Asbestos Abatement Bldg #76 for STARBASE Program

W50S8C-21-Q-0014

RFI #001

Question 1 – Lead survey shows tile at baseboard and shower tile in bathrooms, but no note(s) on demo plan or PWS?

Answer – This specific project does not require any demo or renovation work within the restroom areas.

Question 2 – Asbestos survey states 2 pipe elbows located at kitchen ceiling, but there is no demo note(s) for ceiling system to be removed?

Answer – The kitchen ceiling consists of t-bar and drop-in tiles. The contractor will be able to access both pipe insulation elbows by simple removing existing drop-in tiles.