This is a Questions and Answers document addressing contractor inquiries regarding restroom renovation work at an Air National Guard (ANG) facility.
The project involves renovating two restrooms with several key requirements: both restrooms must undergo simultaneous construction per an aggressive timeline, and the building will remain occupied during work with plastic sheeting used for debris containment. Working hours are Monday through Thursday, 0700-1730. Contractors must provide a portable restroom for use during construction. For Restroom 1, the ACT ceiling will be retained with existing ceiling grids and tiles reused (replacement tiles available on-hand if needed). Both restrooms require new LED lighting fixtures that match. Existing wall-mounted exhaust fans must be removed and replaced with ceiling-mounted fans, with exhaust routed through the east wall or east wall soffit with no roof penetrations; spaces where wall fans are removed must be filled. The old doorway into the conference room must be closed with cinderblock to match existing walls. A light switch at Bathroom #1 should be relocated to the wall opposite the new door swing for accessibility. Surface-mounted electrical conduits are acceptable where compliance with buried conduit requirements is impossible due to filled brick cells. Where the exterior vent brick is being removed, the replacement brick should match as closely as possible. A layout of Restroom 1 and a building blueprint are attached as references.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Question Answer Can a layout/blueprint be provided for the entire building? attached
Does the ANG want the old doorway patched and painted back with CMU or Drywall and framing?
if this is referring to the doorway into the conference room, then close it up with like materials to the existing wall (Cinderblock)
Is the ceiling in restroom 1 ACT or drywall? ACT Can a layout of restroom 1 be provided? attached Will a temp wall be needed to separate work area from occupied area? plastic sheeting is acceptable to keep construction debris down Can both bathroom be under construction at the same time? This is needed due to the aggressive timeline requested. yes Can contractor use existing restroom or will a portable restroom be required? portable restroom Where the exterior vent of restroom 1 is being removed, that brick is difficult to source, how close of a match is acceptable? as close as possible Where does the new exhaust vent in restroom 1 vent, roof or exterior wall? exterior wall Please verify the working hours M-Th 0700-1730 Please verify if the building will be occupied during the work and if any temporary walls or partitions need to be installed to separate workers or help with noise The area will stay occupied, Plastic sheeting should be sufficient to keep out particulates It appears that the existing brick cells are filled making it impossible to comply with the notes on paragraph 19.b which require running new electric behind the block. Please verify that surface mounted electrical conduits are acceptable Surface mounted electrical conduits is acceptable
Please verify if the light switch at Bathroom #1 should be relocated to the new door location mount it on the wall opposite of the new door swing, so it is accessible
Is the intent for new ceiling grid and acoustical ceiling tiles to be installed in both or either RR? The grid appeared to be in good shape, but the tiles (especially in RR 1) have some damage
The intent is to use the existing ceiling grid and ceiling tiles; if replacement tiles are needed, we have them on-hand.
Please verify if new LED light fixtures should be installed in RR2 in addition to RR1. Both restrooms need new LED lighting that matches.
The specifications for the exhaust fan seem to be based on a ceiling mounted fan that is much quieter.
Since this is a wall mount application please verify if a rating of 8.5 sonnes is acceptable. If not, please provide model number for the replacement of the existing NuTone WF-17.
remove the existing wall mount fans, and install ceiling mount fans, however the exhaust should be routed either through the East wall or through the soffit on the east wall. No roof penetrations.
If we find that the existing fan is still working is it acceptable to leave it in place? No, the existing wall mount fans need to be removed and replaced with ceiling mount fans.
Do we need to fill in the space where the wall mounted exhaust fans are removed? Yes