning to sites for follow-up work on a phased work plan, notification to the Contracting Officer's Representative is sufficient. Notification should be by personal contact; however, advance notification may be by telephone, or in writing, and should be accomplished sufficiently in advance to allow scheduling of inspection forces. The purpose of the above precautions is to ensure construction inspection and recording of work proceedings.

3.3. The organization of the specifications into divisions, sections, and articles, and the arrangement of the drawings shall not control the Contractor in dividing the work among subcontractors or in establishing the extent of the work to be performed by any trade.

4. INVOICING AND PAYMENT

4.1. Properly prepared invoices, bearing the contract number, shall be submitted in duplicate to the Contracting Office, on designated invoice forms provided at the pre-construction meeting PRIOR to uploading in Wide Area Workflow (WAWF) the DFAS paying system. This submission will be for review prior to submitting an electronic invoice through Wide Area Workflow (WAWF). See end of this Section for important information and codes needed.). Payment will be made by in accordance with FAR clause 52.232-5 Fixed-Price Construction Contracts and FAR clause 52.232-27, Prompt Payment for Construction Contracts, all payments will be made by electronic transfer of funds (EFT).

4.2. To meet compliance with DFARS 252.232-7003, Electronic Submission of Payment Requests, you shall submit your request for payment (invoice) through WAWF. For more information on the WAWF system, including how to register, visit https://wawf.eb.mil. Payment will be made by paying office specified in the contract award in accordance with the clauses Payments under Fixed-Price Construction Contracts, FAR 52.232- 5, and Prompt Payment for Construction Contracts, FAR 52.232-27.

4.3. The Government will make payment through WAWF upon satisfactory completion of work AND receipt of a proper certification for payment. Do not input invoice into WAWF until the pre-approval of invoice is received from the contracting officer. This will lessen the need for rejections in WAWF Payment may be withheld unless all contractual requirements including but not limited to: RECEIPT OF PROPER WEEKLY PAYROLLS IAW DAVIS BACON REQUIREMENTS, Small Business Subcontracting Reports, have been timely received.

4.4. All requests for payments through WAWF must include a Subcontractor Payment Register pursuant to FAR Clause 52.232-5 and a contractor's certification that reads as follows:

I hereby certify, to the best of my knowledge and belief that -

The amounts requested are only for performance in accordance with the specifications, terms and conditions of the contract; All payments due to subcontractors and suppliers from previous payments received under the contract have been made, and timely payments will be made from the proceeds of the payment covered by this certification, in accordance with subcontract agreements and requirements of Chapter 39 of Title 31, United States Code; This request for progress payments does not include any amounts which the prime contractor intends to withhold or retain from subcontractor or supplier in accordance with the terms and conditions of the subcontract; and This certification is not to be construed as final acceptance of a subcontractor's performance.

4.5. The Government will make payment upon satisfactory completion of work AND receipt of a proper certification for payment. Payment may be withheld unless all contractual requirements, including but not limited to: RECEIPT OF PROPER WEEKLY PAYROLLS IAW CONSTRUCTION WAGE REQUIREMENTS FAR 52.222-6, 2 and Small Business Subcontracting Reports, have been timely received.

Payrolls shall indicate CLIN to which they are applicable.

4.6. A release of claims is required for all final payment requests and shall be submitted by the contractor with the final invoice.

5. CONTRACT ADMINISTRATION

5.1. The contracting office of the 173d FW Kingsley Field Oregon is the office having administrative jurisdiction over this contract for all matters. A list of the names and telephone numbers of the Government team comprising the contract administrator, Contracting Officer's Representative (COR), consultant, and point of contact at the project site will be provided at the post-award/pre-construction conference.

5.2. All correspondence shall be addressed to the Contracting Officer. A copy of all correspondence shall be furnished to the contracting officer's representative. Enclosures attached to or transmitted with the correspondence shall also be furnished with an original and one copy. Each letter shall reference the contract name, contract number, project number, and project title, and shall have only one subject. For tracking purposes, a sequential numbering system should be used for all correspondence.

6. PAPERLESS CONTRACTING

6.1. The National Guard is fully committed to the Federal Government's electronic commerce and paperless contracting initiatives. As such, it is anticipated that to the maximum extent possible to include but not limited to correspondence, modification distribution, etc., to include specifications and drawings, will be issued using electronic methods, i.e., electronic mail (e-mail). Contractors shall have and maintain capability to receive documents in this manner.

6.2. Additionally, it is anticipated that within the life of this contract, other electronic processes will be enacted.

These include, but are not limited to, electronic bidding/offers, change order proposals, and electronic invoicing.

When implemented by the Contracting Officer, contractors shall participate fully in any of these new requirements at no additional cost to the Government.

7. TELEPHONE COMMUNICATIONS SECURITY MONITORING

All communications with DOD organizations are subject to communications security (COMSEC) review.

Contractor personnel must be aware that telephone communications networks are continually subject to intercept by unfriendly intelligence organizations. The DOD has authorized the military departments to conduct COMSEC monitoring and recording of telephone calls originating from, or terminating at, DOD organizations.

Therefore, civilian contractor personnel are advised that any time they place a call to, or receive a call from, a

DOD organization, they are subject to COMSEC procedures. The contractor shall assume the responsibility for ensuring wide and frequent dissemination of the above information to all employees dealing with DOD information.

8. UTILITY SERVICES

The Contracting Officer has determined that Government-operated utilities are adequate and will be furnished to the contractor without charge where existing outlets are available. The contractor is responsible for installing temporary service outlets, as necessary, at its expense in accordance with the clause entitled "Availability and Use of Utility Services" (FAR Clause 52.236-14). The following utilities will be available:

9. PREPARATION OF MATERIAL APPROVAL SUBMITTALS

The contractor shall submit all materials and articles requiring approval, as required by the Material and Workmanship Clause, FAR 52.236-5. Submittals shall be made using AF Form 3000 or approved equal.

Submittals shall be given a distinct identification system by CLIN if multiple CLINs are applicable. Individual submittal documents shall not be comprised of items for more than one CLIN. Address for delivery of submittals will be provided at the post award/pre-construction conference. The contractor is reminded that an individual within the company who has authority to make the certification must sign the certification on the AF Form 3000.

10. WORK PROGRESS AND PREPARATION OF PROGRESS SCHEDULES AND REPORTS

10.1. A weekly meeting may be held with the Contractor, COR and Contracting Officer (KO), if necessary, to discuss work progress, problems and potential change orders. The Contractor shall attend these meetings at no additional cost to the Government. Prior to beginning work on specific work elements of a project, the contractor shall confer with the COR and agree on a sequence of procedures and means of access to premises and buildings; space for storage of materials and equipment; delivery of materials; and use of approaches, use of corridors, stairways and similar means of passage.

10.1.1. In accordance with FAR Clause 52.236-15, "Schedules for Construction Contracts", the contractor shall within five days after work commences on the contract, or another period of time determined by the KO, prepare and submit to the KO for approval three copies of a practicable schedule showing the order in which the contractor proposes to perform the work, and the dates on which the Contractor contemplates starting and completing features of work. A composite schedule for the overall contract shall also be provided. The schedule shall be on an AF Form 3064, Contract Progress Schedule, or an approved computer-generated format similar to the AF Form 3064. The work shall be scheduled so that, upon the start of construction, work progresses in a continuous and diligent manner. A schedule which does not reflect steady and reasonable progress throughout the construction period will be rejected. Both the Contractor and the COR are required to provide monthly progress reports covering the period from notice to proceed through final inspection. Unless agreement cannot be made on the applicable percentage of progress a joint report will be submitted to the Contracting Officer.

These reports shall be submitted on the NGB Contract Progress Report form (similar to an AF Form 3065), or an approved computer-generated similar format. These reports shall track progress by CLIN, if contract contains multiple CLINs, multiple AF Form 3064 and NG Contract Progress Reports will also be required for payment purposes.

10.2. Additionally, for projects exceeding $1M, the contractor shall provide a project plan in a commercially available network scheduling software that meets requirements of the specification to define work tasks and track progress. At least five days prior to work initiation, the contractor shall provide the Contracting Officer a copy of the plan that shall include definition of rescues. No work may start until the Contracting Officer approves the plan in writing.

10.3. The Contractor shall prepare a work progress schedule required for completion of each of the various divisions of work. Updated plans and Form 3064 showing work progress shall be provided. If there are possible deviations from the original plan, those must be noted and approved by the Contracting Officer before work changes are implemented. The schedule shall be submitted to the Contracting Officer, in the number of copies as directed. Reference Contract Clause FAR 52.236-15, "Schedules for Construction Contracts". The reports contemplated by the clause herein titled "Schedules for Construction Contracts" shall be accomplished on and in accordance with instructions pertaining to AF Form 3064, "Contract Progress Schedule" and a National Guard Contract Progress Report".

11. NOTICE OF COMPLETION OF CONSTRUCTION/PRE-FINAL AND FINAL INSPECTION

11.1. The contractor shall conduct a pre-final inspection in the presence of the Contracting Officer's Representative (COR) prior to the date scheduled for Final Inspection. Any discrepancies noted shall be corrected prior to Final Inspection.

11.2. The contractor shall request scheduling of a final inspection in writing to the Contracting Officer at least five (5) working days prior to the desired date or as otherwise negotiated with the Contracting Officer.

11.3. Civil Engineering personnel and the Contracting Officer will perform the Final Inspection in the presence of the contractor, and any discrepancies noted shall be corrected within the time specified by the Contracting Officer.

11.4. Final Inspection shall not constitute acceptance of a project unless so stipulated by issuance of a separate acceptance notice.

11.5. The contractor is cautioned to ensure they have completed adequate Quality Control reviews prior to scheduling pre-final or final inspections. In the event the Contracting Officer finds that the project is not ready for the applicable inspection, (too many discrepancies) the contractor may be held liable for the costs of a repeat inspection. If the inspection involves A-E personnel these costs may include additional labor, travel and miscellaneous expenses.

12. DESIGNATION OF TECHNICAL REPRESENTATIVE

The Contracting Officer will appoint a qualified Contracting Officer's Representative (COR) for the purposes of technically administering the contract; however, all matters concerning this contract or any work ordered placed against this contract must first be approved by the Contracting Officer. This in no way authorizes anyone other than the Contracting Officer to commit the Government to changes in terms of the contract.

13. CONTRACTOR STAFF AND EMPLOYEES

13.1. Prior to commencing on-site construction, the contractor shall provide the Contracting Officer with a telephone number and email address at which the contractor or his representative may be contacted at any time during regular working hours and an emergency number at which the contractor may be contacted in situations requiring immediate attention.

13.2. Supervision. The Government shall not exercise any supervision or control over the contractor employees performing services under this contract; such employees shall be accountable not to the Government, but solely to the contractor, who in turn is responsible to the Government.

13.3. Contractor's Employees. All work under this contract shall be performed in a skillful and workmanlike manner. The Contracting Officer may, in writing, require the contractor to remove from the job site, any employee the Contracting Officer deems incompetent, careless or otherwise objectionable.

14. CONTRACTOR OFFICE AND STORAGE

14.1. Parking of contractor vehicles shall be restricted to the contractor's designed on-site area or the work area.

The company…