Answers to Bidders Questions.pdf
PDF 42 KB Posted
- Attached to
- Repair Roads Paving
- Solicitation number
- W50S70-20-R-0014
About this file
This document contains answers to bidder questions and details for a federal contract opportunity for road repair work. The contract involves milling and overlaying asphalt pavements, full depth pavement repair, installation of pavement markings and traffic signage. The contractor will remove and reinstall existing wheel stops and is not responsible for sidewalks behind the wheel stops. Thermoplastic paint is required for markings. The bid bond percentage is 20% and the project value is between $250,000 and $500,000. The contract completion time is 270 calendar days. The solicitation number is W50S70-20-R-0014 and is being issued by the Department of the Army Georgia Army National Guard to repair roads at the Savannah International Airport. The NAICS code is 237310 and the small business size standard is $39.5 million average annual revenue.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W50S70-20-R-0014-0001 SOLICITATION AMENDMENT.pdf | ||
| Site Visit Sign-in Sheet.pdf | ||
| Past Performance Questionnaire.pdf | ||
| ROADIMPROVE E.pdf | ||
| ROADIMPROVE D.pdf | ||
| ROADIMPROVE F.pdf | ||
| Parking In Front Bldg 1905 Addition A and B.pdf | ||
| W50S70-20-R-0014 SOLICITATION.pdf | ||
| RFI_Template.doc | DOC document | |
| XDQU202688 SOW.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Answers to Bidders Questions
1. In SOW, Sections 1.1, 2.4 and the drawings, there are references to striping paint and the color, but we cannot locate what type of paint is to be used on this project. Can you clarify?
Answer: The government requires the use of a thermoplastic paint markings and should be non-reflective.
2. During the site visit, it was mentioned that only the existing wheelstops were to be removed and reset? Can you confirm that this is the case and no new or additional wheelstops are to be added?
Answer: That is correct. The contractor is not to purchase or install any new wheelstops. The contractor is to remove the existing wheelstops and place to the side to re-install after paving and/or painting is complete. The government asks the contractor to be careful during the removal process of the wheelstops, but understands if a few get cracked or broken during removal and installation.
If cracked, the contractor is to place back as best they can for installation.
3. Please confirm that the paved sidewalks behind the existing wheelstops are not to be milled and repaved as discussed during the site visit.
Answer: That is correct. The contractor is not to concern themselves with the paved sidewalks behind the existing wheelstops. Although the sidewalks are not in the best shape, the contractor is to simply mill and pave the parking lot and ignore the sidewalk area.
4. How much is the bid bond percentage?
Answer: 20% as stated in the solicitation FAR Clause 52.228-1