Performance Work Statement - Fire Alarm Repair.pdf

PDF 473 KB Posted

Attached to
Repair Fire Alarm Deficiencies, Main Base
Solicitation number
W50S6T24QA013
Issued by

About this file

This document is a Performance Work Statement (PWS) that describes the contractor requirements for repairing fire alarm deficiencies at multiple buildings on the 144th Fighter Wing (FW) California Air National Guard main base in Fresno, California.

The key objectives of the PWS are to provide, repair, and perform annual certification for fire suppression systems/fire alarm panels where maintenance/certifications have lapsed. The work includes replacing various fire alarm components such as smoke detectors, heat detectors, pull stations, water flow switches, and batteries across 17 buildings, with an option for additional work on 11 more buildings. The contractor must follow all applicable NFPA, IBC, UFC, UFGS, AFI, DAFI, and AFMAN requirements. The project must be completed within 90 working days of the start of performance, and the contractor must provide a 1-year warranty on all work. The government will provide utilities and unsecured outdoor storage, while the contractor is responsible for secured storage. The contractor must have the appropriate California contractor's license and meet all other technical, security, and documentation requirements outlined in the PWS.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATMENT

REPAIR MAIN BASE FIRE DEFICIENCIES

PROJECT NO: HAYW061824

26 June 2024

144TH FIGHTER WING CALIFORNIA AIR

NATIONAL GUARD, FRESNO

1.0 DESCRIPTION OF SERVICES

This Performance Work Statement (PWS) describes contractor requirements for the project titled “Repair Fire Alarm Deficiencies, Multiple Buildings on 144 FW main base”. All work will occur at the Fresno Air National Guard Base, Fresno, California. The contractor is responsible to furnish and install all labor and materials to complete the items listed in this Performance Work Statement. The contractor shall provide the government a complete and usable product that will be inspected/accepted by the government at the completion of the project. All information included in this document, along with the instructions and standards referenced in the document, shall be considered as part of the Performance Work Statement.

2.0 SITE OF WORK

All work will occur at the

Fresno Air National Guard Base 5323 McKinley Ave, Fresno, CA 93727

3.0 PERFORMANCE

3.1 Objectives: The purpose of this project is to repair fire protection deficiencies for seventeen (17) buildings at the 144th Air National Guard (ANG) Base, Fresno, California. The work includes but is not limited to the following:

3.1.1 Provide, repair, and perform annual certification for fire suppression systems/fire alarm panels where annual maintenance/certifications have lapsed.

3.1.2 All work performed shall be in accordance with applicable National Fire Protection Association (NFPA), International Building Code (IBC), Unified Facility Criteria (UFC), Unified Facility Guidance Specifications (UFGS), Air Force Instruction (AFI), Department of the Air Force Instruction (DAFI) 32-2001 and Air Force Manual (AFMAN) requirements.

3.2 In addition to the general work requirements described above, the following outlines the work required within each facility with approximate existing locations, quantities, and systems compatible with Monaco Enterprises.

Building 100, 135, 145, 155, 157, 159, 225, and 228 are the primary building requiring repair and will be associated with CLIN 0001 as the base performance of this contract.

3.2.1 Building 100:

3.2.1.1 Replace one (1) smoke detector at second floor corridor in front of the communication room.

3.2.1.2 Replace one (1) tamper switch since the existing one doesn’t not report to the fire alarm.

3.2.1.3 Provide building panel annual certification when repair is completed.

3.2.2 Building 135:

3.2.2.1 Replace one (1) manual pull station at dining hall.

3.2.2.2 Provide building panel annual certification when repair is completed.

3.2.3 Building 145:

3.2.3.1 Replace eight (8) heat detectors at the bay area.

3.2.3.2 Provide building panel annual certification when repair is completed.

3.2.4 Building 155:

3.2.4.1 Replace one (1) water flow switch at the mechanical room.

3.2.4.2 Replace five (5) audible visual devices at the gym area.

3.2.4.3 Provide building panel annual certification when repair is completed.

3.2.5 Building 157:

3.2.5.1 Replace twenty (20) heat detectors throughout the building.

3.2.5.2 Replace two (2) water flow switches at the mechanical room.

3.2.5.3 Replace two (2) tamper switches at the mechanical room.

3.2.5.4 Replace two (2) batteries for the fire alarm panel.

3.2.5.5 Provide building panel annual certification when repair is completed.

3.2.6 Building 159:

3.2.6.1 Replace four (4) batteries at the fire alarm panels.

3.2.6.2 Provide building panel annual certification when repair is completed.

3.2.7 Building 225 and building 228:

3.2.7.1 Replace four (4) duct detectors throughout the building.

3.2.7.2 Replace one (1) water flow switch at the mechanical room.

3.2.7.3 Replace one (1) tamper switch at the mechanical room.

3.2.7.4 Replace one (1) battery for the fire alarm panel at the mechanical room.

3.2.7.5 Provide building panel annual certification when repair is completed.

3.3 As an option buildings 102, 117, 121, 123, 124, 130, and 194 will be associated with CLIN 0002 as the first option associated with this project.

3.3.1 Building 102:

3.3.1.1 Replace one (1) manual pull station at the vehicle maintenance shop.

3.3.1.2 Replace one (1) battery for the fire alarm panel at the breakroom.

3.3.1.3 Provide building panel annual certification when repair is completed.

3.3.2 Building 117:

3.3.2.1 Replace five (5) smoke detectors.

3.3.2.2 Replace two (2) heat detectors.

3.3.2.3 Replace three (3) manual pull stations.

3.3.2.4 Provide building panel annual certification when repair is completed.

3.3.3 Building 121:

3.3.3.1 Replace three (3) duct detectors: one (1) at boiler room and two (2) at machinal room.

3.3.3.2 Replace sixty-eight (68) heat detectors in the building since all are outdated.

3.3.3.3 Replace two (2) batteries for the fire alarm panel at the mechanical room.

3.3.3.4 Provide building panel annual certification when repair is completed.

3.3.4 Building 122:

3.3.4.1 Replace five (5) heat detectors; one (1) at Men restroom, two (2) at Woman restroom, two (2) at PPE room.

3.3.4.2 Replace twenty-eight (28) smoke detectors throughout the building.

3.3.4.3 Replace one (1) audible visual devices.

3.3.4.4 Replace one (1) battery for fire alarm panel.

3.3.4.5. Provide building panel annual certification when repair is completed.

3.3.5 Building 123:

3.3.5.1 Replace one (1) manual pull station on the outside of the building.

3.3.5.2 Replace two (2) smoke detectors at the tool room.

3.3.5.3 Provide building panel annual certification when repair is completed.

3.3.6 Building 130:

3.3.6.1 Replace fifty-two (52) heat detectors throughout the building.

3.3.6.2 Replace six (6) smoke detectors throughout the building.

3.3.6.3 Replace one (1) battery at fire alarm panel.

3.3.6.4 Provide building panel annual certification when repair is completed.

3.3.7 Building 194

3.3.7.1 Replace one (1) tamper switch at the mechanical room.

3.3.7.2 Provide building panel annual certification when repair is completed.

3.4 As an option buildings 124 and 136 will be associated with CLIN 0003 as the second option associated with this project.

3.4.1 Building 124:

3.4.1.1 Replace two (2) duct detectors.

3.4.1.2 Provide building panel annual certification when repair is completed.

3.2.10 Building 136:

3.2.10.1 Replace two (2) smoke detectors.

3.2.10.2 Replace one (1) pull station(s).

3.2.10.3 Provide building panel annual certification when repair is completed.

3.5 Directions:

3.5.1 Complete all work according to manufacturers’ specifications.

3.5.2 All electrical work (if required) will be done with the trade labor’s best practices and in accordance with the

NEC.

3.5.3 Contractor must be qualified and experienced in accordance with NFPA requirements.

3.5.4 Remove and replace non-compliant devices that no longer meet NFPA requirements.

3.5.5 The new addressable fire panel and devices will be tested to 100% functionality after installation.

3.5.6 All fire protection systems shall use equipment that is Underwriter’s Laboratory (UL) listed or Factory Mutual (FM) approved for its intended fire protection service.

3.5.7 Systems shall utilize supervised non-proprietary generic type detection devices and notification appliances and shall be interchangeable with other brands that are readily available to the extent practical.

3.6 Demolition

3.6.1 All materials removed by the Contractor shall be inspected by the Contracting Officer Representative (COR) and determined as salvageable or disposable materials. All material determined to be disposable by the COR becomes the property of the Contractor and shall be removed and disposed of, off government property.

3.6.2 Existing electrical conduit and cable shall be protected and remain in place during demolition work and if possible, electrical cable shall be reused to power the replacement equipment if compatible.

4.0 CONTRACTOR LICENSE REQUIREMENTS

4.1 The contractor will possess a valid California “B” or “C-10” license or an applicable State issued general or specialty contractor’s license and be able to provide proof of competence in the area of work. The contractor may self-perform sections of the project.

4.2 All listed sub-contractors working for the contractor will possess the applicable Contractor’s license. The contractor must be able to provide a C-10 (or state equivalent) specialty license.

5.0 PROJECT SPECIFIC REQUIREMENTS

5.1 The project will be completed no later than 90 working days after the start of performance. Moving furniture and removal/replacement of wall hung items such as bulletin boards is the responsibility of the government. Cabinets and fixtures will remain in place during the project. The contractor and government will discuss the final phasing (if applicable) and schedule during the post-award conference.

5.2 Materials. All material requests shall be made in writing on the AF Form 3000. All components must be compatible with Monaco Enterprises systems. Requests for material substitutions made after the post-award conference may not be granted by the Government.

6.0 GENERAL REQUIREMENTS

6.1 When required, the Contractor will attend a Post‐Award Conference. The Post-Award Conference will generally be scheduled after award but prior to mobilization performance. At a minimum, the contractor shall have their project manager and site superintendent attend the meeting. The Contractor will provide the following documents at the Post-Award Conference:

6.1.1 Project Schedules

6.1.2 Material Submittals

6.2 Utilities and Storage. The government will provide water, sewer, and electrical connections. Unsecure outdoor storage area at the base is available and must be requested through the COR prior to utilizing. Secured storage is the responsibility of the contractor.

6.3 Quality Control. Contractor shall develop and maintain a quality program to ensure work is performed as described in this Performance Work Statement and in accordance with all local, state, and federal rules.

6.4 Quality Assurance. The Government will maintain a Quality Assurance Program to ensure work is performed as described in this Performance Work Statement and in accordance with all local, state, and federal rules. The COR will manage the Government’s QA program.

6.5 Hours of Operation. The hours of work shall be between 7:00 a.m. and 4:30 p.m. Monday through Friday unless otherwise prescribed by this Performance Work Statement. Work shall not be performed on Weekends, Federal Holidays, and Scheduled Days Off (SDO) without prior coordination from the COR. The base participates in a 5-4-9 compressed work schedule with an SDO typically occurring every two weeks. A schedule will be provided upon contract award.

6.6 Access and General Protection/Security Policy and Procedures. This standard language is for contractor employees with an area of performance within Government controlled installation, facility, or area. The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the Contracting Officer’s Representative (COR). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the local installation’s Security Forces, Director of Emergency Services or local Security Office. The contractor shall ensure compliance with all personal identity verification requirements as directed by DoD, HAF and/or local policy. Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.

6.6.1 The contractor’s employees shall become familiar with and obey the regulations of the installation, including fire, traffic, safety and security regulations while on the installation. Contractor employees should only enter restricted areas when required to do so and only upon prior approval. All contractor employees shall carry proper identification with them at all times and shall be subject to such checks as may be deemed necessary. The contractor shall ensure compliance with all regulations and orders of the installation, which may affect performance. The Government reserves the right to direct the removal of an employee from Government property or revoke access to Government systems for misconduct, security reasons, or any overt evidence of communicable disease. Removal of contractor employees for reasons stated above does not relieve the Contractor from responsibility for total performance of this contract.

6.6.2 Unscheduled gate closures by the Security Police may occur at any time causing all personnel entering or exiting a closed installation to experience a delay. This cannot be predicted or prevented. Contractors are not compensated for unexpected closures or delays. Vehicles operated by contractor personnel are subject to search pursuant to applicable regulations. Any moving violation of any applicable motor vehicle regulation may result in the termination of the contractor employee’s installation driving privileges.

6.6.3 For Contractors that do not require CAC but require access to a DoD Facility and/or Installation.

Contractor and all associated sub‐contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC‐III) and Terrorist Screening Database (TSDB) (AFI 10‐245, AFI 31‐101 and AFMAN 31‐113), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.

6.6.3.1 Base Access. Base security requires all personnel entering the installation be cleared for access. The contractor will provide first name, last name, date of birth and DBIDS code for all personnel accessing the base. The contractor shall submit this information using the Wing Form and DBIDS Pre-Enrollment application no later than five (5) business days prior to the date of required access. Foreign national reviews require 45 business days for review. All contractor personnel must maintain a valid driver’s license, vehicle registration/proof of insurance (if applicable) at all times while on base. A Real ID is the preferred identification for base vetting purposes. In lieu of a Real ID, Original Social Security Card and Original Birth Certificate or a valid U.S. Passport will suffice. The primary method of Antiterrorism Awareness Level I Training will be by instructor.

6.6.3.1.1 DBIDS Pre-enrollment: https://dbids-global-enroll.dmdc.mil/preenrollui/#!/

6.6.3.1.2 Upon completion or termination of the contract or expiration of the identification passes, the prime contractor shall ensure that all base identification passes issued to employees and subcontractor employees are returned to the issuing office.

6.6.3.1.3 Failure to comply with these requirements may result in withholding of final payment.

6.6.4 Antiterrorism Awareness Level I Training (AT Level I). This standard language is for contractor employees with an area of performance within a US Government controlled installation, facility or area. All contractor employees, to include subcontractor employees, requiring access to US Government installations, facilities and controlled access areas shall complete AT Level I training within 45 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. AT Level I may be accomplished by a Level I qualified instructor; completing the Force Protection computer-based training (CBT) course on Joint Knowledge Online (JKO) at https://jkodirect.jten.mil/Atlas2/ faces/page/login/Login.seam. For those without a CAC, select "Non-CAC" user on the JKO site. Tracking for each contractor or subcontractor employee is the responsibility of the COR or unit AT Representative.

6.7 Communications Security/Information Technology (COMSEC/IT) Security. All communications with DoD organizations are subject to COMSEC review. All telephone communications networks are continually subject to intercept by unfriendly intelligence organizations. DoD has authorized the military departments to conduct COMSEC monitoring and recording of telephone calls originating from, or terminating at, DoD organizations. Therefore, the contractor is advised that any time contractor personnel place or receive a call they are subject to COMSEC procedures. The contractor shall ensure wide and frequent dissemination of the above information to all employees dealing with DoD information. The contractor shall abide by all Government regulations concerning the authorized https://dbids-global-enroll.dmdc.mil/preenrollui/#!/ use of the Government's computer network, including the restriction against using the network to recruit Government personnel or advertise job openings.

6.8 Physical Security. The contractor shall safeguard all Government property provided for contractor use. At the close of each work period, Government facilities, equipment and materials shall be secured.

6.9 The Contractor, and all listed sub‐contractors, must be State licensed. Refer to the Project Specific Requirements section for the required license from the Contractor.

6.10 Technical Competence and Ability. If requested by the Government, the Contractor shall provide proof of technical competence and experience in the area of expertise required by this Performance Work Statement. The contractor shall be prepared to submit documents providing proof of successful competence such as training certificate or accreditations from recognized industry leaders. Contractors shall also be prepared to provide proof of successful project experience through references of former clients in related project types.

6.11 Dimensions and Quantity. All dimensions and quantities provided in the Performance Work Statement are estimates only. They are provided as a courtesy for contractors to estimate the magnitude of work or materials necessary to complete a task. They are not intended to be final measurements. The Contractor is responsible for verifying all dimensions and quantities in the field prior to starting work.

6.12 Submittals. All submittals will be transmitted with an AF Form 3000. When submitting on a finish, texture, or other material characteristic where a photograph is unacceptable, the Contractor will provide a sample of the material for review and approval along with the product cut‐sheet.

6.13 Warranty. The contractor shall guarantee all workmanship and materials covered under this Performance Work Statement for a period of no less than one (1) year from the date of project acceptance. This contractor’s warranty shall be included with any manufacturer’s warranties that accompany materials or systems installed as part of this Performance Work Statement.

7.0 CLOSEOUT DOCUMENTATION

7.1 10% Retainage will be released upon receipt of the following items:

7.1.1 Contractor workmanship letter of warranty up to one year.

7.1.2 Certificates of no debts to suppliers and vendors.

7.1.3 Electronic pictures showing the area before and after repair.

7.1.4 Recycling or Landfill proof of disposition document (if available).

7.1.5 All applicable O&M manuals

8.0 DEFINITIONS

Contractor: A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.

Contracting Officer (KO): A person with authority to enter, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.

Contracting Officer Representative (COR): An employee of the U.S. Government designated by the KO to monitor contractor performance. Such appointment will be in writing and will state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor if that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.

Defective Service: A service output that does not meet the standard of performance associated with the PWS.

Deliverable: Anything that can be physically delivered and includes non‐manufactured things such as meeting minutes or reports.

Physical Security: Actions that prevent the loss or damage of Government property.

Quality Assurance: The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.

Quality Control: All necessary measures taken by the Contractor to ensure that the quality of the end product or service shall meet contract requirements.

Subcontractor: One that enters a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.

9.0 ACRONYMS

AF Air Force AFI Air Force Instruction AFMAN Air Force Manual ANG Air National Guard AT Antiterrorism CAC Common Access Card COMSEC Communications Security COR Contracting Officer Representative DBIDS Defense Biometric Identification System DFARS Defense Federal Acquisition Regulation Supplement DoD Department of Defense DoDI Department of Defense Instruction FAR Federal Acquisition Regulation FM Factory Manual FPCON Force Protection Condition FSD Fire Safety Deficiency FW Fighter Wing HAF Headquarters Air Force IAW In Accordance With IBC International Building Code ID Identification IT Information Technology JKO Joint Knowledge Online KO Contracting Officer NCIC-III National Crime Information Center Interstate Identification Index NEC National Electrical Code NFPA National Fire Protection Association NLT No later than

O&M Operations and Maintenance

OCONUS

PWS

Outside the Contiguous United States Performance Work Statement

QA Quality Assurance QC Quality Control SDO Scheduled Day Off TE Technical Exhibit TSDB Terrorist Screening Database UFC Unified Facilities Criteria UFGS Unified Facilities Guide Specifications UL Underwriter’s Laboratory US United States

10.0 APPLICABLE PUBLICATIONS

Publications applicable to this PWS are listed below:

Publication (Chapter/Page)

Date of Publication

Website

Federal Acquisition Regulation https://www.acquisition.gov/?q=browsefar Defense Federal Acquisition Regulation

Supplement http://www.acq.osd.mil/dpap/dars/dfarspgi/current/in dex.html or https://www.acquisition.gov/dfars

AFI 10-245

Antiterrorism 03/28/2013 (Certified current 03/30/2017) https://www.e-publishing.af.mil/Product- Index/#/?view=pubs&orgID=10141&catID=1&serie s=-1&modID=449&tabID=131

AFI 31-101

Security Forces Standards and Procedures 08/18/2020 https://www.e-publishing.af.mil/Product- Index/#/?view=pubs&orgID=10141&catID=1&serie s=-1&modID=449&tabID=131

AFI 32-10141

Planning and Programming Fire Safety Deficiency Correction Projects

05/15/2019 https://static.e-publishing.af.mil/production/1/af_a4/publication/afi3

2-10141/afi32-10141.pdf

AFMAN 31-113

Security Forces Standards and Procedures 03/05/2013 Change 1:

12/02/2015 https://www.e-publishing.af.mil/Product- Index/#/?view=pubs&orgID=10141&catID=1&serie s=-1&modID=449&tabID=131 DoDI 2000.16

DoD Antiterrorism (AT) Standards 10/02/2006 Change 2:

12/08/2006 https://www.acq.osd.mil/ncbdp/nm/pseag/news-references/references/DoDI_2000.16.pdf?msclkid=7

28dd2c3cfd211ecb0249768548f21c5

UFGS 26 20 00

Interior Distribution System 08/01/2019 Change 3:

11/01/2021 https://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs/ufgs-26-20-00

UFGS 26 52 00.00 40

Emergency Lighting

11/01/2017 https://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs/ufgs-26-52-00-00-40 https://www.acquisition.gov/?q=browsefar http://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html http://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html https://www.acquisition.gov/dfars https://www.e-publishing.af.mil/Product-Index/#/?view=pubs&orgID=10141&catID=1&series=-1&modID=449&tabID=131 https://www.e-publishing.af.mil/Product-Index/#/?view=pubs&orgID=10141&catID=1&series=-1&modID=449&tabID=131 https://www.e-publishing.af.mil/Product-Index/#/?view=pubs&orgID=10141&catID=1&series=-1&modID=449&tabID=131 https://www.e-publishing.af.mil/Product-Index/#/?view=pubs&orgID=10141&catID=1&series=-1&modID=449&tabID=131 https://www.e-publishing.af.mil/Product-Index/#/?view=pubs&orgID=10141&catID=1&series=-1&modID=449&tabID=131 https://www.e-publishing.af.mil/Product-Index/#/?view=pubs&orgID=10141&catID=1&series=-1&modID=449&tabID=131 https://static.e-publishing.af.mil/production/1/af_a4/publication/afi32-10141/afi32-10141.pdf https://static.e-publishing.af.mil/production/1/af_a4/publication/afi32-10141/afi32-10141.pdf https://static.e-publishing.af.mil/production/1/af_a4/publication/afi32-10141/afi32-10141.pdf https://www.e-publishing.af.mil/Product-Index/#/?view=pubs&orgID=10141&catID=1&series=-1&modID=449&tabID=131 https://www.e-publishing.af.mil/Product-Index/#/?view=pubs&orgID=10141&catID=1&series=-1&modID=449&tabID=131 https://www.e-publishing.af.mil/Product-Index/#/?view=pubs&orgID=10141&catID=1&series=-1&modID=449&tabID=131 https://www.acq.osd.mil/ncbdp/nm/pseag/news-references/references/DoDI_2000.16.pdf?msclkid=728dd2c3cfd211ecb0249768548f21c5 https://www.acq.osd.mil/ncbdp/nm/pseag/news-references/references/DoDI_2000.16.pdf?msclkid=728dd2c3cfd211ecb0249768548f21c5 https://www.acq.osd.mil/ncbdp/nm/pseag/news-references/references/DoDI_2000.16.pdf?msclkid=728dd2c3cfd211ecb0249768548f21c5 https://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs/ufgs-26-20-00 https://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs/ufgs-26-20-00 https://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs/ufgs-26-52-00-00-40 https://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs/ufgs-26-52-00-00-40

NFPA 13

Standard for the Installation of Sprinkler

Systems

2022 Edition https://www.nfpa.org/codes-and-standards/all-codes-and-standards/list-of-codes-and-standards/detail?code=13

NFPA 70

National Electrical Code 2020 Edition https://www.nfpa.org/codes-and-standards/all-codes-and-standards/list-of-codes-and-standards/detail?code=70

NFPA 72

National Fire Alarm and Signaling Code

2022 Edition https://www.nfpa.org/codes-and-standards/all-codes-and-standards/list-of-codes-and-standards/detail?code=72

NFPA 101

Life Safety Code 2021 Edition https://www.nfpa.org/codes-and-standards/all-codes-and-standards/list-of-codes-and-standards/detail?code=101

UFC 3-601-02

Fire Protection Systems Inspection, Testing, And Maintenance

10/07/2021 https://wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-3-601-02

11.0 APPLICABLE FORMS

Forms applicable to the PWS are listed below:

Form Date Website Base Access Request Form N/A N/A (Local copy provided after award)

AF3000

Material Approval Submittal

08/31/2003 https://static.e-publishing.af.mil/production/1/saf_aq/form/af3000/af3000.pdf

DD 1354

Transfer and Acceptance of DoD Real

Property

AUG 2013 https://www.esd.whs.mil/Portals/54/Documents/DD/forms/dd/dd13 54.pdf https://www.nfpa.org/codes-and-standards/all-codes-and-standards/list-of-codes-and-standards/detail?code=13 https://www.nfpa.org/codes-and-standards/all-codes-and-standards/list-of-codes-and-standards/detail?code=13 https://www.nfpa.org/codes-and-standards/all-codes-and-standards/list-of-codes-and-standards/detail?code=13 https://www.nfpa.org/codes-and-standards/all-codes-and-standards/list-of-codes-and-standards/detail?code=70 https://www.nfpa.org/codes-and-standards/all-codes-and-standards/list-of-codes-and-standards/detail?code=70 https://www.nfpa.org/codes-and-standards/all-codes-and-standards/list-of-codes-and-standards/detail?code=70 https://www.nfpa.org/codes-and-standards/all-codes-and-standards/list-of-codes-and-standards/detail?code=72 https://www.nfpa.org/codes-and-standards/all-codes-and-standards/list-of-codes-and-standards/detail?code=72 https://www.nfpa.org/codes-and-standards/all-codes-and-standards/list-of-codes-and-standards/detail?code=72 https://www.nfpa.org/codes-and-standards/all-codes-and-standards/list-of-codes-and-standards/detail?code=101 https://www.nfpa.org/codes-and-standards/all-codes-and-standards/list-of-codes-and-standards/detail?code=101 https://www.nfpa.org/codes-and-standards/all-codes-and-standards/list-of-codes-and-standards/detail?code=101 https://wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-3-601-02 https://wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-3-601-02 https://static.e-publishing.af.mil/production/1/saf_aq/form/af3000/af3000.pdf https://static.e-publishing.af.mil/production/1/saf_aq/form/af3000/af3000.pdf https://www.esd.whs.mil/Portals/54/Documents/DD/forms/dd/dd1354.pdf https://www.esd.whs.mil/Portals/54/Documents/DD/forms/dd/dd1354.pdf

TECHNICAL EXHIBIT I

Deliverables Schedule

PWS Reference / Deliverable Title

Frequency Number of Copies

Medium/Format Submit To

6.1.1 Project Schedule

Before performance, Revisions as needed

1 copy Electronic (PDF or Word format)

COR

6.1.2 Safety Plan

Before performance 1 copy Electronic (PDF or Word format)

COR

6.1.3 Quality Control Plan

Before performance 1 copy Electronic (PDF or Word format)

COR

6.1.5 Material Safety Data

Sheets

Before performance 1 copy Electronic (PDF format)

COR

6.6.3.1, 11.0 Base Access Request

Form

Initial request shall be provided no later than five

(5) business days prior to the anticipated performance start date.

Revised requests shall be provided as they become known and allow at least five

(5) business days for processing.

1 copy Electronic (PDF format)

COR

6.6.3.1.2 Identification Media

Return within 10 business days of employee’s departure from contract performance.

Original(s) Hard Copy COR

5.4, 6.1.4, 6.12 Material Submittals

Before performance; As needed

1 copy Electronic (PDF format)

KO

6.13, 7.1.1 Warranty Letter

Upon completion 1 copy Electronic (PDF format)

COR

7.1.2 Certificates of no

debts to suppliers and vendors

Upon completion 1 copy Electronic (PDF format)

COR

7.1.3 Before & After

Photos

Upon completion 1 copy Electronic (PNG or

JPEG)

COR

3.4.1, 7.1.4 Recycling or Landfill proof of disposition

Upon completion 1 copy Electronic (PDF format)

COR

document (if available)

6.1.7, 7.1.6 DD 1354 Transfer and Acceptance of DoD Real Property

Draft before start of performance; Final upon completion

1 copy Electronic (PDF format)

COR

7.1.5 O&M Manuals (if

applicable)

Upon completion 1 copy Electronic (PDF or Word format)

COR

7.1.7 Contractor

Completed As-Builts

Upon completion 1 copy Electronic (PDF or Word format)

COR

1.0 DESCRIPTION OF SERVICES
9.0 ACRONYMS

File details come from the government source that posted it. Updated .