RFI 1.pdf
PDF 212 KB Posted
- Attached to
- Generator Installation
- Solicitation number
- W50S82-20-B-0003
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Opening Results.pdf | ||
| RFI 2.docx | DOCX document | |
| SOW Addendum.docx | DOCX document | |
| W50S82-20-B-0003-0001.pdf | ||
| Site Visit Sign In Sheet_Redacted.pdf | ||
| Site Visit Sign In Sheet_Redacted.pdf | ||
| W50S82-20-B-0003.pdf | ||
| Facility 2072 Riser Diagram.pdf | ||
| Bldg4200_Exst Generator Location.pdf | ||
| SOW PJMS192026 Install Emergency Generator at 2072 and 4200 (1).docx | DOCX document | |
| Bldg4200 Riser Diagram.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1) It appears to me that the existing ATS for the 60 KW Generator is existing and to be reused "if possible". Yes
2) Regarding the 125 KW for BLdg. 4200, the one line diagram shows item "20" as the generator feeding the fire pump. The fire pump controller has an integral transfer switch. I do not see where at ATS is to be used at this location either. Am I correct? Yes
3) Who will be responsible for moving the existing the generator from the site to customer’s holding area. Vendor will be responsible.
4) Who will be responsible for fuel for startup and testing? Vendor will be responsible.
5) Who will responsible for start-up? Vendor will be responsible.
6) Who will be responsible for up-dating the Engineer drawings for the added conduit and wire from the disconnect to the 125KW? Vendor will be responsible.