Site Visit Attendance_Redacted.pdf
PDF 2 MB Posted
- Attached to
- Entry Point Awnings & Utilities
- Solicitation number
- W50S6N-21-B-0004
About this file
This solicitation is for construction services to provide two entry point awnings and utility infrastructure at an Air National Guard base in Montgomery, Alabama. The scope of work includes constructing two free-standing awning structures over vehicle and truck inspection lanes at the entry control point, as well as installing electric and water utility lines to service the adjacent area. The procurement is set aside for small businesses with average annual revenue under $39.5 million. The construction completion period is 120 calendar days from notice to proceed. A pre-bid site visit is scheduled for July 15, 2021 at 9:00 AM Central Time. The solicitation documents can be found on the Federal Business Opportunities website under solicitation number W50S6N-21-B-0004 issued by the Department of the Army Alabama Army National Guard.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ABSTRACT ECP AWNING.pdf | ||
| Base Utility Map (for information only).pdf | ||
| Copy of Responses - RFIs - ECP Awnings_Utilities.xlsx | XLSX spreadsheet | |
| Conformance Drawings - Dannelly Entry Control Point - Phase I.pdf | ||
| SF30 SOLICITATION AMENDMENT 0001.pdf | ||
| WD AL20210093 7_23_2021.pdf | ||
| Pre-Bid slides ECP Awning.ppt | PPT presentation | |
| W50S6N21B004 SOL..pdf | ||
| STATEMENT OF WORK for ECP awning and utilities.pdf | ||
| WD AL20210093.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .