About this file
This amendment to a solicitation modifies the requirements for a firm fixed-price contract to repair roads and parking lots at Savannah International Airport. The scope of work includes milling and overlaying asphalt pavements, full depth repairs, pavement markings, traffic signs, and miscellaneous site work. The project budget is between $250,000 and $500,000 with a 270-day period of performance. The solicitation was issued by the 165th Airlift Wing, Georgia Air National Guard for NAICS code 237310 construction services. The small business size standard is $39.5 million average annual revenue. The amendment converts the bid guarantee provision from incorporation by reference to full text, specifying a requirement for 20% of the bid price or $500,000, whichever is less. It also renumbers contract line items and adds delivery schedules and acceptance terms for the new line items.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Answers to Bidders Questions.pdf | ||
| Site Visit Sign-in Sheet.pdf | ||
| Past Performance Questionnaire.pdf | ||
| ROADIMPROVE E.pdf | ||
| ROADIMPROVE D.pdf | ||
| ROADIMPROVE F.pdf | ||
| Parking In Front Bldg 1905 Addition A and B.pdf | ||
| W50S70-20-R-0014 SOLICITATION.pdf | ||
| RFI_Template.doc | DOC document | |
| XDQU202688 SOW.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F8W3CE0133AW01 XDQU 202688
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to convert provision 52.228-1 from incorpating by reference to full text identifying the bid gurantee percentage of 20%.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 18-Aug-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W50S7020R0014
X 9B. DATED (SEE ITEM 11)
03-Aug-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
18-Aug-2020
CODE
USPFO GA 165 MISSION SUPPORT CONTRACTING
1401 ROBERT B MILLER JR DRIVE
GARDEN CITY GA 31408-9001
W50S70 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W50S7020R0014
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00010 - SOLICITATION CONTRACT FORM
CLIN 0002
This CLIN has been renumbered to CLIN 0004.
CLIN 0003
This CLIN has been renumbered to CLIN 0005.
The option status has changed from No Status to Option.
CLIN 0004
This CLIN has been renumbered to CLIN 0006.
CLIN 0005
This CLIN has been renumbered to CLIN 0007.
CLIN 0002 is added as follows:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0002 1 Job
OPTION PARKING LOT OPTION A
FFP
REPAIR ROADS BILL BLAND BLVD PROJECT XDQU202688 PARKING
LOT NEAR 1905 EXTENSION OPTION A. See Statement of Work and Drawings.
FOB: Destination
MILSTRIP: F8W3CE0133AW01
MFR PART NR: NONE
PROJECT: XDQU 202688
SIGNAL CODE: A
PSC CD: Y1LB
NET AMT
CLIN 0003 is added as follows:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0003 1 Job
OPTION PARKING LOT OPTION B
FFP
REPAIR ROADS BILL BLAND BLVD PROJECT XDQU202688 PARKING
LOT NEAR 1905 EXTENSION OPTION B. See Statement of Work and Drawings.
FOB: Destination
MILSTRIP: F8W3CE0133AW01
MFR PART NR: NONE
PROJECT: XDQU 202688
SIGNAL CODE: A
PSC CD: Y1LB
NET AMT
DELIVERIES AND PERFORMANCE
The following Delivery Schedule for CLIN 0006 has been added:
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
280 dys. ANP 1 N/A
FOB: Destination
The following Delivery Schedule for CLIN 0007 has been added:
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
280 dys. ANP 1 N/A
FOB: Destination
INSPECTION AND ACCEPTANCE
The following Acceptance/Inspection Schedule was added for CLIN 0002:
INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
Destination Government Destination Government
The following Acceptance/Inspection Schedule was added for CLIN 0003:
INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
Destination Government Destination Government
SECTION 00700 - CONTRACT CLAUSES
The following have been added by full text:
52.228-1 BID GUARANTEE (SEP 1996)
(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States.
The Contracting Officer will return bid guarantees, other than bid bonds, (1) to unsuccessful bidders as soon as practicable after the opening of bids, and (2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.-
(c) The amount of the bid guarantee shall be ___20_____ percent of the bid price or $_500,000____, whichever is less.-
(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.-
(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.
(End of provision)
The following have been deleted:
52.228-1 Bid Guarantee SEP 1996
(End of Summary of Changes)