Bldg4200 Riser Diagram.pdf
PDF 203 KB Posted
- Attached to
- Generator Installation
- Solicitation number
- W50S82-20-B-0003
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Opening Results.pdf | ||
| W50S82-20-B-0003-0001.pdf | ||
| RFI 2.docx | DOCX document | |
| SOW Addendum.docx | DOCX document | |
| RFI 1.pdf | ||
| Site Visit Sign In Sheet_Redacted.pdf | ||
| Site Visit Sign In Sheet_Redacted.pdf | ||
| SOW PJMS192026 Install Emergency Generator at 2072 and 4200 (1).docx | DOCX document | |
| Facility 2072 Riser Diagram.pdf | ||
| Bldg4200_Exst Generator Location.pdf | ||
| W50S82-20-B-0003.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
JANUARY 7, 2011 K. DISPOTO
H. MATIC M. MOLLINEDO
MDANG REPLACE O AND T
ELECTRICAL ONE-LINE DIAGRAM
E601 3
55460E601.DWG
9 108104 44
F
5 5
12 11
SPD
SPD
SPD
SPD
S c a l e
F o r
M i c r o f i l m i n g
I n c h e s
M i l l i m e t e r s
no. date descriptionby
1 1615141312111098765432 17
M
L
K
H
G
F
E
D
C
B
A date detailed checkeddesigned ofsheet sheets project contract rev.drawing file ckd
REPLACE OPERATIONS AND MEDICAL
TRAINING FACILITY
MARYLAND AIR NATIONAL GUARD
MARTIN STATE AIRPORT
PJMS90992855460
MDANG REPLACE O AND T
RECORD DRAWINGS
THESE DRAWINGS REPRESENT THE
COMPILATION OF MARK-UPS AND
REVISIONS PROVIDED BY THE TRADE
CONTRACTORS. THESE DRAWINGS
WERE REVISED BY A CADD TECHNICIAN
NOT LOCATED AT THE SITE, AND IN
RELIANCE UPON THAT INFORMATION,
WITHOUT ANY INDEPENDENT INVESTIG-
ATION OR VERIFICATION BY ANY PARTY,
WHICH WAS BEYOND THE SCOPE OF
SERVICES TO BE PROVIDED. THESE
DRAWINGS ARE NOT REPRESENTED TO
BE WHAT IS SOMETIMES REFERRED TO
AS "AS-BUILT". THESE RECORD DRAW-
INGS SHOULD NOT BE RELIED UPON TO
BE COMPLETE OR WHOLLY ACCURATE.
FIELD VERIFICATION OF ALL LOCATIONS,
DIMENSIONS, OR VOIDS, INCLUDING
EXPLORATION, VERIFICATION AND
EXACT LOCATION OF CONCEALED OR
UNDERGROUND ITEMS OR CONDITIONS
SHOULD BE UNDERTAKEN BY ANY PARTY
RELYING UPON THESE DRAWINGS,
ESPECIALLY PRIOR TO ANY ACTUAL
OPERATION, MAINTENANCE, OR FUTURE
PLANNING OF ANY MODIFICATION, SITE
EXCAVATION, OR EXTENSION TO THE
FACILITIES.
I:\USAIRNG\55460\CAD\ELEC\55460E601.DWG 9/16/2014 9:37 AM KDISPOTO
G
L=162 FT.
VD=0.4%
[Isc= 28,464A]
AVAILABLE SYMMETRICAL SHORT
CIRCUIT CURRENT AT
TRANSFORMER SECONDARY
TERMINALS PROVIDED BY BGE
[Isc=
22,603A]
L=110 FT.
VD=0.2%
L=44 FT.
VD=0.1%
L=15FT.
VD=0%
L=142 FT.
VD=0.2%
[Isc=
8,442A]
L=219 FT.
VD=0.3%
[Isc=
6553A]
L=64 FT.
VD=0.2%
[Isc=
18,106A]
L=148 FT.
VD=0.9%
[Isc=
3,782A]
[Isc=
17,429A]
L=60 FT.
VD=0.3%
[Isc=
19,743A]
L=194 FT.
VD=0.4%
L=20 FT.
VD=0.1%
[Isc=
7,878A]
[Isc=
10,291A]
L=170 FT.
VD=0.6%
L=20 FT.
VD=0.1%
[Isc=22,603A]
[Isc=
21,334A]
[Isc=
9,972A]
L=10FT.
VD=0.1%
[Isc=9,789A]
L=10FT.
VD=0.1%
[Isc=
8,970A]
L=200FT.
VD=1.2%
[Isc=
3,891A]
L=136FT.
VD=1.7%
[Isc=
4,820A]
L=205FT.
VD=1.2%
[Isc=
3,833A]
[Isc=19,054A]
L=10 FT.
VD=0.1%
L=38 FT.
VD=0.5%
L=124 FT.
VD=1.2%
[Isc=
9,360A]
L=50 FT.
VD=0.3%
L=90 FT.
VD=0.9%
L=10 FT.
VD=0.1%
[Isc=
15,330A]
[Isc=
8,090A]
[Isc=
2,392A]
L=124 FT.
VD=0.6%
L=50 FT.
VD=0.1%
[Isc=
15,149A]
[Isc=3,901A]
[Isc=
17,412A]
[Isc=
3,979A]
L=10 FT.
VD=0.1%
L=12 FT.
VD=0.1%
L=10FT.
VD=0%
[Isc=
9,099A]
L=10FT.
VD=0%
[Isc=
4,647A]
[Isc=
2,508A]
[Isc=
2,777A]
[Isc=
3,787A]
UFER
GROUNDING
UFER
GROUNDING
L=35 FT.
UFER
GROUNDING
25 25 25 25 25
2 2 2 2 2
MARK
FEEDER SCHEDULE
DESCRIPTION
KEYED NOTES:
4#3 AWG + 1#8 GROUND IN 1-1/4" CONDUIT
4#1/0 AWG + 1#6 GROUND IN 2" CONDUIT
4#2/0 AWG + 1#6 GROUND IN 2" CONDUIT
4#1 AWG + 1#6 GROUND IN 2" CONDUIT
2 SETS OF 4#500kcmil + 1#2/0 GROUND IN 2-4" CONDUIT
4#400kcmil + 1#3 GROUND IN 4" CONDUIT
4- 4" SCHEDULE 40 PVC CONDUIT CONCRETE ENCASED
WITH PULLROPES
M
NEUTRAL
GROUND
250A
3P
300A
3P
300A
3P
125A
3P
125A
3P
125A
3P
90A
3P
HP1 HP2 HP3 M1
ELEV
CHILLER
150A
3P
150A
3P
PP2 PP3
150A
3P
PP1
350A
3P
L
EN
'MTS'
300A
3P
110A
3P
EH1
300A
3P
150A
3P
150A
3P
EP1
250A
3P
100A
3P
EC
'EDP' 400A, 208Y/120V, 3Ø,
4-WIRE, 22kAIC, 42 POLE
'EHD' 400A, 480Y/277V, 3Ø,
4-WIRE, 35kAIC, 42 POLE
XFMR 'T2'
225kVA
480-208Y/120V
3Ø, 4-WIRE, 5.0% Z
'DP' 800A, 208Y/120V, 3Ø,
4-WIRE, 22kAIC
100A
3P
100A
3P
1200A
3P
3#6 AWG + 1#8 GROUND IN 1" CONDUIT
3#250 kcmil + 1#4 GROUND IN 2-1/2" CONDUIT
3#1 AWG + 1#6 GROUND IN 1-1/4" CONDUIT
4#250 kcmil + 1#2 GROUND IN 3" CONDUIT
BALTIMORE GAS & ELECTRIC (BGE) SUPPLIED TRANSFORMER.
480Y/277V, 3-PHASE, 4-WIRE UNDERGROUND SECONDARY SERVICE DUCTBANK.
BGE METER FOR FUTURE DINING FACILITY.
BGE METER FOR O&T BUILDING.
1600A, 480Y/277V, 3Ø, 4-WIRE 35 kAIC INCOMING AND CURRENT TRANSFORMERS (CT) MAIN
SECTION TO BE LABELED 'MSA'.
FIRE PUMP OUTDOOR CT CABINET. COORDINATE CT CABINET REQUIREMENTS WITH BGE.
400A, 480Y/277V, 3Ø, 4-POLE WITH 400A CIRCUIT BREAKER, 35 kAIC MANUAL TRANSFER
SWITCH FOR 200 kW, 480Y/277V, 3Ø, 4-WIRE OPTIONAL STAND-BY GENERATOR.
400A, 277/480V, 3Ø, 4-POLE, OUTDOOR NON-FUSED DISCONNECT SWITCH.
ELEVATOR FUSIBLE SWITCH WITH SHUNT-TRIP, ISOLATION RELAY AND CONTACTOR FOR
FIRE ALARM CONNECTION.
ELEVATOR CONTROLLER.
IDENTIFY DISCONNECT AS 'SERVICE DISCONNECT' FOR O&T.
IDENTIFY DISCONNECT AS 'SERVICE DISCONNECT FOR FUTURE DINING FACILITY'.
#4/0 AWG BARE COPPER GROUND CONNECTION TO EFFECTIVELY GROUNDED BUILDING
STEEL STRUCTURE, STREET SIDE OF WATER METER MAIN SUPPLY METAL PIPING AND
GROUND RING.
DIGITAL METER WITH PROVISIONS FOR REMOTE METERING COMPATIBLE WITH
DDC/BUILDING MANAGEMENT SYSTEM COMMUNICATION PORT. E-MON/D-MON OR
APPROVED EQUAL.
UNDERGROUND PRIMARY DISTRIBUTION LINE PROVIDED BY BGE. CONTRACTOR TO
PROVIDE 2-4" PVC SCHEDULE 40 LONG RADIUS ELBOWS AT TRANSFORMER PAD AT BGE
INSTALLATION DIRECTION.
O&T 1200A, 480Y/277V, 3Ø, 4-WIRE,35 kAIC MAIN SERVICE SECTION 'MSB'.
O&T 1200A, 480Y/277V, 3Ø, 4-WIRE, MAIN DISTRIBUTION SECTION 'MSC'.
FUTURE DINING FACILITY 800A, 480Y/277V, 3Ø, 4-WIRE, 35 kAIC MAIN SERVICE SECTION
'MSD'.
PROVIDE EXTERIOR SURGE PROTECTION DEVICE.
130kW/163kVA, 480V, 3-PHASE, 3-WIRE, 65kAIC OUTDOOR EMERGENCY GENERATOR.
COMBINATION AUTOMATIC TRANSFER SWITCH AND FIRE PUMP PROVIDED BY FIRE
PROTECTION WORK WIRED BY CONTRACTOR.
BGE METER FOR FIRE PUMP ELECTRIC SERVICE.
300A, 600AF, 277/480V, 3Ø, 3-POLE, 4-WIRE, 35 kAIC SERVICE ENTRANCE RATED FIRE PUMP
DISCONNECT SWITCH 'MSFP'.
PROVIDE 120V SHUNT TRIP BREAKER. CIRCUIT BREAKER WILL OPEN UPON ACTIVATION OF
EMERGENCY SHUT-OFF PUSHBUTTON LOCATED IN MAIN LOBBY. RESET CIRCUIT BREAKER
MANUALLY.
PROVIDE ISOLATED GROUND BUS AT PANELBOARD. PROVIDE 1#6 AWG ISOLATED,
GROUNDING CONDUCTOR FROM ISOLATED GROUND BUS TO TRANSFORMER 'T2' GROUND
BUS. THE ISOLATED GROUND CONDUCTORS SHALL PASS THOUGH 'DP' WITHOUT MAKING A
CONNECTION PER NEC.
'MSC' 1200A, 480Y/277V, 3Ø,
4-WIRE, 35kAIC
SPARE SPARE
225AF
SPACE
NOT TO SCALE
ELECTRICAL ONE-LINE DIAGRAM
M
800A
3P
M
EP2
EH2
(COMM)
(120-TON)
FOR FUTURE
DINING FACILITY
SERVICE
'MSA'
'MSD'
2 -4" SCHEDULE 40 PVC CONDUIT LONG RADIUS ELBOW AT
TRANSFORMER PAD
'MSB'
4#8 AWG + 1#8 GROUND IN 1" CONDUIT
40A
3P
40A
3P
40A
3P
40A
3P
400AF
SPACE
225AF
SPACE
TYPICAL OF ALL
PANELBOARDS
4#350 kcmil + 1#4 GROUND IN 3" CONDUIT
EP3
GFI
4#3 AWG IN 3" CONDUIT
3#6 AWG + 1#8 GROUND IN 1" CONDUIT
3#3 AWG + 1#8 GROUND IN 3" CONDUIT
L
EN
ATS/CONT-FP
XFMR 'T1'
EH3
FIRE PUMP
FP-1
250AT
3P
MSFP
300A
600AF
3P
35kAIC
NEUTRAL
GROUND
FIRE PUMP
DISCONNECT
SWITCH
P1A
150A
3P
M
3#400 kcmil AWG + 1#3 GROUND IN 3" CONDUIT
15A
3P
1. FEEDER LENGTH IN FEET ARE INDICATED FOR
VOLTAGE DROP CALCULATION ONLY AND SHALL NOT
BE USED FOR QUANTITY TAKE-OFFS.
2. CURRENT INSIDE BRACKET INDICATE PRELIMINARY 3
PHASE SHORT CIRCUIT CURRENT CALCULATION.
3. CONTRACTOR SHALL COORDINATE SERVICE WORK
WITH BGE, SERVICE EQUIPMENT INSTALLATION SHALL
BE APPROVED/ACCEPTED BY BGE PRIOR TO
PURCHASING AND INSTALLATION. ELECTRIC SERVICES
REQUIREMENTS AND WORK SCOPE REFER TO BGE
ELECTRIC SERVICE CONSTRUCTION PLAN AT THE END
OF BMCD ELECTRICAL CONSTRUCTION PLANS.
4. CONTRACTOR SHALL PROVIDE FINAL SHORT CIRCUIT
ANALYSIS AND COORDINATION STUDY AS SPECIFIED
UNDER SECTION 262713.
NOTES:
XFMR 'T3'
75kVA
480-208Y/120V
3Ø, 4-WIRE, 4.72% Z
CONNECTED LOAD = 655.8kVA
DEMAND LOAD = 649.8kVA
CONNECTED LOAD = 33kVA
DEMAND = 33kVA
CONNECTED LOAD = 105.9kVA
DEMAND LOAD = 90kVA
CONNECTED LOAD = 50.8kVA
DEMAND LOAD = 43.2kVA
PP2A
PP1A
150A
3P
CONNECTED LOAD = 156.6kVA
DEMAND LOAD = 125.3kVA
225AF
SPACE
225AF
SPACE
100A
3P
SPARE
40A
3P
SPARE
NEUTRAL
GROUND
WP
400AF
SPACE
225AF
SPACE
225AF
SPACE
3#12 AWG + 1#12 GROUND IN 3/4" CONDUIT
15A
3P
1-1/2
JOCKEY
PUMP
MM08/18/11 HM ISSUED FOR BID
C O P Y R I G H T
B U
R N
S
M c D
O N
N E
L L
E
N G
I N
E E
R I N
G
C
O M
P A
N Y
I N
C
MM09/14/12 EI ISSUED FOR
CONSTRUCTION
.07/10/13 AAC RESPONSE TO RFI#034
#09/#/14 # CONFORMING TO
CONSTRUCTION
RECORDS
File details come from the government source that posted it. Updated .