RFI 1.pdf

PDF 212 KB Posted

Attached to
Generator Installation
Solicitation number
W50S82-20-B-0003
Issued by

View the file

Other files

File Type Posted
Bid Opening Results.pdf PDF
RFI 2.docx DOCX document
SOW Addendum.docx DOCX document
W50S82-20-B-0003-0001.pdf PDF
Site Visit Sign In Sheet_Redacted.pdf PDF
Site Visit Sign In Sheet_Redacted.pdf PDF
W50S82-20-B-0003.pdf PDF
Facility 2072 Riser Diagram.pdf PDF
Bldg4200_Exst Generator Location.pdf PDF
SOW PJMS192026 Install Emergency Generator at 2072 and 4200 (1).docx DOCX document
Bldg4200 Riser Diagram.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1) It appears to me that the existing ATS for the 60 KW Generator is existing and to be reused "if possible". Yes

2) Regarding the 125 KW for BLdg. 4200, the one line diagram shows item "20" as the generator feeding the fire pump. The fire pump controller has an integral transfer switch. I do not see where at ATS is to be used at this location either. Am I correct? Yes

3) Who will be responsible for moving the existing the generator from the site to customer’s holding area. Vendor will be responsible.

4) Who will be responsible for fuel for startup and testing? Vendor will be responsible.

5) Who will responsible for start-up? Vendor will be responsible.

6) Who will be responsible for up-dating the Engineer drawings for the added conduit and wire from the disconnect to the 125KW? Vendor will be responsible.