This amendment to solicitation W50S8T23B0004 provides responses to contractor questions about specifications for renovations to Building 1001 at the 137th Special Operations Wing. The renovation will combine two rooms and require resizing an existing VAV box to accommodate the new combined square footage, with a motor estimated at 800 CFM and 1 horsepower. Finishes have been specified for carpet, wall paint, door frames, ceiling tile, and grid. Specifications for the wet pipe sprinkler system are provided in an attached file. The response deadline for any further requests for information was 14 August 2023.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to include the Wet Pipe Sprinkler System specifications #15325. No other changes made and all other terms and conditions remain in full force and effect.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 17-Aug-2023

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W50S8T23B0004

X 9B. DATED (SEE ITEM 11)

21-Jul-2023

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

17-Aug-2023

CODE

USPFO OK 137 MISSION SUPPORT CONTRACTING

5901 AIR GUARD DR

OKLAHOMA CITY OK 73179-1051

W50S8T 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W50S8T23B0004

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 10 00 - SOLICITATION

The following have been modified:

RFI Q&A

Request for Information (RFI’s) Question & Answers

Due Date for RFI’s was 14 August 2023 below are the questions received and answers.

1. Sheet M-102 appears to indicate a new VAV box. Sheet MD-101 appears to show demolishing the VAV box in the same location - FPVAV-5. If a new VAV box is required, we will need specs: specifically, the voltage, type of controls, type of reheat, and CFM requirement. If we are instead just reusing the existing VAV, please verify that is the case.

Answer: Voltage is 120-208 fed from panel L2 breaker 22. Controls is DDC johnson controls.

Reheat is from a boiler system. Contractor to generate the reqirementfor the CFM based on the additional square footage of the combined rooms "-Remove and resize the VAV that currently serves room A114 to accommodate the additional square footage of the two combined rooms."

pulled from the SOW

2. We also need the CFM requirement for the air devices for the entire sheet for testing and balancing purposes.

Answer: The new combined square footage shall be calculated and provided before final installation however the government estimates 800 CFM with a ¼ horse power motor is needed .

Please see the attachment M-201 Current CFM.pdf

3. Finishes in certain areas that are not called out to match surrounding areas are listed as TBD. Have the finishes been decided upon.

Answer: Carpet tile: Shaw Kasuri Tile EW 24/5T046, Cove base: Flexco Chocolate brown, Wall paint: Latex Egg-Shell SW-7016 Mindful grey, Door frames: DTM Acrylic Semi-Gloss SW- 7041 Van Dyke Brown, Ceiling tile: Armstrong - 1732, Ceiling Grid: Armstrong 1"white Door finish to match existing doors.

4. Table of Contents list 15325 Wet Pipe Sprinkler System. This is not included in the specifications. Can you please provide?

Answer: Please see the attached specifications Fire supression Specs-15325.pdf